ML19354E058
ML19354E058 | |
Person / Time | |
---|---|
Site: | FitzPatrick |
Issue date: | 01/12/1990 |
From: | Brons J POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK |
To: | |
Shared Package | |
ML19354E054 | List: |
References | |
RTR-REGGD-01.099, RTR-REGGD-1.099 GL-88-11, NUDOCS 9001250303 | |
Download: ML19354E058 (1) | |
Similar Documents at FitzPatrick | |
---|---|
Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARJAFP-99-0278, Application for Amend to License DPR-59,providing Rev C to Proposed TS Change Converting Current TSs to Improved Standard Tss.Withdrawal of JPTS-95-004,proposed TS Changes Re Inservice Leak & Hydrostatic Testing Operation,Reflected1999-10-14014 October 1999
[Table view]Application for Amend to License DPR-59,providing Rev C to Proposed TS Change Converting Current TSs to Improved Standard Tss.Withdrawal of JPTS-95-004,proposed TS Changes Re Inservice Leak & Hydrostatic Testing Operation,Reflected JAFP-99-0279, Correction to 980226 Application for Amend to License DPR-59,revising Ref 19 to Assume 90% SBGT Sys Charcoal Efficiency,Instead of 99%.Ref 19 on TS Page 285 Needs to Be Changed from Rev 0 to Rev 1,based on Revised Calculation1999-10-14014 October 1999 Correction to 980226 Application for Amend to License DPR-59,revising Ref 19 to Assume 90% SBGT Sys Charcoal Efficiency,Instead of 99%.Ref 19 on TS Page 285 Needs to Be Changed from Rev 0 to Rev 1,based on Revised Calculation ML20216J8321999-09-29029 September 1999 Application for Amend to License DPR-59,proposing Change to TS 3.5.B.3 & Associated Bases.Change Extends LCO for RHRSW Sys from 7 Days to 11 Days with Special Conditions to Allow for Installation of Mod to Division a RHRSW Strainer ML20196F5931999-06-22022 June 1999 Application for Amend to License DPR-59,changing to Pressure Temp limits.Pressure-temp Curves & Associated LCO & Bases Changes Included in Proposed Amend ML20195B8741999-06-0101 June 1999 Revised Application for Amend to License DPR-59,converting Plant CTS to Be Consistent with Improved Std TS in NUREG-1433,Rev 1,dtd Apr 1995 ML20206U1351999-05-19019 May 1999 Application for Amend to License DPR-59,requesting 14 Day AOT for EDG Sys ML20205K1041999-04-0505 April 1999 Application for Amend to License DPR-59,removing Position Title of General Manager from Sections & Will State That If Site Executive Officer Is Unavailable,Responsibilities Will Be Delegated to Another Staff Member,In Writing ML20205D8271999-03-26026 March 1999 Application for Amend to License DPR-59,converting CTS to Be Consistent with Improved Std TS in NUREG-1433,Rev 1 ML20199H3511999-01-15015 January 1999 Application for Amend to License DPR-59,removing Local Power Range Monitor (LPRM) Signal Calibr Method from TS Table 4.1-2 JAFP-98-0385, Revised Application for Amend to License DPR-59,revising Design Features.Rev 7 to non-proprietary & Proprietary Versions of HI-971661, Licensing Rept for Reracking of Ja FitzPatrick SFP, Encl.Proprietary Info Withheld1998-12-0303 December 1998 Revised Application for Amend to License DPR-59,revising Design Features.Rev 7 to non-proprietary & Proprietary Versions of HI-971661, Licensing Rept for Reracking of Ja FitzPatrick SFP, Encl.Proprietary Info Withheld ML20236X7811998-08-0303 August 1998 Application for Amend to License DPR-59,proposing Rev to Note Which Will Allow TS Section 1.1.A Re SLMCPR to Be Applicable During Cycle 14 ML20236M6151998-07-10010 July 1998 Application for Amend to License DPR-59 to Relocate Portions of TS 3/4.6.C, RCS - Coolant Chemistry, from TS to UFSAR & Applicable Plant Procedures Controlled by 10CFR50.59 Process ML20236L2741998-07-0606 July 1998 Application for Amend to License DPR-59,amending Tech Specs Section 3.5.b.1 Re Main Condenser Steam Jet Air Ejector & Table 3.10-1 Re Radiation Monitoring Sys That Initiates &/Or Isolates Sys ML20249B1551998-06-16016 June 1998 Application for Amend to License DPR-59,relocating Safety Review Committee Review,Audit & Related Record Keeping Requirements from Tech Specs to Chapter 17 of