Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20209E549 + (20:55:05, 23 May 2025)
- TAC:52666 + (20:55:20, 23 May 2025)
- ML20209E305 + (20:56:13, 23 May 2025)
- ML20209E178 + (20:56:46, 23 May 2025)
- ML20209E044 + (20:57:16, 23 May 2025)
- ML20209E025 + (20:57:21, 23 May 2025)
- TAC:56737 + (20:57:54, 23 May 2025)
- ML20209D769 + (20:58:52, 23 May 2025)
- TAC:51635 + (20:59:12, 23 May 2025)
- ML20209D614 + (20:59:25, 23 May 2025)
- ML20209D483 + (20:59:55, 23 May 2025)
- ML20209D445 + (21:00:02, 23 May 2025)
- ML20209D355 + (21:00:22, 23 May 2025)
- ML20209D343 + (21:00:27, 23 May 2025)
- NUREG-0954, Advises That 860619 Submittal Summarizing Results of Survey Quantifying Insulation in Containment by Type & Location Complies W/Guidance in Generic Ltr 85-22 & Sser 2 (NUREG-0954) + (21:01:14, 23 May 2025)
- ML20209D141 + (21:01:19, 23 May 2025)
- ML20209C918 + (21:02:09, 23 May 2025)
- TAC:51994 + (21:02:23, 23 May 2025)
- NUREG-1033, Forwards Public Comments Re Facility Des.Reviewers Received Copies on 840326 & 28.Reviewers Should Have Sufficient Time to Review & Comment & Provide Fes Input by 840423 + (21:02:34, 23 May 2025)
- 05000289/LER-1999-008, :on 990604,discovered That Air Flow Through Each of RB Fan Cooler Units Was Below Design Basis Requirement.Caused by Accumulation of Boric Acid from Rc Leakage.Normal Cooling Coils Have Been Cleaned + (21:03:22, 23 May 2025)
- ML20209C537 + (21:03:45, 23 May 2025)
- RBG-45035, Requests That Encl RBS Fuel Recovery Info Be Withheld from Public Disclosure,Per Provisions of 10CFR2.790(a)(4).Info Is Being Presented at Meeting to Discuss Recent Anomalous Conditions Found.Proprietary Info Withheld + (21:03:50, 23 May 2025)
- ML20209C480 + (21:04:01, 23 May 2025)
- ML20209C454 + (21:04:08, 23 May 2025)
- IR 05000373/1986021 + (21:04:26, 23 May 2025)
- ML20209C293 + (21:04:42, 23 May 2025)
- IR 05000344/1986032 + (21:04:59, 23 May 2025)
- ML20209C207 + (21:05:05, 23 May 2025)
- L-99-103, Supplemental Application for Amend to License NPF-73, Including Typed,Final TS Pages for LAR 115.Summary Description of Editorial Changes Incorporated in Addition to Those Addressed in Previously Provided marked-up Pages + (21:05:10, 23 May 2025)
- TAC:48907 + (21:05:34, 23 May 2025)
- 05000302/LER-1986-001-01, Advises That Suppl to LER 86-001-01 Re Reactor Coolant Pump Shaft Failure on 860101 Delayed Until 870331 Due to Extended Plant Outages During Last 3 Months + (21:05:58, 23 May 2025)
- ML20209B967 + (21:06:02, 23 May 2025)
- TAC:45148 + (21:06:06, 23 May 2025)
- ML20209B945 + (21:06:09, 23 May 2025)
- ML20209B934 + (21:06:13, 23 May 2025)
- ML20209B929 + (21:06:17, 23 May 2025)
- ML20209B925 + (21:06:18, 23 May 2025)
- ML20209B918 + (21:06:21, 23 May 2025)
- 05000293/LER-1999-004, :on 990529,setpoint of Target Rock Relief Valves Were Found Out of Tolerance During Testing.Caused by Setpoint Drift.Replaced Pilot Assemblies with Certified Spare Pilot Assemblies.With + (21:06:25, 23 May 2025)
- ML20209B903 + (21:06:31, 23 May 2025)
- 05000298/LER-1999-005, :on 990601,condition Prohibited by TSs Was Noted.Caused by Failure to Adequately Perform Logic Sys Functional Testing.Entered TS SR 3.0.3 & Temporarily Revised Affected Surveillance Procedures + (21:06:33, 23 May 2025)
- ML20209B898 + (21:06:35, 23 May 2025)
- ML20209B894 + (21:06:38, 23 May 2025)
- ML20209B893 + (21:06:39, 23 May 2025)
- ML20209B885 + (21:06:42, 23 May 2025)
- ML20209B872 + (21:06:45, 23 May 2025)
- ML20209B864 + (21:06:48, 23 May 2025)
- ML20209B860 + (21:06:50, 23 May 2025)
- ML20209B856 + (21:06:53, 23 May 2025)
- ML20209B850 + (21:06:56, 23 May 2025)
- ML20209B847 + (21:07:02, 23 May 2025)