ML19343D136

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Removal of Pipe Supports After Insp,Initially Reported on 810220.Mgt Personnel of Site Contractors Notified.Extent of Problem Outside Area to Be Determined.Next Rept to Be Submitted by 810727
ML19343D136
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 03/20/1981
From: Wells D
DETROIT EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, EF2-49-948, NUDOCS 8104090576
Download: ML19343D136 (2)


Text

7_

,. .D s

Defroit =~ ~ .,.

~

.. a w :.w i.. .o. a., m . . macan-: ;

tiarch 20,'1981 o EF2-49,94S f)O K_%

X .@ %4

- p$ N s fv

'N 2

\(' ([]3j

- i Mr. James G. Keppler, Director Regicn III ,f- g' 4 ph U.S. Nuclear Regulatory Cctrdssion \cA 'y g 799 Roosevelt Read Nl / #}

G1,n E11ps, Illinois 60137 4 ' }l \

Subject:

Interim Report of 10CFR50.55(e) Item on Renoval of pipe Supports After Inspection (#33)

Dear Mr. Keppler:

J On Febmary 20, 1981, Detroit Edison's Mr. H.A. Walker, Superviscr-Constructica Cuality Assurance, telephoned Mr. J.E. Mcnklin of the NRC-Region III to report on a p =blen with rezcval of pipe Supports after inspection at the Fe mi 2 Site.

Quality Centrol personnel for cne of the site centractors had noted a crew frca another site cen*ractor werking on a pipe suppcrt for which the first contractor had responsibility. The first contractor had already inspected and accepted the pipe suppcrt. No proper work doctrent (traveler, etc.) had been issued for the work, and therefore there is no rethod to ensure that the support would be re-inspected. A cursory review of apprcxi-rately 75 inspected a-d accepted pipe supports en syste s scheduled for turncver in the near future revealed that tanive pipe supports kure not

, installed por the pipe support sketch and apparently had been recoved and re-installed. This re.cval is r :parently being done to provide better access to wrk heing perfered t / the seccnd contractor. These pipa supports were CA .avel I pipe supports 1ccated in the Reactor Building.

We are presently trying to dete =dne if this prcblem exists outside of the area in which it was noted, and also ir it applies to scrk of other site-contractors. In addition to this, ranagcrEnt persenel cf site contractors 4

have been nctified of the problem and wa=ed that unau*horized work en any plant eculptrent will result in apprcpriate disciplinary acticn. Also, he are presently awaiting documentation f m Centractors and Constructicn ranegenant concerning the evaluation of hangers that have been re-inspected and cut-out.

3o/7 3

/0 f

L

--,-.w<- y e * * * - - - - - * -'7 e--it'~"-'e *9 T"

~- 0 Mr. James G. Keppler, Director - March 20, 1981-~

Page Two EF2-49,948 Another report en this item, either interim or final, is scheduled to be sent to you en or before' July 27, 1981. If you have questions concerning-this tratter, please contact Mr. H.A. Walker, Supervisor-Construction Quality Assurance.

- Very truly yours, S

, /1 su

- Donald A. Wells, Manager Quality Assurance DAW / HAW /cp cc: ' Mr. Victor Stello, Jr., Director Office of Inspectica and Enforcc ent Division of Reactor Inspection Progra~s U.S. Nuclear Regulatory Carlssion Washington, DC 20555 Mr. Bruce Little, Resident Inspectcr U.S. Nuclear Regulatory Cccrlssion Resident Inspectors Office 6450 North Db:ie Higblay