Fsar,Per Administrative Ltr 95-06 ML20217K0361998-03-30030 March 1998 Application for Amend to License DPR-59,changing Interval of Selected LSFT from Semiannually to Once Per 24 Months & Revising Definition of LSFT to Be Consistent w/NUREG-1433 ML20247F7791998-02-26026 February 1998 Application for Amend to License DPR-59,changing Allowable Containment Leakage Rate to 1.5 Percent Per Day & Assumed Value of Filter Efficiency for SBGT Used in Calculations to Determine Dose Effects to Onsite ML20202G8551998-02-0606 February 1998 Revised Application for Amend to License DPR-59,to Revise TS Tables 3.2-2 & 4.4-2,revising Allowed Outage Times for 4kV Emergency Bus Undervoltage Trip Functions & Replace Generic Actions for Inoperable Instrument Channels ML20202D5391998-02-0606 February 1998 Application for Amend to License DPR-59,allowing RCS Pressure Tests to Be Performed in Cold Shutdown Mode ML20202D3881998-02-0606 February 1998 Application for Amend to License DPR-59,revising RPS Normal Supply Electrical Protection Assembly Undervoltage Trip Setpoint as Result of Reanalysis Based on Most Limiting Min Voltage Requirements of Applied Loads ML20203J6671997-12-12012 December 1997 Application for Amend to License DPR-59,revising TS Section 6.2.2.6 Re Administrative Controls for Normal Working Hours of Plant Staff Who Perform Safety Related Functions ML20217H9801997-10-14014 October 1997 Application for Amend to License DPR-59,proposing Revision to TS Re Design Features Section,Including Revised Limits for Fuel Storage.Changes Correct Maximum Exposure Dependent, Infinite Lattice Multiplication Factor for Fuel Bundles ML20217G2991997-10-0808 October 1997 Application for Amend to License DPR-59,reflecting Change in LCO ML20140D8011997-04-14014 April 1997 Application for Amend to License DPR-59,deleting Plant Staff Performance Audit Requirement from Section 6.5.2.9.b & Incorporating Plant Staff Performance Review Requirement in Section 6.5.2.8 ML20135B1871996-11-26026 November 1996 Application for Amend to License DPR-59,requesting That Snubber Operability,Surveillance & Records Requirements in TS Be Relocated to Plant Controlled Documents ML20115G0581996-07-12012 July 1996 Application for Amend to License DPR-59,revising Min Critical Power Ratio Safety Limit ML20113B6261996-06-20020 June 1996 Application for Amend to License DPR-59,supporting Adoption of Primary Containment Leakage Rate Testing Requirements of Option B 10CFR50,App J at Plant ML20112D5661996-05-30030 May 1996 Application for Amend to License DPR-59,eliminating Selected Response Time Testing Requirements ML20112D1501996-05-30030 May 1996 Application for Amend to License DPR-59,revising Minimum Critical Power Ratio Safety Limit & Associated Basis ML20112D2671996-05-30030 May 1996 Application for Amend to License DPR-59,revising ATWS Recirculation Pump Trip Reactor Pressure ML20112B6411996-05-16016 May 1996 Application for Amend to License DPR-59,deleting Requirement for PORC to Review Fire Protection Program & Implementing Procedures.Addl Deletion of Insp & Audit Requirements of Specs 6.14.A & 6.14.B ML20108D1151996-04-24024 April 1996 Application for Amend to License DPR-59,supporting Adoption of Primary Containment Lrt Requirements of Option B to 10CFR50,App J & Clarifying Numerical Value of Allowable Containment Leakage Rate as 1.5% Per Day ML20107M4461996-04-24024 April 1996 Application for Amend to License DPR-59,relocating TS 3.11.B/4.11.B Crescent Area Ventilation & Associated Bases from TS to Controlled Procedure ML20101H6671996-03-27027 March 1996 Application for Amend to License DPR-59,adopting Primary Containment Lrt Requirements of Option B to 10CFR50,App J at Plant & Clarifies Numerical Value of Allowable Containment Lrt as 1.5% Per Day ML20101F8311996-03-22022 March 1996 Application for Amend to License DPR-59,revising TS to Implement BWROG Option I-D long-term Solution for Thermal Hydraulic Stability ML20101H3671996-03-22022 March 1996 Application for Amend to License DPR-59,changing TS Table 3.2-2, Core & Containment Cooling Sys Initiation & Control Instrumentation Operability Requirements ML20097A1921996-02-0101 February 1996 Application for Amend to License DPR-59,allowing RCS Pressure Tests to Be Performed While Remaining in Cold Shutdown Mode ML20100C2911996-01-25025 January 1996 Application for Amend to License DPR-59,revising Allowed out-of-service Times for Single Inoperable EDGs to Accommodate on-line Maint of EDGs ML20097J6661996-01-25025 January 1996 Application for Amend to License DPR-59,revising TS to Extend Instrumentation & Miscellaneous Surveillance Test Intervals to Support 24-month Operating Cycle ML20095F7051995-12-14014 December 1995 Application for Amend to License DPR-59,revising TSs to Incorporate IST Requirements of Section XI of ASME Boiler & Pressure Vessel Code JPN-95-051, Application for Amend to License DPR-59,proposing to Extend Surveillance Test Intervals for SLC Sys to Support 24 Month Operating Cycles1995-11-30030 November 1995 Application for Amend to License DPR-59,proposing to Extend Surveillance Test Intervals for SLC Sys to Support 24 Month Operating Cycles ML20094B6471995-10-25025 October 1995 Application for Amend to License DPR-59,revising TS Re Extensionof Containment Sys Surveillance Test Intervals to Accommodate 24 Month Operating Cycles ML20092H5341995-09-15015 September 1995 Application for Amend to License DPR-59,proposing TS by Extending Surveillance Test Intervals for Auxiliary Electrical Sys to Support 24 Month Operating Cycles ML20086P6421995-07-21021 July 1995 Application for Amend to License DPR-59.Amend Would Replace title-specific List of Members on PORC W/More General Statement of Membership Requirements ML20085G3561995-06-15015 June 1995 Application for Amend to License DPR-59,proposing Changes to Ts,By Extending Surveillance Test Intervals for Control Rod Sys to Support 24 Month Operating Cycles ML20083M8081995-05-12012 May 1995 Application for Amend to License DPR-59,extending Surveillance Test Intervals for Esws to Support 24 Month Operating Cycles,Per GL 91-04 JPN-95-022, Application for Amend to License DPR-59.Amend Would Extend Surveillance Test Intervals for Nuclear Steam Supply Sys to Support 24 Month Operating Cycles1995-04-12012 April 1995 Application for Amend to License DPR-59.Amend Would Extend Surveillance Test Intervals for Nuclear Steam Supply Sys to Support 24 Month Operating Cycles JPN-95-011, Application for Amend to License DPR-59,to Extend Surveillance Test Intervals for Snubber Systems to Support 24 Month Operating Cycles1995-03-0202 March 1995 Application for Amend to License DPR-59,to Extend Surveillance Test Intervals for Snubber Systems to Support 24 Month Operating Cycles JPN-95-007, Application for Amend to License DPR-59,to Impose Operability & Surveillance Requirements for Rv Overfill Protection Instrumentation1995-02-22022 February 1995 Application for Amend to License DPR-59,to Impose Operability & Surveillance Requirements for Rv Overfill Protection Instrumentation JPN-94-065, Application for Amend to License DPR-59,revising TSs Re PORC Membership & Review Responsibilities1994-12-0202 December 1994 Application for Amend to License DPR-59,revising TSs Re PORC Membership & Review Responsibilities ML20076F4631994-10-0707 October 1994 Application for Amend to License DPR-59,changing TS Re Safety/Relief Valve Testing Requirements 1999-09-29 Category:TEXT-LICENSE APPLICATIONS & PERMITS MONTHYEARJAFP-99-0279, Correction to 980226 Application for Amend to License DPR-59,revising Ref 19 to Assume 90% SBGT Sys Charcoal Efficiency,Instead of 99%.Ref 19 on TS Page 285 Needs to Be Changed from Rev 0 to Rev 1,based on Revised Calculation1999-10-14014 October 1999
