Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19343A253 + (21:14:02, 24 December 2024)
- ML19343A249 + (21:14:03, 24 December 2024)
- ML19343A248 + (21:14:04, 24 December 2024)
- ML19343A247 + (21:14:05, 24 December 2024)
- ML19343A246 + (21:14:06, 24 December 2024)
- ML19343A243 + (21:14:07, 24 December 2024)
- ML19343A241 + (21:14:08, 24 December 2024)
- ML19343A242 + (21:14:08, 24 December 2024)
- ML19343A238 + (21:14:09, 24 December 2024)
- ML19343A235 + (21:14:10, 24 December 2024)
- ML19343A233 + (21:14:11, 24 December 2024)
- 05000219/LER-1980-035-03, /03L-0:on 800814,during Containment Spray Sys Automatic Actuation Test,High Drywell Pressure Switches IP-15A & IP-15D Tripped at Higher than Specified Setpoint of 2 Psig.Caused by Instrument Repeatability + (21:14:18, 24 December 2024)
- 05000219/LER-1980-035, Forwards LER 80-035/03L-0 + (21:14:19, 24 December 2024)
- 05000336/LER-1980-030-03, /03L-0:on 800812,during Routine Operation, Containment Air Temp Exceeded 120 F.Caused by Svc Water Temp Control Valve to Reactor Bldg Closed Cooling Water Heat Exchangers Being Set Too High.Valve Readjusted + (21:14:21, 24 December 2024)
- NG-19-0137, Supplement to Response to Request for Additional Information Relating to Proposed Changes to the Emergency Plan for Permanently Defueled Condition + (21:14:22, 24 December 2024)
- 05000336/LER-1980-029-03, /03L-0:on 800812,during Surveillance Test on 12 U diesel,125 Vdc Ground Alarm Received.Caused by Frayed Insulation on Wire in Bendix Connector Allowing Contact Between Bare Wire & Connector Shell.Wire Recovered + (21:14:24, 24 December 2024)
- 05000336/LER-1980-028-03, /03L-0:on 800811,at 100% Power,Control Element Assembly 41 Dropped from 180 to Zero Steps.Caused by Faulty Jumper Cable from Refuel Disconnect Panel to Reactor Head. Power Reduced & Assembly Realigned.Replacement Planned + (21:14:25, 24 December 2024)
- ML19343A222 + (21:14:26, 24 December 2024)
- ML19343A218 + (21:14:29, 24 December 2024)
- 05000293/LER-1980-051-03, /03L-0:on 800813,while Performing Surveillance Test,Reactor Water Level Instrument L1S 263-72B,switches 3 & 4,exceeded Setpoint Limit.Caused by Setpoint Drift. Instrument Recalibr & Returned to Svc + (21:14:30, 24 December 2024)
- 05000293/LER-1980-049, Forwards LER 80-049/03L-0 + (21:14:32, 24 December 2024)
- 05000333/LER-1980-072-03, /03L-0:on 800812,during Plant Startup & Operation, Low Pressure Coolant Injection Inverter Tripped.Caused by Electronic Control Failure.Following Repair,Inverter Became Operable + (21:14:34, 24 December 2024)
- 05000293/LER-1980-051, Forwards LER 80-051/03L-0 + (21:14:35, 24 December 2024)
- 05000333/LER-1980-072, Forwards LER 80-072/03L-0 + (21:14:37, 24 December 2024)
- ML19343A208 + (21:14:38, 24 December 2024)
- ML19343A207 + (21:14:39, 24 December 2024)
- ML19343A206 + (21:14:40, 24 December 2024)
- ML19343A205 + (21:14:40, 24 December 2024)
- 05000293/LER-1980-052-03, /03L-0:on 800812,while Calibr Reactor Coolant Leak Detection Air Sampling Sys,Particulate Chamber Cover Retaining Nuts Were Stripped.Maint Personnel Replaced Nuts + (21:14:42, 24 December 2024)
- ML19343A203 + (21:14:43, 24 December 2024)
- 05000293/LER-1980-052, Forwards LER 80-052/03L-0 + (21:14:44, 24 December 2024)
- 05000293/LER-1980-053-03, /03L-0:on 800814,HPCI Snubber 23-3-36 Was Found to Be Inoperable.Caused by Low Reservoir Fluid.Analysis by Engineering Dept Underway + (21:14:46, 24 December 2024)
- 05000293/LER-1980-053, Forwards LER 80-053/03L-0 + (21:14:48, 24 December 2024)
- ML19343A197 + (21:14:50, 24 December 2024)
- ML19343A196 + (21:14:50, 24 December 2024)
- ML19343A193 + (21:14:52, 24 December 2024)
- ML19343A194 + (21:14:52, 24 December 2024)
- ML19343A191 + (21:14:53, 24 December 2024)
- ML19343A192 + (21:14:53, 24 December 2024)
- ML19343A190 + (21:14:54, 24 December 2024)
- ML19343A189 + (21:14:54, 24 December 2024)
- TXX-3190, Responds to 800814 Request for Addl Info.Answers to Questions from Instrumentation & Controls Sys Branch & Anl Consultants Will Be Submitted by Amend to FSAR on 801031 + (21:14:55, 24 December 2024)
- ML19343A187 + (21:15:00, 24 December 2024)
- ML19343A185 + (21:15:02, 24 December 2024)
- ML19343A184 + (21:15:02, 24 December 2024)
- ML19343A183 + (21:15:06, 24 December 2024)
- ML19343A182 + (21:15:07, 24 December 2024)
- ML19343A181 + (21:15:08, 24 December 2024)
- ML19343A179 + (21:15:09, 24 December 2024)
- ML19343A178 + (21:15:09, 24 December 2024)
- ML19343A177 + (21:15:10, 24 December 2024)