ML20203H197
| ML20203H197 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 07/23/1986 |
| From: | Grimsley D NRC OFFICE OF ADMINISTRATION (ADM) |
| To: | Garde B GOVERNMENT ACCOUNTABILITY PROJECT |
| Shared Package | |
| ML20203H205 | List: |
| References | |
| FOIA-86-387 NUDOCS 8608040336 | |
| Download: ML20203H197 (7) | |
See also: IR 05000445/1985018
Text
Tbfz-o/6
ff
4
UNITED STATES
g
'
y
g
NUCLEAR REGULATORY COMMISSION
7.
j
WASHINGTON, D. C. 20555
k ... /
JUL 2 31986
Ms. Billie P. Garde
Citizens Clinic Director
Government Accountability Project
1555 Connecticut Avenue, NW, Suite 202
IN RESPONSE REFER
Washington, DC 20036
TO F01A-86-387
Dear Ms. Garde:
This is in partial response to your letter dated May 22, 1986, in which you
requested, pursuant to the Freedom of Information Act (F0IA), all records
relevant to and/or generated in connection with Inspection Report 50-445/85-18,
50-446/85-15 dated May 12, 1986, on the Comanche Peak nuclear power plant.
The document listed on the enclosed Appendix A is already available in the NRC
Public Document Room (PDR), 1717 H Street, NW, Washington, DC 20555. The
documents listed on the enclosed Appendix B are being placed in the PDR in file
folder F01A-86-387 in your name.
The documents listed on the enclosed Appendix C are being being withheld in
their entirety pursuant to Exemption (5) of the F0IA (5 U.S.C. 552(b)(5)) and
10 CFR 9.5(a)(5) of the Commission's regulations. These documents are drafts
and other predecisional documents which contain advice, opinions, and
'
recommendations of the staff.
Pursuant to 10 CFR 9.9 of the Commission's regulations, it has been determined
that the information withheld is exempt from production or disclosure and that
its production or disclosure is contrary to the public interest. The persons
-
"
responsible for this denial are the undersigned and Mr. Robert D.. Martin,
Regional Administrator, RIV.
This denial may be appealed to the NRC's Executive Director for Operations
within 30 days from the receipt of this letter. Any such appeal must be in
writing, addressed to the Executive Director for Operations, U.S. Nuclear
Regulatory Commission, Washington, DC 20555, and should clearly state on the
envelope and in the letter that it is an " Appeal from an Initial F0IA Decision."
The review of two documents subject to your request is continuing. As soon as
the review has been completed, we will inform you of our disclosure
determinations.
Sincerely,
Donnie H. Grimsley, Director
Division of Rules and Records
Office of Administration
Enclosures: As stated
$80g6860723
CARDE86-387
I
J
s
.
.
Appendix A
FOIA 86-387
'
Documents in l'DR
5/12/86
Letter and Inspection Report 50-445/85-18, and
Accession ':o.
50-446/85-15
8605280184
?
O
.
Appendix B
FOIA 86-387
'
Documents for Release
CPSES Design Change Authorization, DCA No. 13,023
1.
5/5/82-
Rev 1
(2 pages)
Witnessed Inspection, Pkg No. I-S-SBPS-284,
2.
12/5/85
(1 page)
Comanche Peak Review Team Checklist 3[ assorted
3.
8/8/85
attachments, Verif Pkg No. I-E-ININ-053
(8 pages)
4.
10/31/85
Reinspection, ISAP No. VIIc, Equip. No.
I-M-LBCO-091
(1 page)
5.
11/7/85
NRC Witnessed Inspection, ISAP No. VIIc, Pkg
No. I-M-SBCO-083,
(1 page)
1
6.
11/18/85
Reinspection, ISAP No. VIIc, Verif Pkg No.
I-M-LBCO-127
(1 page)
7.
11/23/85
NRC Independent Inspections of ERC Inspections
ISAP No. VIIc, Verif Pkg No. I-S-PWRE-528,
3[ assorted attachments
(6 pages)
8.
