- 05000334/LER-1980-097-03, /03L-0:on 801121,containment Airlock Doors Failed Seal Leakage Surveillance Test.Caused by Wood Sliver Adhering to Door Sealing Face & Inner Door O-rings Improperly Mating.Seals Greased.Wood Sliver Removed + (23:06:57, 24 December 2024)
- ML19340D480 + (23:06:59, 24 December 2024)
- ML19340D477 + (23:07:01, 24 December 2024)
- ML19340D473 + (23:07:03, 24 December 2024)
- ML19340D472 + (23:07:04, 24 December 2024)
- 05000333/LER-1980-091-04, /04T-0:on 801211,during Normal Operation,As Result of Environ Radiological Monitoring,Radioactive I-131 Was Detected in Milk.Apparently Caused by Atmospheric Weapons Test Conducted by China on 801016 + (23:07:08, 24 December 2024)
- ML19340D468 + (23:07:09, 24 December 2024)
- ML19340D465 + (23:07:12, 24 December 2024)
- ML19340D464 + (23:07:14, 24 December 2024)
- 05000333/LER-1980-091, Forwards LER 80-091/04T-0 + (23:07:15, 24 December 2024)
- ML19340D461 + (23:07:16, 24 December 2024)
- ML19340D458 + (23:07:19, 24 December 2024)
- ML19340D457 + (23:07:20, 24 December 2024)
- ML19340D454 + (23:07:22, 24 December 2024)
- ML19340D453 + (23:07:23, 24 December 2024)
- 05000029/LER-1980-022-03, /03L-0:on 801127,instrument Air Problems Resulted in Erratic Steam Generator Level Control.Caused by Personnel Error.Personnel Reinstructed + (23:07:24, 24 December 2024)
- 05000029/LER-1980-022, Forwards LER 80-022/03L-0 + (23:07:26, 24 December 2024)
- 05000325/LER-1980-077-03, /03L-0:on 801120,snubber 1-E41-2SS105 Found Not to Be Connected to Pipe Clamp on HPCI Sys Main Pump Discharge Piping.Caused by Personnel Error.Personnel to Be Reinstructed + (23:07:28, 24 December 2024)
- 05000324/LER-1980-091-03, /03L-0:on 801126,hydraulic Snubber 2-SW-142SS169 on Conventional Svc Water Sys Antisiphoning Structure Found W/Loose Pipe Clamp Allowing Snubber to Slide Down Pipe & Become Inoperable.Caused by Vibration Loosening Clamp Bolt + (23:07:29, 24 December 2024)
- ML19340D447 + (23:07:30, 24 December 2024)
- ML19340D446 + (23:07:31, 24 December 2024)
- 05000324/LER-1980-091, Forwards LER 80-091/03L-0 + (23:07:32, 24 December 2024)
- 05000324/LER-1980-104-03, /03L-0:on 801128,containment Atmospheric Monitor 2-CAC-AT-1263 Tripped Due to Low Sample Flow.Caused by Moisture Accumulation in Monitor Sample Inlet,Air Dryer & Photohelic Unit.Moisture Drained & Purged + (23:07:35, 24 December 2024)
- 05000324/LER-1980-104, Forwards LER 80-104/03L-0 + (23:07:39, 24 December 2024)
- 05000344/LER-1980-026-03, /03L-0:on 801126,during Engineering Review of POT-25-2f,closure of Containment Hydrogen Sample Valves MO-5677/5678 Was Not Verified Upon Receiving Containment Isolation Signal.Caused by Drafting Error + (23:07:41, 24 December 2024)
- ML19340D436 + (23:07:42, 24 December 2024)
- 05000325/LER-1980-077, Forwards LER 80-077/03L-0 + (23:07:43, 24 December 2024)
- 05000344/LER-1980-026, Forwards LER 80-026/03L-0 + (23:07:45, 24 December 2024)
- 05000267/LER-1980-073-03, /03L-0:on 801121,effluent Discharge Antifoam Concentration Exceeded Tech Spec Limit for 3-h Period.Caused by High Blowdown Flow Rate.Procedure Will Be Implemented to Prevent Recurrence + (23:07:46, 24 December 2024)
