Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20002A854 + (20:59:22, 23 December 2024)
- IR 05000267/1980013 + (20:59:44, 23 December 2024)
- ML20002A851 + (20:59:45, 23 December 2024)
- ML20002A849 + (20:59:46, 23 December 2024)
- ML20002A847 + (20:59:47, 23 December 2024)
- ML20002A845 + (20:59:48, 23 December 2024)
- ML20002A842 + (20:59:49, 23 December 2024)
- ML20002A838 + (20:59:51, 23 December 2024)
- IR 05000395/1980020 + (20:59:52, 23 December 2024)
- ML20002A835 + (20:59:53, 23 December 2024)
- ML20002A834 + (20:59:54, 23 December 2024)
- ML20002A832 + (20:59:55, 23 December 2024)
- ML20002A833 + (20:59:55, 23 December 2024)
- ML20002A829 + (20:59:56, 23 December 2024)
- ML20002A828 + (20:59:57, 23 December 2024)
- ML20002A827 + (20:59:58, 23 December 2024)
- 05000282/LER-1980-031-03, /03L-0:on 801017,during Surveillance Program Review,Discovery Was Made That Steam Exclusion Test SP1112 Was Not Done for Sept 1980.Caused by Personnel Oversight. No Changes Considered.Involved Personnel Will Review Rept + (21:00:03, 23 December 2024)
- ML20002A825 + (21:00:04, 23 December 2024)
- ML20002A824 + (21:00:05, 23 December 2024)
- 05000282/LER-1980-031, Forwards LER 80-031/03L-0 + (21:00:07, 23 December 2024)
- ML20002A821 + (21:00:08, 23 December 2024)
- ML20002A819 + (21:00:11, 23 December 2024)
- ML20002A817 + (21:00:12, 23 December 2024)
- ML20002A815 + (21:00:13, 23 December 2024)
- ML20002A812 + (21:00:14, 23 December 2024)
- ML20002A811 + (21:00:15, 23 December 2024)
- ML20002A807 + (21:00:16, 23 December 2024)
- ML20002A808 + (21:00:16, 23 December 2024)
- 05000313/LER-1979-010, Forwards Updated LER 79-010/01X-1 + (21:00:18, 23 December 2024)
- 05000296/LER-1980-042-03, /03L-0:on 801017,while Performing Special Instruction 4.2.B-5,drywell High Pressure,Switch 2 on PS-64- 58B Operated at 0.07 Psig Above Tech Spec Limits.Caused by Instrument Drift.Switch Recalibr & Retested Satisfactorily + (21:00:19, 23 December 2024)
- 05000368/LER-1980-079-03, /03L-0:on 801015,during Mode 1,discovery Made That Cover Panel to C HPSI Pump Room cooler,2 VUC-11B,had Not Been Reinstalled.Caused by Insufficient Procedural Guidelines for Transfer of Maint Activity Responsibility + (21:00:21, 23 December 2024)
- ML20002A802 + (21:00:23, 23 December 2024)
- ML20002A801 + (21:00:24, 23 December 2024)
- 05000296/LER-1980-042, Forwards LER 80-042/03L-0 + (21:00:25, 23 December 2024)
- 05000296/LER-1980-044-01, /01T-0:on 801031,notification Received That Drywell Pressure Transmitter 3-PT-64-67 Was Not Qualified for Radiation Environ Following Loca,Per IE Bulletin 79-01B. Transmitter Model Gemac 556 Replaced W/Foxboro E11GM + (21:00:27, 23 December 2024)
- 05000368/LER-1980-079, Forwards LER 80-079/03L-0 + (21:00:29, 23 December 2024)
- ML20002A795 + (21:00:30, 23 December 2024)
- 05000296/LER-1980-044, Forwards LER 80-044/01T-0 + (21:00:31, 23 December 2024)
- ML20002A789 + (21:00:37, 23 December 2024)
- 05000267/LER-1980-058, Forwards LER 80-058/03L-0 + (21:00:38, 23 December 2024)
- ML20002A786 + (21:00:40, 23 December 2024)
- 05000267/LER-1980-057-03, /03L-0:on 801004,PCRV Pressure Exceeded Penetration Interspace Pressure.Caused by Malfunction of Pressure Switch.Pcrv pump-up Terminated & Switch Linkage Retightened & Calibr + (21:00:41, 23 December 2024)
- 05000249/LER-1980-038-03, /03L-0:on 801021,crack Was Found on Reactor Water Cleanup Heat Exchanger Equalizing Line (3-1292-2-A).Cause Unknown.Leak Was Temporarily Patched + (21:00:43, 23 December 2024)
- 05000267/LER-1980-057, Forwards LER 80-057/03L-0 + (21:00:45, 23 December 2024)
- 05000317/LER-1980-060-03, /03L-0:on 801018,surveillance Testing Found RC-200 & RC-201 Lift Setpoints to Be 70 Psi & 56 Psi,Respectively, Above Max Tech Spec.Cause Not Stated.Setpoints Adjusted + (21:00:46, 23 December 2024)
- 05000317/LER-1980-060, Forwards LER 80-060/03L-0 + (21:00:48, 23 December 2024)
- 05000293/LER-1980-075-03, /03L-0:on 790222 & 0807,fire Detection Alarms & Master Solenoid Relay Found Inoperable.Caused by Defective Wiring & Moisture.Wiring Changed & Detector Dried + (21:00:50, 23 December 2024)
- 05000293/LER-1980-075, Forwards LER 80-075/03L-0 + (21:00:51, 23 December 2024)
- 05000348/LER-1980-062-03, /03L-0:on 801017,diesel Generator Failed to Reach Rated Voltage within Tech Spec Time Limit,Voltage Could Not Be Controlled from Emergency Power Board & B1F Sequencer Step Six Was Below Setpoint.Cause Not Determined + (21:00:53, 23 December 2024)
- W3P80-0158, Forwards Response to FSAR Question 11.1,Asymmetric Loads, Requested by NRC at 801001 Draft SER Review Meeting.Requests That NRC Provide Prompt Review.Comments Received by 801201 Will Be Included in Amend + (21:00:54, 23 December 2024)
- ML20002A773 + (21:00:57, 23 December 2024)