Text
-
4
~
G BIG ROCK POINT PLANT ANNUAL OPERATING REPORT - OCCUPATIONAL EXPOSURE 8103030Ni
Occupational Personnel Radiation Exposure The following is a list of personnel radiation exposure by job breakdown for 1980.
The radiation exposure accumulated daring the entire report period appears at the end of this s ection and meets the Technical Specifica+, ion reporting requirement of 6.9.1.b.
These exposures were tabulated frc= pocket dosimete / records, radiation protection logbooks, weekly radiation exposure record worksheets and high raciation area worksheets.
The total radiation dose received at the Big Rock Point Plant for the year 1930 was 338,333 =re according to ther=olu=inescent desineters and 367,95h =re according to pocket dosimeters. Therefore, the pocket dosimeters read approximately 95 higher than thermolu=inescent dosimeters.
Total pocket dosimeter accu =udation for the refueling shutdown (Nov.1 to Lee 31) a=ounted to 231,6h3 =re=.
19 80 S u==arr - Pocket Desi=eters
Re
Non-Censu=ers Fever 9 h,708
- lant Staff Personnel Operations 40,182
'taintenance 52,L17 Health hysics/ Chemistry 33,260 Instrument & Control 7,L5h Super 71sion 15,151 Ingineering 1L,565 Quality Control / Quality Assurance 1,632 16L,661 CPCo Non-Flant Personnel Quality Assurance 1,118 Engineering 5,599 UDT h,368 Maintenance 97,3L3 Health Physics 157 108,585 Sub Total Non-CPCo 9L,708 Plant Staff 16h,661 CPCo Non-Plant Staff 108,585 TOTAL 367,95h
STM/.ARY 2.
l l
Big Rock Point Plant - 1980 l
Consumers Power Totals mrem i
Operations h0,182 l
Supervision 15,151 Engineering lh,565 Maintenance 52,h17 Health Physics 33,260 Instrument & Control 7,h5h Quality Control / Quality Assurance 1,632
?lon-Plant Maintenance 97,3h3 Ilon-Plant Health Physics 157 Ilon-Plant Engineering 5,599 Ilon-Plant Quality Control / Quality Assurance 1,118
!iDT L,368 Total CPCo -
273,2L6 IIon-CPCo Totals Rem (*)
Paquette Leasing 305 General Physics Corporation 20 Catalytic 2,h61 Manpower L3 Millborne Electronic Systems 325 Associated Mechanical Services k,208 Federal Industrial Services 1,0 3L Powell Valve Company 2,3L2 General Electric 73
^.fers Company 10 Pennington Brothers 3,261 Cello Spray Company 10 Fisk Enterprises 27 Science Applications Inc.
h39
- lewkirk Electric 29,7h3 Iluelear Regulatory Cc==ission LOl Iluelear Services LO5 Owens Corning 17,h05 Rockvell International 1,852
(*' ) Pocket I
dosimeter accumulation
(1)
Iion-CPCo Totals (Centinued) mrem Hartford Steam Boiler 318 Blume Associates 20 Michigan Department of Public Health 20 Southwest Resear;h Institute 11,615 Limitourque Corporation 3h5 Townsend and Sottum 1,171 Target Rock 5
Bechtel Corporation 757 Exxon 1,h52 Energy Incorporated 260 Trans-Eastern Inspection 2,727 Rad Services 11,502 Babcock and 'a'ilcox 152 Total IIon-CPCc 9h,708
UUMBER OF PERSONNEL AND I-LU!-PEN BY WORK AND JOB FUNCTION AT THE BIG ROCK PolET UUCLEAR GENERATI!;G PLANT 1980 Number o f Perconnel (100 nPem)
Total mrem Station Utility Contract Station
' Utility Contract Work and Job Function Employee Employ ee Workers &
Employee Employee Workers &
Others Others HEACTOR OPERATIONS & SURVEILLANCE 2,468 3,025 Maintenance Personnel 15 17 29,659 Operating Personnel 29 Health Paysics Personnel 9
h
'(
12,648 127 2,807 9,765 Supervisory Personnel 2h Engineering Personnel 23 49 11,653 1,577 Instrument & Control Personnel 8
4,098 Quality Assurance & Quality Control 3
6 2
1,33T 1,118 213 732 892 UDT Personnel 12 17 All Other Personnel 143 12,460 ROUTINE MAIIITENANCE Maintenance Personnel 20 91 28 30,159 22,379 h,9 37 Operating Personnel 2
70 6
6,587 30 1,227 Health Physics Personnel 9
2 Supervisory Personnel h
1,110 Engineerinc Personnel 5
3 303 3,69 0 I:tstrument & Control Personnel 8
2,271 408 2
Quality Assurance & Quality Control
- DT Personnel p
All Other Personnel 55 3,70h
NUMBER OF PERSONNEL AliD IMN-REM BY UORK AND JOB FUNCTION AT THE BIG ROCK POIHT NUCLEAR GEHER/tTING PLANT I
1980 Number of Personnel (100 m9em)
Total trJtem Station Utility Contract Station Utility Contract.
