TAC:51994
From kanterella
Jump to navigation
Jump to search
Request for: Approved, Closed | |
Questions Answers | |
| From | |
MONTHYEARML17266A2251980-06-25025 June 1980
[table view]Summary of 800620 Meeting W/Util & C-E in Bethesda,Md Re 800611 Reactor Trip & Cooldown on Natural Circulation ML17083A4631980-08-0101 August 1980 Suppl 10 to SER ML17208A9071980-08-12012 August 1980 Requests Technical Opinion & Advice Re Potential for Void Formation in Reactor Vessel Head Per 800611 St Lucie Natural Circulation Cooldown Event.Requests Reply within 15 Days ML16340B1841980-10-31031 October 1980 Safety Evaluation Report Related to the Operation of Diablo Canyon Units 1 and 2.Dockets Nos. 50-275 and 50-323.(Pacific Gas & Electric Company) NRC Generic Letter 1981-061981-02-26026 February 1981 NRC Generic Letter 1981-006: Periodic Updating of Final Safety Analysis Reports (Fsars) ML16340B5471981-03-19019 March 1981 Responds to 810311 Request for Status of Outstanding Issues. Delineates Util Submittals W/O SER Input & Expected Util Submittals.Tmi & non-TMI Full Power SERs Expected Out by 810331 W/Environ Qualifications & Breakwater Items Open ML17083A8061981-03-31031 March 1981 Safety Evaluation Report Related to the Operation of Diablo Canyon Nuclear Power Plant,Units 1 & 2.Docket Nos. 50-275 and 50-323.(Pacific Gas and Electric Company) ML16340B6171981-04-30030 April 1981 Safety Evaluation Report Related to the Operation of Diablo Canyon Nuclear Power Plant,Units 1 and 2.Docket Nos. 50-275 and 50-323.(Pacific Gas and Electric Company) ML20209C4771983-09-29029 September 1983 Forwards SER Re Util 811207 Response to NRC Questions on Generic Ltr 81-21 Concerning Reactor Vessel Upper Head Steam Formation During Natural Circulation Cooldown.Licensee Submittal,Referring to Westinghouse Study,Acceptable ML20209C8691984-04-0909 April 1984 Forwards SER & SALP Inputs Based on Evaluation of FSAR Chapter 14 Initial Test Program Changes.Changes Acceptable. Chapter Should Include Loss of Offsite Power W/Loss of Turbine Generator Test & Natural Circulation Test IR 05000275/19840051984-06-0606 June 1984 IE Insp Rept 50-275/84-05 on 840326-30.No Violations or Deviations Noted.Major Areas Inspected:New Chemistry & Radiation Protection Dept Organization,Radiation Protection Training,Followup on Noncompliance & IE Info Notices ML16341C5791984-07-31031 July 1984 Safety Evaluation Report Related to the Operation of Diablo Canyon Nuclear Power Plant,Units 1 and 2.Docket Nos. 50-275 and 50-323.(Pacific Gas and Electric Company) ML16341C2131984-09-14014 September 1984 Requests Assurance That Safety Evaluation for Multi-Plant Action B-66, Natural Circulation Cooldown, Will Be Completed by 840930 ML16341A3141984-10-0505 October 1984 SER Supporting Assurance That Steam Formation in Upper Head of Reactor Vessel During Natural Circulation Cooldown (Generic Ltr 81-21) Will Not Occur,Per Generic Ltr 83-22 ML16341A3121984-10-0505 October 1984 Forwards SER Supporting Assurance That Steam Formation in Upper Head of Reactor Vessel During Natural Circulation Cooldown (Generic Ltr 81-21) Will Not Occur.Review Based on TMI Action Item I.C.1 Discussed in Generic Ltr 83-22 1981-03-31 | |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:51994&oldid=5483812"