Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19343D197 + (17:01:51, 24 December 2024)
- ML19343D195 + (17:01:52, 24 December 2024)
- ML19343D194 + (17:01:53, 24 December 2024)
- IR 05000312/1981007 + (17:01:56, 24 December 2024)
- ML19343D191 + (17:01:58, 24 December 2024)
- ML19343D190 + (17:01:59, 24 December 2024)
- ML19343D188 + (17:02:00, 24 December 2024)
- ML19343D187 + (17:02:01, 24 December 2024)
- ML19343D186 + (17:02:02, 24 December 2024)
- ML19343D185 + (17:02:04, 24 December 2024)
- ML19343D183 + (17:02:10, 24 December 2024)
- ML19343D182 + (17:02:11, 24 December 2024)
- ML19343D181 + (17:02:12, 24 December 2024)
- 05000366/LER-1981-019, Forwards LER 81-019/03L-0 + (17:02:14, 24 December 2024)
- 05000295/LER-1981-007-03, /03L-0:on 800724,50.59 Evaluation Was Not Performed Prior to tie-in Into safety-related Pipe.Caused by Personnel Error.Personnel Reinstructed + (17:02:15, 24 December 2024)
- 05000295/LER-1981-007, Forwards LER 81-007/03L-0 + (17:02:18, 24 December 2024)
- ML19343D175 + (17:02:19, 24 December 2024)
- ML19343D173 + (17:02:20, 24 December 2024)
- ML19343D172 + (17:02:21, 24 December 2024)
- ML19343D171 + (17:02:22, 24 December 2024)
- ML19343D170 + (17:02:23, 24 December 2024)
- ML19343D168 + (17:02:24, 24 December 2024)
- ML19343D167 + (17:02:26, 24 December 2024)
- ML19343D166 + (17:02:26, 24 December 2024)
- 05000348/LER-1981-005-01, /01T-0:on 810324,determined That Time Stipulated in FSAR Section 9.2.1.3 for Operator Action in Accident Involving Svc Water Pond Dam Break & Limiting Active Failure Is Not Accurate.Caused by Design Error + (17:02:28, 24 December 2024)
- 05000348/LER-1981-005, Forwards LER 81-005/01T-0 + (17:02:30, 24 December 2024)
- 05000364/LER-1981-001-03, /03L-0:on 810310,personnel Air Lock Declared Inoperable Prior to Completion of Initial Fuel Loading. Caused by Vent Valve Const Error.Operating Linkage Was 90 Degrees from Indicated Position.Linkage Reinstalled + (17:02:32, 24 December 2024)
- 05000364/LER-1981-001, Forwards LER 81-001/03L-0 + (17:02:35, 24 December 2024)
- ML19343D159 + (17:02:37, 24 December 2024)
- 05000346/LER-1981-016-03, /03L-0:on 810308,dose Equivalent I-131 Level Exceeded Tech Spec Limit.Caused by Gas Leakage Through Fuel Cladding.Levels Monitored + (17:02:38, 24 December 2024)
- 05000346/LER-1981-016, Forwards LER 81-016/03L-0 + (17:02:40, 24 December 2024)
- ML19343D155 + (17:02:42, 24 December 2024)
- ML19343D154 + (17:02:43, 24 December 2024)
- ML19343D153 + (17:02:44, 24 December 2024)
- ML19343D152 + (17:02:45, 24 December 2024)
- ML19343D151 + (17:02:46, 24 December 2024)
- ML19343D150 + (17:02:48, 24 December 2024)
- ML19343D149 + (17:02:48, 24 December 2024)
- ML19343D148 + (17:02:49, 24 December 2024)
- ML19343D147 + (17:02:50, 24 December 2024)
- ML19343D146 + (17:02:50, 24 December 2024)
- ML19343D144 + (17:02:51, 24 December 2024)
- ML19343D143 + (17:02:52, 24 December 2024)
- ML19343D142 + (17:02:53, 24 December 2024)
- ML19343D141 + (17:02:54, 24 December 2024)
- ML19343D140 + (17:02:55, 24 December 2024)
- ML19343D139 + (17:02:56, 24 December 2024)
- ML19343D138 + (17:02:57, 24 December 2024)
- ML19343D136 + (17:02:59, 24 December 2024)
- ML19343D137 + (17:02:59, 24 December 2024)
- ML19343D135 + (17:03:00, 24 December 2024)