ML19354E084
| ML19354E084 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 12/31/1989 |
| From: | Miller D, Wall K CONNECTICUT YANKEE ATOMIC POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9001250338 | |
| Download: ML19354E084 (9) | |
Text
i
=
i ONNFCTICUT YANKEE ATOMIC POWER COMPANY j
)
HADDAM NECK PLANT RR81
- DOX 127E
- EAST HAMPTON, CT 06424 9341 l
I 1
i i
l l
l January 15,1990 Re: Technical Specification 6.9 ld Docket No. 50 213 l
l U. S. Nuclear Regulatory Commission Document Control Desk r
Washington, D. C. 20555 3
k i
Dear Sir:
in accordance with reponin ; requirements of Technical Specification 6.9.1d, the Connecticut Yankee liaddam Neck Plant Month y Operating Repon 8912, covering operations for the period i
December 1,1989 to December 31,1989 is hereby forwarded.
l Very Truly yours, j
4 W
l i
Donald B. Miller, Jr.
l Station Superintendent DBM/mdw oc:
(1)
Regional Administrator, Region 1 l
U. S. Nuclear Regulatory Commission 631 Park Avenue
' ~
King of Prussia, PA 19406 (2)
John T. Shediosky l/_
Sr. Residert Inspector Connecticut Yankee l
[' HOCK 0500o2g3 38 891231 P
a R
PDC j
I 1026 3 REV iM7
/
1 Connecticut Yankee Atomic Power Company HaMam Neck Plant Haddam, Connecticut l
l Monthly Operating Report No. 8912 ForThe Month of December 1989 l
l Plant Onmtions Summarv - Dacamher.1989 1
The following is a summary of Plant Operations for December,1989. 'Ihe 15th refueling and maintenance outage continued for the month of December, j
i e
t I
L I
4 I
k 4
4 5
1 i
t.
l:
')lI I
1I l
iI.
t i
!,I L
s i
MIA
.f f
EE BF FSR O
I m
RRA
=
OCR A
EG INRN CE I
ERRR PAOO STFW m
+
4 N
m OT TW
~
I
~
IOT TTE C
F,
~
W NO I
TET CFA EAR FSE F
P E
O a
0 T
9 L
/
U m
1 SER M
I T
C N
F U
L A
m M E s
SU C
A C
I s
g m
n e
i.
ot d9 T
ni n8 N
re9 E
eeo 1
M rl fh W
eb t r ETRW waC ne SO t & ob Y
W erI mm S
C r o e
eprec h e oh e m
T rf t D l,
ll ii
<1 i
i!
t 14 i!
a ti 1
>1;'
h 5
{!!I lIi LI I!t i
lI l'
i
~
M'.f f
IEE TBF NIA AFSR CO I
ERRA RPOP F
EC INRI CE D
EKRR IAOO LTFB II Cr Ir TW CTI I
AEC RI EPT V
I IOT TTE C
F,
ENE RER RE OA CT H
M
,C I
TET CFA EAR FSE F
P E
O 09 T
/
L 1
USER NO ITC N
e U
c F
n L
a A
n M E s
e S
t U
n A
i C
a M
sme r
ec e
ot nhb niat m T
n ne IN eee oc rl t me M
H eb n D
C waie TRW t ah g SO Y
W erMt n.
r o i9 S
C ep rrd8 h eoon9 T rf f e1 l
,4 1
i!~
4 i
i 4
1I ei 9
1i t
!1ii I
- 4I.
e t
AVERAGE DAILY UNIT POWER LEVEL DOCKET No.
50-213 Conn. Yankee UNIT Haddam Neck DATE 12/89 COMPLETED BY K. C. Wall TELEPHONE (203) 267 3654 MONTH:
December DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28-0 13 0
29 0
14 0
30 0
15 0
31 0
16 O
INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Complete the nearest whole megawatt.