12/4/85
Witnessed inspection, Pkg No. I-S-CONC-080,
(2 pages)
9.
12/5/85
NRC Inspectlon, ERC Inspections Witnessed by
the NRC, ISAP No. VIIc, Verif Pkn No. I-S-PWRE-536,
(1 page)
i
'
.
.
Appendix B
FOIA 86-387
,
Page 2
Documents for Release
10.
12/6/85
Independent Reinspection, ISAP No. VIIc,
Verif Pkg No. I-E-CABL-026,
(3 pages)
11.
12/7/85
NRC Independent Inspection of ERC Inspections
ISAP No. VIIc, Verif Pkg No. I-S-PWRE-545,
y assorted attachments
(6 pages)
12.
12/7/85
NRC Independent Inspections of ERC Inspections
ISAP No. VIIc, Verif Pkg No. I-S-INSP-023,
y assorted attachments
(20 pages)
13.
12/7/85
Independent Inspection, Pkg No. I-S-CONC-019,
y assorted attachments
(6 pages)
14.
12/7/85
Independent Inspection, Pkg No. I-S-SBPS-051,
y assorted attachments
(8 pages)
?
15.
12/7/85
Independent Inspection, Pkg No. I-S-SBPS-067,
y assorted attachments
(7 pages)
16.
12/11/85
NRC Independent Inspection of ERC Inspection,
ISAP No. VIIc, Verif Pkg No. I-M-SBCO-022,
y assorted attachments
(1 page)
17.
12/11/85
Independent Inspection, Pkg No. I-S-SBPS-003,
y assorted attachments
(5 pages)
18.
/12/85
Independent reinspection, ISAp No. VIIc Verif
Pkg No. I-C-CABL-092
(4 pages)
/
-
.
.
Appendix B
FOIA 86-387
.
Page 3
Documents for Release
19.
12/12/85
Independent Reinspection, ISAP No. VIIc,
Verif Pkg No. I-E-CABL-025
(3 pages)
20.
12/13/85
Review of Inspection Module in I6E Manual,
(1 page), Inspection Procedure 50100 (12.pages)
21.
12/14/85
Independent Inspection, Pk,, No. I-S-SBPS-254,
w assorted attachments
(14 pages)
22,
12/14/85
Independent Inspection, Pkg No. I-S-SBPS-017,
w assorted attachments
(7 pages)
23.
12/20/85
TUCCo management structure
(3 pages)
24.
1/6/86
Letter Thomas & Betts Corp. to Texas Utilities,
denotes trade name change
w copies from
catalog
(4 pages)
.m_--
,
5
.
Appendix C
FOIA 86-387
Withhold in Entirety
1.
12/16/85
Facsimile Transmittal w inspector input to
report on protective coatings
(10 pages)
for 50-445/85-18, 50-446/85-15
2.
12/28/85
Inspector input to report, No. 14, ilVAC audit
(9 pages)
3.
12/28/85
Inspector input to report, No. 15, Monthly
Work Summary
(2 pages)
4.
1/13/86
Inspector input to report, No. 16
IE Modules
50100
(1 page)
5.
1/22/86
Inspector input to report, Safety Related
g
Pipe Supports and Restraint Systems
(9 pages)
6.
12/85
Inspector input to report, 8518, observation
of Electrical Installation Activities
(2 pgs)
7.
12/20/85
Inspector input to report, No. 13, IE Infor-
mation Notice and Generic Letter
(2 pages)
8.
l'ndated
I)ra f t inspection rept No.
1, handwritten,
445/8518, 446/8515
9.
l'nd.i t e d
Drait inspection rept
'o.
I.
typed,
.
445/8518,
+4 4/ 8 51 ;
a
3-
.
.
m
.
<
.
,
.
Appendix C
FOIA 86-387
Page 2
Withhold in Entirety
10.
Undated
Draft inspection rept No. 1, Rev 1,
445/8518, 446/8515
11.
Undated
Draft inspection rept No. 1, Rev 2,
445/8518, 446/8515
12.
Undated
Final draft inspection rept.
445/8518, 446/8515
i