Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19345C036 + (15:09:31, 24 December 2024)
- ML19345C037 + (15:09:31, 24 December 2024)
- ML19345C035 + (15:09:32, 24 December 2024)
- ML19345C034 + (15:09:33, 24 December 2024)
- ML19345C033 + (15:09:34, 24 December 2024)
- ML19345C032 + (15:09:35, 24 December 2024)
- ML19345C030 + (15:09:39, 24 December 2024)
- ML19345C029 + (15:09:40, 24 December 2024)
- ML19345C028 + (15:09:41, 24 December 2024)
- ML19345C027 + (15:09:42, 24 December 2024)
- ML19345C026 + (15:09:43, 24 December 2024)
- ML19345C025 + (15:09:44, 24 December 2024)
- ML19345C024 + (15:09:45, 24 December 2024)
- ML19345C021 + (15:09:46, 24 December 2024)
- ML19345C020 + (15:09:47, 24 December 2024)
- ML19345C018 + (15:09:49, 24 December 2024)
- 05000318/LER-1980-051-03, /03L-0:on 801101,CTMT 21 Air Cooler Tripped Off. Caused by Terminal Shorting Block in Air Cooling Fan Controller Flashing Over,Causing Trip.No Cause of Flashover Determined.No Prevention Action Necessary + (15:09:50, 24 December 2024)
- 05000318/LER-1980-051, Forwards LER 80-051/03L-0 + (15:09:52, 24 December 2024)
- BSEP-80-1930, Notifies That on 801025,to Install Mod,Fire Barrier Penetration Limiting Condition for Operation Was Generated on Portion of Diesel Generator Intake Ventilation Sys.Work Completed Beyond Designated Time Frame + (15:09:53, 24 December 2024)
- ML19345C014 + (15:09:53, 24 December 2024)
- ML19345C012 + (15:09:55, 24 December 2024)
- ML19345C011 + (15:09:56, 24 December 2024)
- 05000298/LER-1980-038-03, /03L-0:on 801011,switch on NBI-LIS-101A Found Set at Lower Level than Tech Spec Limit.Caused by Excessive Drift.Switch Returned to Normal Setting & Will Be Replaced + (15:09:57, 24 December 2024)
- ML19345C009 + (15:09:58, 24 December 2024)
- ML19345C008 + (15:09:59, 24 December 2024)
- 05000298/LER-1980-038, Forwards LER 80-038/03L-0 + (15:10:00, 24 December 2024)
- ML19345C005 + (15:10:01, 24 December 2024)
- ML19345C003 + (15:10:02, 24 December 2024)
- ML19345C002 + (15:10:03, 24 December 2024)
- ML19345C001 + (15:10:04, 24 December 2024)
- ML19345C000 + (15:10:04, 24 December 2024)
- ML19345B997 + (15:10:05, 24 December 2024)
- ML19345B999 + (15:10:05, 24 December 2024)
- ML19345B994 + (15:10:06, 24 December 2024)
- ML19345B993 + (15:10:06, 24 December 2024)
- ML19345B992 + (15:10:07, 24 December 2024)
- 05000327/LER-1980-180-01, /01T-0:on 801114,determined That Both Containment Spray Pumps Could Be Jeopardized by Blockwall Failure During Seismic Event.Caused by Nonreinforced Concrete Block Walls Not Being Designed for Seismic Events + (15:10:09, 24 December 2024)
- 05000327/LER-1980-180, Forwards LER 80-180/01T-0 + (15:10:10, 24 December 2024)
- ML19345B987 + (15:10:11, 24 December 2024)
- ML19345B985 + (15:10:13, 24 December 2024)
- 05000368/LER-1980-082-03, /03L-0:on 801030,during Mode 1 Operation Plant Computer Failed.Caused by Grounding Problems Due to Voltage Spikes.Welding Grounds Relocated & Computer Returned to Svc + (15:10:20, 24 December 2024)
- ML19345B979 + (15:10:21, 24 December 2024)
- ML19345B978 + (15:10:22, 24 December 2024)
- ML19345B976 + (15:10:22, 24 December 2024)
- ML19345B975 + (15:10:23, 24 December 2024)
- ML19345B974 + (15:10:23, 24 December 2024)
- ML19345B973 + (15:10:24, 24 December 2024)
- ML19345B972 + (15:10:25, 24 December 2024)
- ML19345B971 + (15:10:26, 24 December 2024)
- ML19345B970 + (15:10:27, 24 December 2024)
- ML19345B969 + (15:10:28, 24 December 2024)