(9/77)
L I
i CONNECTICUT YANKEE REACTOR COOLANT DATA MONTH! DECEMBER 1989 6
REACTOR COOLANT ANALYSIS MINIMUM AVERAGE MAXIMUM PH E 25 DEGREES C 4.51E+00 t 4.56E+00 t 4 80E+00 t CONDUCTIVITY (UMHOS/CM) t 7.92E+00 1 9.28E+00 8 9 84E+00_t i
- <5 00E-02 3 <5.00E-02 1 <5.00E-02 1 i
DISSOLVED OXYGEN (PPB)
- <5 00E+00 t'<5 00E+00 i <5 00E+00 i BORON (PPM) i 2.61E+03 t-2.64E+03 ~t 2.71E+03 1 LITHIUM (PPM) 1 0.00E-01 8 0.00E-01 i 0 00E-01 i TOTAL GAMMA ACT. (UC/ML) t 4.06E-03 8 4.85E-03 8 5 59E-03 t 10 DINE-131 ACT. (UC/ML) 1 0 00E-01.8 0.00E-01 1 0.00E-01 3 i
I-131/I-133 RATIO t
0.00E-01 1 0.00E-01 1 0.00E-01 8 CRUD (MG/ LITER) t <1.00E-02 1 <1.00E-02 3 <1.00E-02 8 TRITIUM (UC/HL) i 2.30E-02 t-2.43E-02 1 2.54E-02 1 HYDROGEN (CC/KG) 1 1.00E-01 1 1.00E-01
- 1 00E-01 8 t
AERATED LIQUID WASTE PROCESSED (GALLONS)*
0.00E-01 i
WASTE LIQUID PROCESSED THROUGH BORON RECOVERY (GALLONS)*
0.00E-01 AVERAGE PRIMARY LEAK RATE (GALLONS PER MINUTE)1 0.00E-01 PRIMARY TO SECONDARY LEAK RATE (GALLONS PER MINUTE)!
0.00E+00 l
4 1
5
.b
mRC OPERATING StATU$ REPORT 1
f Neddam Neck-i
- 1. Docket: 50 213
- 2. Reporting Period: 12/89 Outepe
- On-line Hours: 744.0 +
0.0 = 744.0 f
- 3. Utility
Contact:
J. Stanford (203) 267 3635
- 4. Licensed thernet Power ( w t): 1825 3
- 5. Nameplete kettne (Broes We): 667 m 0.9
- 600.3 I
6, Design Electrical Rating (Net We): 582
- 7. Meuleue Dependeble Cepecity (Geoss MWe): 591.8
- 8. Monteue Dependebte Capecity (uct W e): 565 l
- 9. 1f changes occur above since test report, reasons are: NONE
- 10. Power level to which restricted, if any (het We): N/A l
- 11. Reasons for restriction, if any: N/A I
MONtX YEAR TO DATE CUMULATIVE
- 12. Report period hours:
744.0 8,760.0 192,864.0 t
- 13. Hours retttor eritiCet 0.0 5,883.3 158,149.2 j
- 14. Reactor reserve shutdown hours:
0.0 0.0 '
i,285.0
- 15. Hours generator on ttne:
0.0 5,859.0 152,087.6
[
- 16. Unit reserve shutdown hours:
0.0 0.0 398.0
- 17. Gross thermal energy generated (WtH):
0.0 9,466,757.0 262,867,318.0 *
)
- 18. Gross electricet energy generated (MWeH):
0.0 3,121,835.0 86,093,046.0 *
- 19. Net electrical energy generated (WeH):
' *1,972.1 2,956,500.1 81,822,960.0 *
- 20. Unit service factor 0.0 66.9 78.9
- 21. Unit evettability factor 0.0 66.9 79.1 l
- 22. Unit cepecity factor using MDC net:
0.0 59.7 77.3 J
- 23. Unit cepecity factor using DER net 0.0 58.0 72.9
- 24. Unit forced outage rate:
0.0 0.0 5.6
- 25. rorced outage hours:
0.0 0.0 8,975.6
- 26. Shutdowns scheckJted over next 6 months (type,dete, chJratlan): NONE
- 27. If currently shutdown, estimated startup date: 4/28/90 1
t
- Cunulative values from the first criticellty (07/24/67). (The remaining cumulative values are from the first date of connercist operation, 01/01/68).
BOCKET NO. 50-213 UNIT SHUTDOWMS AND POWER REDUCTIONS UNIT MAME Comoecticut Yamit, DATE COWLETED BY r_ c_ mrt December TELEPHONE 203-267-MM REPORT MONTH u
OM n Cause & Corrective N7
., S g
LER 4
.eo N
No.
Date UE E
jjg RPT.
I E3 Action to
~
e Fruent h rence
[
ff w
89-03 12/1/89 5
744 C
1 N/A RC Fuel XX.
Continuation of Core XV-XVI Refueling 3
4 i
2 Exhibit C-lastructices Method:
F Forced Reason:
S Scheduled
~ A-Equipment Failure (Explain)
H-Other(Explain
_1-Manual for Freparation of Data.
2-Manual Scram Entry Sheets for Licensea B-Maintenance or Test 3-Automatic Scrami Event Report (LER) File C-Refueling 4-Other(Exp1 min)
D-Regulatory Restriction E-Operator Training & License Examination 5
F-Administrative Exhibit 1 Same Source C-Operational Error (Explain)
_ _ _ _ _ _ _ _ _ _ _ _