Submits Supplemental Info Per & Provides Addl Info in Response to Re Plans to Modify Plant to Meet Design & Performance Criteria by End of 1982
ML19340D446
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 12/16/1980
From: Bayne J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: Ippolito T
Office of Nuclear Reactor Regulation
References
JPN-80-57, NUDOCS 8012300584
Download: ML19340D446 (2)


Text

- _ _ _ __

~

POWER AUTHORITY OF THE STATE OF NEW YORK to CoLUMaus CIRCLE Ncw YORK. N. Y.10019 42121 397 6200 GEon,c,e t stany on..ati=e.eric.,

Tmustras

"".7.et?*J "c.

...........i....

oro.oru. manus JOSEPH R.

C IEDER viC. C n a i. es a m

.ewano u.r6y~~

3g.,.,=,, a cai e ao cavr m uoan December 16, 1980

'*" !.7, ',* *c';^ '".....,

,.cocmics, eta =x JPN-80-57

,',",'/."'"*^'

'" ".^t.".'."#..,.......,

..as

.~..s Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Attentf.on:

Mr. Thomas A.

Ippolito, Chief Operating Reactors 3 ranch No. 2 Division of Licensing

Subject:

James A.

FitzPatrick Nuclear Power Plant

~

Docket No. 50-333

^

BWR Scram System

References:

1)

PASNY Letter, J.P.

Bayne to T.A.

Ippolito (JPN-80-48) Dated October 24, 1980.

2)

NRC Letter D.

G. Eisenhut to All BWR Lic ensees, Dated October 1, 1980.

3)

Letter, B. Walters, Chairman of the BWR Owners Group to D. Eisenhut, Dated November 24, 1980.

,f

Dear Sir:

This submittal supplements Reference 1 and provides additional information in response to Reference 2.

We have re-evaluated our present scram system, and plan to modify the FitzPatrick Plant as necessary to meet design and performance criteria developed by the BWR Owners Subgroup.

This design and performance criteria was previously submitted to the NRC via Reference 3.

The tentative modifications presently planned for the Fit: Patrick Plant consist of the following:

dO f

8 01230g ggag

- 1.

Provision of two separate instrument volumes, one for each scram discharge header, in a closer proximity to its respective scram header.

2.

Increasing the interconnecting drain line between each scram discharge header and its respective instrument volume from two inch to eight inch nominal pipe size.

3.

Provision of two automatically operated drain valves in series in the drain line from each instrument volume.

4.

Provision of two automatically operated vent valves in series in each scram discharge header vent line.

5.

Relocation of level instrumentation taps from the connecting piping to the Instrument Volume.

6.

For reliable operation of the scram discharge system instrumentation, redundant switches will be provided for each instrument volume.

The Authority plans to complete the above modifications on or about the end of 1992, contingent upon timely delivery of qualified equipment.

Very truly yours,

/

/

J Bayne Senior Vice President Nuclear Generation RR:ps

/