Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19341C624 + (21:39:43, 24 December 2024)
- ML19341C623 + (21:39:43, 24 December 2024)
- ML19341C621 + (21:39:44, 24 December 2024)
- ML19341C620 + (21:39:45, 24 December 2024)
- ML19341C619 + (21:39:46, 24 December 2024)
- 05000346/LER-1981-009, Forwards LER 81-009/03L-0 + (21:39:47, 24 December 2024)
- ML19341C616 + (21:39:49, 24 December 2024)
- ML19341C615 + (21:39:50, 24 December 2024)
- 05000346/LER-1981-008-03, /03L-0:on 810127,345 Kv Switchyard Bus K Tripped & Locked out,de-energizing Startup Transformer 02.Caused by Action from Directional Ground Current Relay & Charred Phase Lightning Arrestor C on Startup Transformer + (21:39:51, 24 December 2024)
- ML19341C613 + (21:39:52, 24 December 2024)
- ML19341C611 + (21:39:53, 24 December 2024)
- ML19341C610 + (21:39:54, 24 December 2024)
- ML19341C608 + (21:39:54, 24 December 2024)
- 05000346/LER-1981-008, Forwards LER 81-008/03L-0 + (21:39:56, 24 December 2024)
- ML19341C605 + (21:39:57, 24 December 2024)
- ML19341C603 + (21:39:58, 24 December 2024)
- ML19341C604 + (21:39:58, 24 December 2024)
- ML19341C602 + (21:39:59, 24 December 2024)
- 05000312/LER-1981-003-03, /03L-0:on 810203,during Reactor Bldg Spray Sys Loop B Sfas Test,Reactor Bldg Spray Pump B Started Late. Caused by Incorrect Setting on Model 62B Agastat Timer. Timer Reset + (21:40:01, 24 December 2024)
- ML19341C600 + (21:40:02, 24 December 2024)
- 05000312/LER-1981-003, Forwards LER 81-003/03L-0 + (21:40:03, 24 December 2024)
- ML19341C597 + (21:40:04, 24 December 2024)
- ML19341C596 + (21:40:05, 24 December 2024)
- 05000155/LER-1981-003-03, /03L-0:on 810128,backup Nitrogen Bottle Supply for Containment Vacuum Relief Valve Control Sys Depressurized. Caused by Fractured Bottle Isolation Valve Body Probably Due to Overtightening Bonnet Mounting Nut.Valve Replaced + (21:40:06, 24 December 2024)
- ML19341C594 + (21:40:08, 24 December 2024)
- 05000155/LER-1981-003, Forwards LER 81-003/03L-0 + (21:40:09, 24 December 2024)
- 05000255/LER-1981-002-03, Determined That 125 Volt DC Distribution Panel D21A Mounting Did Not Meet Seismic Restraint Criteria.Caused by Engineering Judgment Error. Frame Holding Panel Modified by Adding Braces + (21:40:11, 24 December 2024)
- ML19341C587 + (21:40:12, 24 December 2024)
- ML19341C586 + (21:40:13, 24 December 2024)
- ML19341C585 + (21:40:14, 24 December 2024)
- AECM-80-254, Deficiency Rept Re Failure of Tack Weld on safety-related Automatic Air Damper Supplied by Pacific Air Products Co, Initially Reported on 800912.Util Working W/Constructor Re Reportability Per 10CFR50.55e & 10CFR21 + (21:40:14, 24 December 2024)
- ML19341C581 + (21:40:17, 24 December 2024)
- ML19341C582 + (21:40:17, 24 December 2024)
- ML19341C579 + (21:40:18, 24 December 2024)
- ML19341C580 + (21:40:18, 24 December 2024)
- ML19341C578 + (21:40:19, 24 December 2024)
- ML19341C577 + (21:40:20, 24 December 2024)
- 05000312/LER-1981-004-03, /03L-0:on 810202,component Cooling Water Isolation Valve Failed to Close During Surveillance Procedure 205.07C, Isolation Valve Surveillance test,SFV-46204.Caused by Water in Air Line of Valve Actuator.Water Drained + (21:40:21, 24 December 2024)
- 05000366/LER-1981-011-03, /03L-0:on 810204,nonrated Window Discovered in 3-h Rated Fire Wall.Caused by Design,Mfg & Const/Installation Error.Direct Conversion Reactor Study 81-48 Submitted & Fire Watch Established + (21:40:23, 24 December 2024)
- ML19341C574 + (21:40:24, 24 December 2024)
- ML19341C573 + (21:40:25, 24 December 2024)
- 05000312/LER-1981-004, Forwards LER 81-004/03L-0 + (21:40:26, 24 December 2024)
- ML19341C569 + (21:40:27, 24 December 2024)
- 05000366/LER-1981-011, Forwards LER 81-011/03L-0 + (21:40:28, 24 December 2024)
- ML19341C566 + (21:40:29, 24 December 2024)
- 05000321/LER-1981-009-03, /03L-0:on 810206,nitrogen Storage Tank Inventory Went Below 2000 Gallon Tech Spec Requirement.Caused by Supplier Delaying Shipment.Shipment Received.Supplier Instructed Not to Delay Shipments + (21:40:31, 24 December 2024)
- 05000321/LER-1981-009, Forwards LER 81-009/03L-0 + (21:40:32, 24 December 2024)
- 05000325/LER-1981-015-03, /03L-0:on 810127,rod Block Monitor B Failed to Initiate RTGB Downscale Alarm & Rod Out Block at Downscale Alarm Setpoint.Caused by Mechanically Stuck Contacts in Control Relay K-2 in Cabinet Circuitry.Relay Replaced + (21:40:34, 24 December 2024)
- TAC:10729 + (21:40:35, 24 December 2024)
- ML19341C561 + (21:40:35, 24 December 2024)
- ML19341C560 + (21:40:36, 24 December 2024)