Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19354E161 + (21:23:13, 23 December 2024)
- ML19354E160 + (21:23:15, 23 December 2024)
- ML19354E157 + (21:23:22, 23 December 2024)
- ML19354E158 + (21:23:22, 23 December 2024)
- ML19354E156 + (21:23:24, 23 December 2024)
- 05000334/LER-1989-017-01, :on 891218,feedwater Isolation Occurred Due to Erroneous Level Transmitter Root Valve Position Indication. Operations Personnel Reset Feedwater Isolation Signal + (21:23:25, 23 December 2024)
- ML19354E129 + (21:23:29, 23 December 2024)
- ML19354E127 + (21:23:30, 23 December 2024)
- ML19354E126 + (21:23:31, 23 December 2024)
- ML19354E124 + (21:23:33, 23 December 2024)
- ML19354E125 + (21:23:33, 23 December 2024)
- ML19354E123 + (21:23:34, 23 December 2024)
- ML19354E121 + (21:23:35, 23 December 2024)
- ML19354E117 + (21:23:37, 23 December 2024)
- ML19354E116 + (21:23:37, 23 December 2024)
- ML19354E115 + (21:23:38, 23 December 2024)
- ML19354E114 + (21:23:39, 23 December 2024)
- 0CAN019014, Forwards Revised Re long-term Hydrogen Monitoring Capabilities & Relief Requests,Correcting Typos + (21:23:40, 23 December 2024)
- ML19354E111 + (21:23:42, 23 December 2024)
- 05000334/LER-1989-016-01, :on 891215 & 16,erratic Level Transmitter Behavior Caused Steam Generator B hi-hi Level Feedwater Isolation.Caused by Inner Plugs Remaining Partially Inserted After Valves Opened.Plugs Freed from Seats + (21:23:43, 23 December 2024)
- PNO-V-90-003, on 900116,earthquake of 5.1 Magnitude Occurred Approx 45 Miles from Facility.Facility Shut Down Since Jul 1976 & Reactor Vessel Defueled.No Damage Identified + (21:23:46, 23 December 2024)
- 05000461/LER-1989-042, :on 891219,false RCIC Div I Steam Line Differential Pressure High Signal Caused RCIC Turbine Steam Supply Isolation Valve to Shut & RCIC Sys to Trip.Caused by Sensor Design Error.Field Alteration Begun + (21:23:48, 23 December 2024)
- 05000341/LER-1989-037, :on 891220,determined That Tech Spec Stroke Time Testing for Outboard Reactor Water Sample Line Isolation Valve Not Performed.Caused by Personnel Error. Critique of Event Being Developed + (21:23:50, 23 December 2024)
- ML19354E098 + (21:23:53, 23 December 2024)
- 05000440/LER-1989-032, :on 891228 & 900105,HPCS Sys Declared Inoperable Due to Inoperability of Div 3 Battery.Caused by Low Pilot Cell Voltage,Cell W/Slow Electrolyte Leak & Blown Power Fuse.Fuse & Hydromotor Pump Replaced + (21:23:57, 23 December 2024)
- IR 05000271/1988099 + (21:24:25, 23 December 2024)
- 05000413/LER-1989-025, :on 890922,power Lost to Condenser Circulating Water Cooling Tower Fans Due to Deenergization of 13.8 Kv Auxiliary Switchgear.Caused by Weather Conditions.Reactor Power Reduced to Maintain Condenser Vacuum + (21:24:27, 23 December 2024)
- ML19354E090 + (21:24:29, 23 December 2024)
- 05000278/LER-1989-010-03, :on 891211,monthly Surveillance Test ST 9.7 Not Performed within Surveillance Interval Established by Tech Spec Table 4.1.1.Caused by Combination of Programmatic Weaknesses.Review Performed + (21:24:34, 23 December 2024)
- ML19354E084 + (21:24:35, 23 December 2024)
- ML19354E082 + (21:24:36, 23 December 2024)
- ML19354E080 + (21:24:37, 23 December 2024)
- ML19354E079 + (21:24:38, 23 December 2024)
- ML19354E077 + (21:24:39, 23 December 2024)
- IR 05000298/1989036 + (21:24:46, 23 December 2024)
- 05000213/LER-1989-023, :on 891223,fire Barrier Separating Switchgear Room a & Cable Spreading Room Declared Inoperable When Breach in Floor/Ceiling Assembly Discovered.Caused by Inadequate Design Control.Fire Watch Initiated + (21:24:48, 23 December 2024)
- ML19354E059 + (21:24:50, 23 December 2024)
- ML19354E058 + (21:24:50, 23 December 2024)
- ST-HL-AE-3323, Responds to NRC Bulletin 88-009, Thimble Tube Thinning in Westinghouse Reactors & Discusses Insp of Bottom Mounted Instrumentation.No Detectable Defects Found on Any of 58 Thimbles + (21:24:51, 23 December 2024)
- JPN-90-007, Forwards Application for Amend to License DPR-59,revising Tech Spec 3.6.A, Pressurization & Thermal Limits, to Comply W/Generic Ltr 88-11 & Reg Guide 1.99,Rev 2 + (21:24:53, 23 December 2024)
- ML19354E052 + (21:24:56, 23 December 2024)
- ML19354E048 + (21:24:57, 23 December 2024)
- JPN-90-009, Forwards Application for Amend to License DPR-59,revising Tech Specs Re Augmented Inservice Insp of Main Steam & Feedwater Piping Welds.Spec 4.6.F.2, Structural Integrity & Associated Bases on Pages 144 & 153 Deleted + (21:24:58, 23 December 2024)
- ML19354E044 + (21:24:58, 23 December 2024)
- JAFP-90-0032, Monthly Operating Rept for Dec 1989 for Ja Fitzpatrick Nuclear Power Plant + (21:25:00, 23 December 2024)
- ML19354E039 + (21:25:02, 23 December 2024)
- ML19354E040 + (21:25:02, 23 December 2024)
- ML19354E038 + (21:25:03, 23 December 2024)
- ML19354E037 + (21:25:04, 23 December 2024)
- JPN-90-011, Forwards Application for Amend to License DPR-59,revising Tech Spec 4.11.B.2, Crescent Area Ventilation to Require Calibr of Existing Temp Indicator Controllers or New Temp Control Switches + (21:25:04, 23 December 2024)
- JPN-90-008, Forwards Application for Amend to License DPR-59,revising Tech Spec Section 4.7.A.2 & Associated Bases Re Primary Containment Leak Rate Testing Requirements + (21:25:06, 23 December 2024)