[Table view]Correction to 980226 Application for Amend to License DPR-59,revising Ref 19 to Assume 90% SBGT Sys Charcoal Efficiency,Instead of 99%.Ref 19 on TS Page 285 Needs to Be Changed from Rev 0 to Rev 1,based on Revised Calculation JAFP-99-0278, Application for Amend to License DPR-59,providing Rev C to Proposed TS Change Converting Current TSs to Improved Standard Tss.Withdrawal of JPTS-95-004,proposed TS Changes Re Inservice Leak & Hydrostatic Testing Operation,Reflected1999-10-14014 October 1999 Application for Amend to License DPR-59,providing Rev C to Proposed TS Change Converting Current TSs to Improved Standard Tss.Withdrawal of JPTS-95-004,proposed TS Changes Re Inservice Leak & Hydrostatic Testing Operation,Reflected ML20216J8321999-09-29029 September 1999 Application for Amend to License DPR-59,proposing Change to TS 3.5.B.3 & Associated Bases.Change Extends LCO for RHRSW Sys from 7 Days to 11 Days with Special Conditions to Allow for Installation of Mod to Division a RHRSW Strainer ML20196F5931999-06-22022 June 1999 Application for Amend to License DPR-59,changing to Pressure Temp limits.Pressure-temp Curves & Associated LCO & Bases Changes Included in Proposed Amend ML20195B8741999-06-0101 June 1999 Revised Application for Amend to License DPR-59,converting Plant CTS to Be Consistent with Improved Std TS in NUREG-1433,Rev 1,dtd Apr 1995 ML20206U1351999-05-19019 May 1999 Application for Amend to License DPR-59,requesting 14 Day AOT for EDG Sys ML20205K1041999-04-0505 April 1999 Application for Amend to License DPR-59,removing Position Title of General Manager from Sections & Will State That If Site Executive Officer Is Unavailable,Responsibilities Will Be Delegated to Another Staff Member,In Writing ML20205D8271999-03-26026 March 1999 Application for Amend to License DPR-59,converting CTS to Be Consistent with Improved Std TS in NUREG-1433,Rev 1 ML20199H3511999-01-15015 January 1999 Application for Amend to License DPR-59,removing Local Power Range Monitor (LPRM) Signal Calibr Method from TS Table 4.1-2 JAFP-98-0385, Revised Application for Amend to License DPR-59,revising Design Features.Rev 7 to non-proprietary & Proprietary Versions of HI-971661, Licensing Rept for Reracking of Ja FitzPatrick SFP, Encl.Proprietary Info Withheld1998-12-0303 December 1998 Revised Application for Amend to License DPR-59,revising Design Features.Rev 7 to non-proprietary & Proprietary Versions of HI-971661, Licensing Rept for Reracking of Ja FitzPatrick SFP, Encl.Proprietary Info Withheld ML20236X7811998-08-0303 August 1998 Application for Amend to License DPR-59,proposing Rev to Note Which Will Allow TS Section 1.1.A Re SLMCPR to Be Applicable During Cycle 14 ML20236X5831998-07-29029 July 1998 Amend 245 to License DPR-59,consisting of Changes to TS in Response to Application Transmitted by ,Requesting Rev of Reactor Protection Sys Normally Supply Electrical Protection Assembly Undervoltage Trip Setpoint ML20236M6151998-07-10010 July 1998 Application for Amend to License DPR-59 to Relocate Portions of TS 3/4.6.C, RCS - Coolant Chemistry, from TS to UFSAR & Applicable Plant Procedures Controlled by 10CFR50.59 Process ML20236L2741998-07-0606 July 1998 Application for Amend to License DPR-59,amending Tech Specs Section 3.5.b.1 Re Main Condenser Steam Jet Air Ejector & Table 3.10-1 Re Radiation Monitoring Sys That Initiates &/Or Isolates Sys ML20249B1551998-06-16016 June 1998 Application for Amend to License DPR-59,relocating Safety Review Committee Review,Audit & Related Record Keeping Requirements from Tech Specs to Chapter 17 of Fsar,Per Administrative Ltr 95-06 ML20217K0361998-03-30030 March 1998 Application for Amend to License DPR-59,changing Interval of Selected LSFT from Semiannually to Once Per 24 Months & Revising Definition of LSFT to Be Consistent w/NUREG-1433 ML20247F7791998-02-26026 February 1998 Application for Amend to License DPR-59,changing Allowable Containment Leakage Rate to 1.5 Percent Per Day & Assumed Value of Filter Efficiency for SBGT Used in Calculations to Determine Dose Effects to Onsite ML20202G8551998-02-0606 February 1998 Revised Application for Amend to License DPR-59,to Revise TS Tables 3.2-2 & 4.4-2,revising Allowed Outage Times for 4kV Emergency Bus Undervoltage Trip Functions & Replace Generic Actions for Inoperable Instrument Channels ML20202D3881998-02-0606 February 1998 Application for