Forwards Environ Rept for Acceptance Review.Review Tentatively Scheduled to Begin in Feb 1981 W/Completion in Apr 1981.W/o Encl
ML20002A845
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 10/15/1980
From: Houston M
Office of Nuclear Reactor Regulation
To: Zussman R
ARGONNE NATIONAL LABORATORY
References
CON-FIN-A-2118 NUDOCS 8011210700
Download: ML20002A845 (1)


Text

-

{j].,j]l ${'

P~f"' Di r nem-DISTRIBUTION: /,. &

Docket Fi1 F S. Bajwa A. Schwencer NRC PDR W. Regan M. Service Local PDR B. Grenier M. Houston LB #2 File D. Eisenhut R. Tedesco Docket No. 50-440/441 OCT 151980

' Mr. R. Zussman Argonne National Laboratory 9700 South Cass Avenue Argonne, Illinois 60439

Dear Mr. Zussman:

In accordance with the ANL technical assistance program (FIN A 2118) with the Division of Engineering (NRR), we are forwarding six copies of the Perry Nuclear Power Plant, Units 1 and 2 Environmental Report (0L Stage) to you for the acceptance review. This review has been scheduled by the NRC contract administrator, Singh Bajwa, to tentatively begin in February, 1981 with completion in April, 1981.

If you have any questions concerning this matter, please contact Singh Bajwa (FTS 492-8440)or me (FTS 492-8507).

/, /

3 M. Dean Houston, Project Manager Licensing Branch No. 2 Division of Licensing cc: Dr. Philip F. Gustafson, Director Division of Environmental Impact Studies Argonne National Laboratory 9700 South Cass Avenue Argonne, Illinois 60439 80112107@

d\\,

LB d2/DL SAB:DE s LB #JfDQ" AD'AYtislNTLU"SBajwa ASchweNcer suaN.sMe)