Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20203J809 + (05:27:57, 24 May 2025)
- IR 05000298/1997018 + (05:28:08, 24 May 2025)
- ML20203J753 + (05:28:16, 24 May 2025)
- ML20203J705 + (05:28:36, 24 May 2025)
- HBL-98-002, Submits Updated Post-Shutdown Decommissioning Activities Rept for Humboldt Bay Power Plant,Unit 3. Safstor Decommissioning Plan Will Be Considered FSAR for Hbpp + (05:28:54, 24 May 2025)
- TXX-9802, Forwards Rev 26 to Technical Requirements Manual, for Cpses.Detailed Description of Changes,Encl + (05:29:12, 24 May 2025)
- 05000458/LER-1997-010, :on 971111,high Pressure Core Spray Minimum Flow Valve Discovered to Be in Closed Position Due to Air in Transmitter Sensing Lines.Hpcs Pump Was Run & No Abnormalities Were Noted + (05:29:19, 24 May 2025)
- IR 05000346/1996014 + (05:29:21, 24 May 2025)
- ML20203J554 + (05:29:26, 24 May 2025)
- ML20203J522 + (05:29:34, 24 May 2025)
- ML20203J493 + (05:29:40, 24 May 2025)
- IR 05000413/1997014 + (05:29:50, 24 May 2025)
- 05000461/LER-1998-006, :on 980131,incorrect Calculation in DG Control Circuitry Results in Insufficient Voltage & Inoperability of Div 1 Dg,Was Discovered.Caused by Initial Error in Calculation.Dg Control Panel Voltage Restored + (05:29:55, 24 May 2025)
- 05000461/LER-1997-029, :on 971113,failure to Follow Plant Procedure When Erecting Scaffold Resulted in SR Area Cooler Becoming Inoperable Due to Seismic Qualification Concerns.Caused by Failure to Follow Plant Procedure.Modified Scaffold + (05:31:04, 24 May 2025)
- ML20203J174 + (05:31:19, 24 May 2025)
- ML20203J161 + (05:31:24, 24 May 2025)
- 05000382/LER-1997-021, :on 970611,inside & Outside Containment Isolation Valves Failed Leakage Criteria.Caused by Excessive Corrosion.Piping Penetration Drained,Repaired & Replaced Defective Valves & Restored Penetration to Leakage Criteria + (05:31:31, 24 May 2025)
- 05000289/LER-1996-002, :on 961221,potential Loss of ECCS Pump Suction in Accident Analysis Was Noted Due to Failure to Recognize Effect of Lower RB Pressure.Changed Procedures & Trained Operators to Initiate Swapover at Different Setpoint + (05:31:51, 24 May 2025)
- ML20203H997 + (05:32:08, 24 May 2025)
- L-98-029, Submits Info Re Property Damage Insurance Coverages for Site of BVPS Located in Borough of Shippingport,County of Beaver & Commonwealth of PA + (05:32:17, 24 May 2025)
- ML20203H943 + (05:32:23, 24 May 2025)
- ML20203H921 + (05:32:29, 24 May 2025)
- ML20203H884 + (05:32:37, 24 May 2025)
- ML20203H881 + (05:32:38, 24 May 2025)
- IR 05000321/1986014 + (05:32:50, 24 May 2025)
- ML20203H770 + (05:33:43, 24 May 2025)
- TXX-9726, Responds to NRC RAI by Clarifying That Applicability of LAR 96-003 Is Limited to Unit 1.Assumed Analytical Value of Low Compensated Steamline Pressure Trip Function Was Not Required to Be Changed from 380 Psig Currently in Use + (05:34:23, 24 May 2025)
- ML20203H534 + (05:34:44, 24 May 2025)
- ML20203H405 + (05:35:16, 24 May 2025)
- NUREG-1525, Summary of 971205 Meeting in Rockville,Md Re NRC Enforcement Policy & Enforcement Program.List of Attendees,Summary of Meeting & Handout Provided at Meeting Encl + (05:35:23, 24 May 2025)
- ML20203H197 + (05:37:09, 24 May 2025)
- IR 05000483/1997020 + (05:37:16, 24 May 2025)
- IR 07100026/2012006 + (05:37:21, 24 May 2025)
- IR 05000245/1997081 + (05:37:28, 24 May 2025)
- ML20203G925 + (05:38:35, 24 May 2025)
- ML20203G921 + (05:38:37, 24 May 2025)
- IR 05000382/1997024 + (05:38:38, 24 May 2025)
- 05000289/LER-1998-001, :on 980122,failure to Operate & Maintain Flow Instruments within Design Basis Occurred.Caused by Improper Application of Stds for Resolution of Degraded or non- Conforming Conditions.Operators Trained + (05:39:39, 24 May 2025)
- IR 05000293/1997099 + (05:40:10, 24 May 2025)
- ML20203G635 + (05:40:14, 24 May 2025)
- 05000266/LER-1998-006, :on 980122,unanticipated Partial Svc Water Sys Isolation During Special Test Occurred.Caused by Inadequate Test Procedure.Procedure PBTP-77 Will Be Archived W/ Documentation of Deficiencies + (05:41:07, 24 May 2025)
- ML20203G375 + (05:41:25, 24 May 2025)
- IR 05000354/1997007 + (05:41:29, 24 May 2025)
- 05000461/LER-1998-002, :on 980123,loss of Svc & Instrument Air Occurred Due to Trip of Operating Air Compressor.Caused by Inadequate Design in Control of Cooling Water Supply to Compressors Lube Oil Coolers.Will Modify Components + (05:41:31, 24 May 2025)
- TAC:M99857 + (05:41:44, 24 May 2025)
- PNO-V-93-009D, on 930325,leakage from Reactor Coolant Sys Occurred.Cause of Leak Not Determined + (05:42:02, 24 May 2025)
- ML20203G245 + (05:42:04, 24 May 2025)
- 05000382/LER-1997-029, :on 971113,inadequate Surveillance Testing of Relay Contacts in safety-related Logic Circuits Noted.Caused by Inadequate Surveillance Procedure OP-903-094.Revised Procedure & Tested Applicable Contacts + (05:42:15, 24 May 2025)
- ML20203G191 + (05:42:22, 24 May 2025)
- 05000382/LER-1997-028, :on 970720,automatic Start of EDG a Occurred Due to Loss of Power to 3A Safety Bus.Caused by Spurious Trip of 86A2 Relay.Reset 86A2 Relay,Closed 2-3 Tie Breaker & Restored Offsite Power + (05:42:26, 24 May 2025)
- ML20203G164 + (05:42:28, 24 May 2025)