Work and Job Function Employee Employee Workers &
Employee Employee Workers &
a Others Others j
IllSERVICE INSPECTION i
805 31,330 Maintenance Personnel 7
29 102 Operating Personnel 1
5,564 7
3,304 Health Physics Personnel 7
206 Supervisory Personnel 6
Engineering Personnel 7
6 1,057 1,961 339 Instrument & Control Personnel 1
1 512 Quality Assurance & Quality Control 3,636 12,956
{
NDT Personnel 7
17 All Other Personnel 7
13,359 1
SPECIAL MAINTENANCE Maintenance Personnel lh 42 37 7,hh8 39,852 30,560 r
Operating Personnel 1
29 8 4
Health Physica Personnel 9
1 6
7,h11 1,89 9 1
Supervisory Personnel 6
2,187 Engineering Personnel 6
5 1,525 371 Th5 Instrument & Control Personnel 5
~
Quality Assurance & Quality Control 1
75
=
h9h
- DT Personnel 1
.vi All Other Personnel 1,5h8 7
I
NUMBER OF PERSCIINEL AliD !!AN-RRi BY WORK A?ID JOB FUNCTION AT THE BIG ROCK POIHT NUCLEAR GENERATI!iG PLA!!T 1960
!! umber of Personnel (100 rHe.)
Total mrem Station Utility Contra t Station Utility Contract Work and Job Function Employee Employee Wo:kers &
Employee Employee Workers &
Others Others WASTE PROCESSING Maintenance Personnel 12 8
1 8,819 721 300 2,8hD Operating Personnel
.i )
Health Physics Personnel 8
1 2,'(17 5
Supervisory Personnel 4
381 Engineering Personnel 15 Instrument & Control Perso.'nel 1
220 38 Quality Assurance & Quality Control 1
NDT Personnel All Other Personnel REFUELING Maintenance Personnel 6
2 2,718 36 Operating Personnel 23 7,2h8 Health Physics Personnel 5
593 Supervisob Personnel 9
1,502 Encineering Personnel 2
12 Ins t rument, & Control Personnel Quality Assurar ce & Quality Control lid'; Personnel cn S
469 All Other Personnel
t a
HUMBER OF PERSONNEL AND ITAU-REM BY WORK A!!D JOB FUNCTION AT THE BIG ROCK POINT IPJCLEAR GENERATIliG PLAUT 1983 Utuaher of Personnel (10G mrem)
Total mrem Station Utility Contract Station Utility Contract Work and Job Function Employee Dnployee Workers &
Employee Employee Workers &
01.h ers Others TOTAL EXPOSURE Maintenance Personnel 20 91 47 52,417 97.343 35,797 10,182 Operating Personnel 29 4
Health Physics Personnel / Chemistry 9
h 7
33,260 157 11,503 Supervisory Personnel 214 15,151 i
11,565 5,599 Engineering Personnel 23 50 4
7,15h Instrument & Control Personnel 8
6 Quality Assurance & Quality Control 3
6 2
1,6 32 1,118 1,665
!*,368 14,312 12 17 4
HDT Perronnel 31,540 All Other Personnel 1 714 b
I l
"Special maintenance" consisted of, but is not necessarily limited to, the following work; j
Enclosure spray modifications Valve repair 3
Recirculating pump trip modification i
Pipe tunnel steam leaks
+
Repair valve operat. ions Yarway modification Fire main modification for RCP steam drum enclosure Radwaste tank repairs 8
,s.
IlllLIBER OF PEIC0titlEL AtlD I4Ari-ilEM BY WORK AND J0ll FUtiCTION AT Tl"3 BIG HOCK POIrlT tlUCLEAlt GErlEHATIllG PLANT Berueling Outage flovember 1, 1980-December 31, 1980 r
0 o
e US F
.8 M
N w
u?Y vb ON q$
t S
9 +4 %
S*
te et t
g
~
e if t 11 S
- 8-ES
+' 8 4
vnd oe ac ae En e
o mom mx HH ux
- m m m
a Consumers Power Company Employees flaintenance Personnel 4,862 17,915 32,105 34,157 1,168 2,754 92,961 985 14,719 15,236 Operating ~ Personnel 9,532 Ilealth Physics Personnel 3,641 926 3,17h 2,026 3h6 378 10,h91 Supervisory Personnel 2,445 697 1 39 973 17 1,h76 5,747 32 10,160 1,103 1,760 2,923 1,362 Engineering Personnel 4
3,662 1,1 36 1,hh2 339 14h5 Instrument & Control Personnel 4
1 2143 Quality Assurance & Quality Control 2h3 4,226 NDT Personnel 679 202 3,3h5 I
Hon-CPCo Contract Workers & Others 11,066 6,591 36,381 31,886 68 2,925 88,917 TOTAL 38,007 29,533 78,406 70,8h9 2,584 12,26h 231,643 i