Text
.
ft NUCLEAR FACILITIES DIVISION R GE UNIVERSITY OF FLORIDA OF DEPARTMENT OF NUCLEAR ENGINEERING SCIENCES 102 NUCLEAR REACTOR BUILDING ENGINEERING GAINESVILLE FLORIDA 32611 AREA CooE 904 PHONE 3921423 September 10, 1980 fir. James R. Miller Standardization and Special Projects Branch Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.
20555 RE: License Renewal - Facility R-56, Docket 50-83
Dear Mr. Miller:
In response to your letter of August 7,1980, the followino statements are respectfully submitted with regard to the additional licensing docu-mentation requested by your office:
1.
A new SAR for the University of Florida Trainina Reactor, follow-ing the format of Reg. Guide 1.70, is in final stages of assembly.
The status of this document is summarized under Attachment 1 to this document.
2.
The following schedule for submittal to the NRC is as follows:
a.
SAR to the UFTR Safety Review Committee by October 6,1980 b.
Final review and comments by Safety Review Comnittee by Oct.
22, 1980 c.
Mailing of SAR package to the NRC by Oct. 31, 1980.
We regret the delay of several months in completing the submittal. Ne are, however, essentially finished and expect no difficulty in comolying with the above schedule. Please let me know if you reoutre further information.
Sincerely, f Y\\{.kl D
'Ni1YJ.i Diaz
[
QN
,A, Profess' r and Director of o
y
..& 'i /
/
Nuclear Facilities
' e-Dean Mayne Chen, College of Engineerina
//
Approvedl
- D-
,c -
/m /M Dr. Alan Jacobs, Chairnan, Dept. of Nuclear Enoineerino r
NILS J. DIAZ DIRECTOR (904) 392-1406 8 0 09160N
'"*"" * "" " ' " ""^* ' ~ "' ""
s STATUS OF UFTR SAFETY ANALY3IS REPORT OIAPTER/ TITLE PAGES STATUS OF TEXT STATUS OF FIGURES EXPECTED COMPLFTION 1.
Introduction and General Description of the Plant 22 Final Typed Finished (9)
COMPLETED 2.
Site Characteristics 87 Final Typed Finished (27),Being Drafted (8) 9/14/80 3.
Design of Structures, Components, Equipnen: and Systems 10 Final Typed Finished (3)
COMPLETED 4.
Reactor 14 0 Draf t Completed Finished (13),Being Draf ted(9) 5.
Reactor Coolant System and Connected Systems 10 Final Typed Finished (5)
COMPLETED 6.
Engineered Safety Features 1
Final Typed Hone COMPLETED 7.
Instrumentation and Controls 16 Final Typed Finished (5)
COMPLETED 8.
Electric Power 1
Final Typed None COMPLETED 9.
Auxiliary Systems 16 Final Typed Finished (5)
COMPLETED 10.
Steam and Power Conversion System 1
Final Typed None COMPLETED
- 11. Radioactive Waste Ibnagement m6 Dra f t Nearly s
9/12/80 Completed
- 12. Radiation Protection s25 Draf t in Progress s
9/14/80
- 13. Conduct of Operatons Draft in Progress s
9/29/80 14.
Initial Test Program 1
Final Typed None COMPLETED
- 15. Accident Analyses m30-35 Draft in Progress s10 9/22/80 16.
Technical Specifications Draft Congleted None 9/29/80 3 2:_,gua] j ty_33pura ngg_ __ __ __ __ __ __ ___ _ __ ____ __ __,<3 _ ___ Dra f t_ Cggg}gtgd__, _ __ _yggg_ ___ _ __ _ __ _ __ __ _ _ __ __ _ _ __9/!}f 89,_ __ _
2 UF Financial Qualifications COMPLETED Physical Protection Plan COMPLETED Emergency Plan (under revision)
COMPLETED 9/10/80