Amend to License DPR-59,revising RPS Normal Supply Electrical Protection Assembly Undervoltage Trip Setpoint as Result of Reanalysis Based on Most Limiting Min Voltage Requirements of Applied Loads ML20202D5391998-02-0606 February 1998 Application for Amend to License DPR-59,allowing RCS Pressure Tests to Be Performed in Cold Shutdown Mode ML20203J6671997-12-12012 December 1997 Application for Amend to License DPR-59,revising TS Section 6.2.2.6 Re Administrative Controls for Normal Working Hours of Plant Staff Who Perform Safety Related Functions ML20217H9801997-10-14014 October 1997 Application for Amend to License DPR-59,proposing Revision to TS Re Design Features Section,Including Revised Limits for Fuel Storage.Changes Correct Maximum Exposure Dependent, Infinite Lattice Multiplication Factor for Fuel Bundles ML20217G2991997-10-0808 October 1997 Application for Amend to License DPR-59,reflecting Change in LCO ML20140D8011997-04-14014 April 1997 Application for Amend to License DPR-59,deleting Plant Staff Performance Audit Requirement from Section 6.5.2.9.b & Incorporating Plant Staff Performance Review Requirement in Section 6.5.2.8 ML20135B1871996-11-26026 November 1996 Application for Amend to License DPR-59,requesting That Snubber Operability,Surveillance & Records Requirements in TS Be Relocated to Plant Controlled Documents ML20115G0581996-07-12012 July 1996 Application for Amend to License DPR-59,revising Min Critical Power Ratio Safety Limit ML20113B6261996-06-20020 June 1996 Application for Amend to License DPR-59,supporting Adoption of Primary Containment Leakage Rate Testing Requirements of Option B 10CFR50,App J at Plant ML20112D2671996-05-30030 May 1996 Application for Amend to License DPR-59,revising ATWS Recirculation Pump Trip Reactor Pressure ML20112D1501996-05-30030 May 1996 Application for Amend to License DPR-59,revising Minimum Critical Power Ratio Safety Limit & Associated Basis ML20112D5661996-05-30030 May 1996 Application for Amend to License DPR-59,eliminating Selected Response Time Testing Requirements ML20112B6411996-05-16016 May 1996 Application for Amend to License DPR-59,deleting Requirement for PORC to Review Fire Protection Program & Implementing Procedures.Addl Deletion of Insp & Audit Requirements of Specs 6.14.A & 6.14.B ML20107M4461996-04-24024 April 1996 Application for Amend to License DPR-59,relocating TS 3.11.B/4.11.B Crescent Area Ventilation & Associated Bases from TS to Controlled Procedure ML20108D1151996-04-24024 April 1996 Application for Amend to License DPR-59,supporting Adoption of Primary Containment Lrt Requirements of Option B to 10CFR50,App J & Clarifying Numerical Value of Allowable Containment Leakage Rate as 1.5% Per Day ML20101H6671996-03-27027 March 1996 Application for Amend to License DPR-59,adopting Primary Containment Lrt Requirements of Option B to 10CFR50,App J at Plant & Clarifies Numerical Value of Allowable Containment Lrt as 1.5% Per Day ML20101F8311996-03-22022 March 1996 Application for Amend to License DPR-59,revising TS to Implement BWROG Option I-D long-term Solution for Thermal Hydraulic Stability ML20101H3671996-03-22022 March 1996 Application for Amend to License DPR-59,changing TS Table 3.2-2, Core & Containment Cooling Sys Initiation & Control Instrumentation Operability Requirements ML20097A1921996-02-0101 February 1996 Application for Amend to License DPR-59,allowing RCS Pressure Tests to Be Performed While Remaining in Cold Shutdown Mode ML20100C2911996-01-25025 January 1996 Application for Amend to License DPR-59,revising Allowed out-of-service Times for Single Inoperable EDGs to Accommodate on-line Maint of EDGs ML20097J6661996-01-25025 January 1996 Application for Amend to License DPR-59,revising TS to Extend Instrumentation & Miscellaneous Surveillance Test Intervals to Support 24-month Operating Cycle ML20095F7051995-12-14014 December 1995 Application for Amend to License DPR-59,revising TSs to Incorporate IST Requirements of Section XI of ASME Boiler & Pressure Vessel Code JPN-95-051, Application