ML19340D403

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Failure to Inspect Conduit Supports.Insp Documentation Lacking for C 14 Conduit Support.Reinsp Will Be Completed by 810130
ML19340D403
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 12/23/1980
From: Nichols T
SOUTH CAROLINA ELECTRIC & GAS CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8012300534
Download: ML19340D403 (1)


Text

-

SOUTH CAROLINA ELECTRIC a GAS COMPANY nos, orrice son to.

CotuMeiA, South CAROLINA 29218 T. C. NicMots, JR.

we p...

..... o c,sev==

December 23, 1980 NwCLEAe O*te.n.ms Mr. James P. O'Reilly, Director U. S. Nuclear Regulatory Commission Region II, Suite 3100 101 Marietta Street, N. W.

Atlanta, Georgia 30303 Subj ect: Virgil C. Summer Nuclear Station Potential Significant Deficiency, Interim Report - 10CFR50.55(e)

Nuclear Engineering File 3.1051 Docket No. 50/395

Dear Mr. O'Reilly:

On December 2, 1980, Mr. John K. Rausch of NRC Region II was notified of a potential significant deficiency on the subject: Failure to Inspect Conduit Supports. The report was made by Mr. J. A. Wactor.

There was no inspection documentation for a certain type of conduit support designated "C 14".

The bolt holes, bolt torque and thread engagement should have been inspected.

SCE&G has identified and located the C 14 supports, and they are presently being reinspected by the site QC department. We expect to complete the rein-spection by January 30, 1981, and a final report should be issued thereafter.

Very truly.yours, d

T. C. Nichols, Jr.

JAW:TCN:glb cc:

B. A. Bursey A. R. Koon V. C. Summer A. A. Smith G. H. Fischer J. L. Skolds W. A. Williams, Jr.

I&E (Washington)

T. C. Nichols, Jr.

Document Management Branch /

E. H. Crews, Jr.

(55e/21/LER Only)

D. A. Nauman NPCF/Whitaker O. S. Bradham File

0. W. Dixon, Jr.

\\k J. B. Knotts, Jr.

R. B. Clary 9

\\

l ro 1230053'/

S'

-