- 05000344/LER-1980-027-03, /03L-0:on 801127,discovered That Generator Lockout Relay Apparently Tripped on East Emergency Diesel Generator. No Cause Determined.Relay Reset & Request for Design Change to Add Relay to Alarm Submitted + (23:07:48, 24 December 2024)
- 05000327/LER-1980-190-03, /03L-0:on 801126,containment Purge Isolation Valves Found Not Leak Rate Tested within 24-h of Stroking. Caused by Delayed Maint Request.Valves Tested within 41-h & Personnel Reinstructed + (23:07:50, 24 December 2024)
- 05000267/LER-1980-073, Forwards LER 80-073/03L-0 + (23:07:52, 24 December 2024)
- 05000344/LER-1980-027, Forwards LER 80-027/03L-0 + (23:07:54, 24 December 2024)
- 05000344/LER-1980-019-03, Reactor Trip Setpoints for High Steam Flow Found Set Incorrectly.Caused by Error in Manual.Setpoints Readjusted.Manual Checked for Similar Errors + (23:07:56, 24 December 2024)
- ML19340D423 + (23:07:57, 24 December 2024)
- ML19340D422 + (23:07:58, 24 December 2024)
- 05000327/LER-1980-190, Forwards LER 80-190/03L-0 + (23:07:59, 24 December 2024)
- 05000344/LER-1980-019, Forwards Updated LER 80-019/03L-1 + (23:08:01, 24 December 2024)
- ML19340D417 + (23:08:03, 24 December 2024)
- 05000327/LER-1980-191-03, /03L-0:on 801124,component Cooling Water Pump C-S Motor Breaker Failed to Close,Rendering B Train Component Cooling Water Inoperable.Caused by Blown Fuse in Control Circuit.Fuse Replaced + (23:08:04, 24 December 2024)
- 05000364/LER-1980-003-01, /01T-0:on 801209,concrete Block Walls Found Not to Meet Seismic Operational Requirements.Caused by Omission of Portions of Vertical Reinforcing &/Or Accompanying Grout Per Original Drawing.Corrections to Be Approved + (23:08:06, 24 December 2024)
- 05000333/LER-1980-070-03, /03X-1:during 800810-15,at Various Times During Plant Shutdown,Number of Intermediate Range Monitor Sys Problems Encountered.Problems Detailed in Encl + (23:08:08, 24 December 2024)
- 05000364/LER-1980-003, Forwards LER 80-003/01T-0 + (23:08:11, 24 December 2024)
- 05000333/LER-1980-070, Forwards LER 80-070/03X-1 + (23:08:12, 24 December 2024)
- 05000327/LER-1980-191, Forwards LER 80-191/03L-0 + (23:08:15, 24 December 2024)
- 05000348/LER-1980-075-03, /03L-0:on 801121,charging Pump Aligned for Operation Found to Be Lacking Emergency Power Source.Caused by Personnel Error in Performing Mod on Svc Water Sys. Potential Consequences to Be Discussed + (23:08:17, 24 December 2024)
- ML19340D406 + (23:08:18, 24 December 2024)
- 05000296/LER-1980-053-03, /03L-0:on 801129,refuel Platform Limit Switch Failed to Prevent Platform Movement Over Core During Functional Test.Caused by Normal Wear.Switch Replaced + (23:08:19, 24 December 2024)
- 05000327/LER-1980-195-01, /01T-0:on 801212,util Notified That Interlocks on Emergency Feeder Breakers to 6.9-kV Shutdown Boards Could Allow Diesel Generators to Connect to Shutdown Boards W/O Operating Load Stripping Relays & Cause Generator Overload + (23:08:21, 24 December 2024)
- ML19340D403 + (23:08:25, 24 December 2024)
- 05000348/LER-1980-075, Forwards LER 80-075/03L-0 + (23:08:26, 24 December 2024)