for Amend to License DPR-59,proposing to Extend Surveillance Test Intervals for SLC Sys to Support 24 Month Operating Cycles1995-11-30030 November 1995 Application for Amend to License DPR-59,proposing to Extend Surveillance Test Intervals for SLC Sys to Support 24 Month Operating Cycles ML20094B6471995-10-25025 October 1995 Application for Amend to License DPR-59,revising TS Re Extensionof Containment Sys Surveillance Test Intervals to Accommodate 24 Month Operating Cycles ML20092H5341995-09-15015 September 1995 Application for Amend to License DPR-59,proposing TS by Extending Surveillance Test Intervals for Auxiliary Electrical Sys to Support 24 Month Operating Cycles ML20086P6421995-07-21021 July 1995 Application for Amend to License DPR-59.Amend Would Replace title-specific List of Members on PORC W/More General Statement of Membership Requirements ML20085G3561995-06-15015 June 1995 Application for Amend to License DPR-59,proposing Changes to Ts,By Extending Surveillance Test Intervals for Control Rod Sys to Support 24 Month Operating Cycles ML20083M8081995-05-12012 May 1995 Application for Amend to License DPR-59,extending Surveillance Test Intervals for Esws to Support 24 Month Operating Cycles,Per GL 91-04 JPN-95-022, Application for Amend to License DPR-59.Amend Would Extend Surveillance Test Intervals for Nuclear Steam Supply Sys to Support 24 Month Operating Cycles1995-04-12012 April 1995 Application for Amend to License DPR-59.Amend Would Extend Surveillance Test Intervals for Nuclear Steam Supply Sys to Support 24 Month Operating Cycles JPN-95-011, Application for Amend to License DPR-59,to Extend Surveillance Test Intervals for Snubber Systems to Support 24 Month Operating Cycles1995-03-0202 March 1995 Application for Amend to License DPR-59,to Extend Surveillance Test Intervals for Snubber Systems to Support 24 Month Operating Cycles JPN-95-007, Application for Amend to License DPR-59,to Impose Operability & Surveillance Requirements for Rv Overfill Protection Instrumentation1995-02-22022 February 1995 Application for Amend to License DPR-59,to Impose Operability & Surveillance Requirements for Rv Overfill Protection Instrumentation JPN-94-065, Application for Amend to License DPR-59,revising TSs Re PORC Membership & Review Responsibilities1994-12-0202 December 1994 Application for Amend to License DPR-59,revising TSs Re PORC Membership & Review Responsibilities 1999-09-29 |
Text
a 1
J' ..
BEFORE THE UNITED STATES .
1 NUCLEAR REGULATORY COMMISSION 1 In the Matter of = . .
)- _ .
)
NEWYORK POWER AUTHORITY - ) Docket No. 50-333 )
1 JJames A. FitzPatrick Nuclear Power Plant )
APPUCATION FOR AMENDMENT TO OPERATING UCENSE i Pursuant to Section 50.90 of the regulations of the Nuclear Regulatory Commission, the -
New York-Power Authority, as holder of Facility Operating Ucense DPR-59, hereby.
applies for an Amendment to the Technical Specifications contained in Appendix A of this
~
license.'
This application for an amendment to the James A. FitzPatrick Technical Specifications revises Specification 3.6.A, fPressurization and Thermal Umits," to comply with Generic r Letter 88-11 and R3gulatory Guide 1.99, Revision 2.- Specifically,'the existing pressure- -
temperature curves in Figure 3.6-1 are replaced with new curves for operation to .12,14, and 16 Effective Full Power Years (EFPY).- The Umiting Condition for Operation and the . ;
Bases Section are revised to reflect the new pressure-temperature limits.
The proposed changes. to the Technical Specifications are' Attachment I to _this l Application for Amendment to the Operating Ucense. The Safety Evaluation for the proposed changes is included as Attachment II.
New York Power Authority i _ hY , E.rons!
L Executive Vice President Nuclear Generation STATE OF NEW YORK COUNTY OF WESTCHESTER Subscribed and sworn to before me i
this /c2 day of 1990.
l'
&n OwJane Notary Public FF M aS Ncu#"s"..S N et cua?$ sN $ '
i e
~
L 9001250303 900112
!! .PDR ADOCK0500g3 l *P
.e*- - .c -. - - ~ , = , e, , . . . . - -r~ w _- _ -*