Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PNO-I-90-001, on 890622,licensee Failed to Manually Trip Reactor When Required by Natl Circulation Test Procedure.On 900109,Confirmatory Action Ltr CAL-89-11 Commitments Found to Have Been Satisfactorily Completed by Licensee + (12:53:17, 23 December 2024)
- ML20005G236 + (12:53:18, 23 December 2024)
- PNO-II-90-004, on 900108,unit Experienced Reactor Trip When Both Main Feedwater Pumps Lost.Util Believes That Pump Slowed Down Due to Clogged Strainer in Control Oil Sys.Util Investigating Event & Evaluating Damage to Turbine + (12:53:20, 23 December 2024)
- ML20005G234 + (12:53:21, 23 December 2024)
- ML20005G232 + (12:53:23, 23 December 2024)
- PNO-II-90-002, on 900105,survey Instrument Check Source Containing 500 Uci Cs-137 Determined to Be Missing from Pan-American Hosp.State of Fl Dispatched Inspector to Investigate Matter.Investigation Continuing + (12:53:23, 23 December 2024)
- ML20005G231 + (12:53:25, 23 December 2024)
- ML20005G230 + (12:53:26, 23 December 2024)
- ML20005G229 + (12:53:27, 23 December 2024)
- ML20005G228 + (12:53:28, 23 December 2024)
- SNRC-1674, Reaffirms Commitment Not to Place Nuclear Fuel Back Into Facility Reactor W/O Prior NRC Approval & Advises of Preliminary Steps Taken to Lower Ongoing Costs + (12:53:29, 23 December 2024)
- ML20005G226 + (12:53:29, 23 December 2024)
- ML20005G224 + (12:53:31, 23 December 2024)
- ML20005G223 + (12:53:33, 23 December 2024)
- ML20005G222 + (12:53:34, 23 December 2024)
- ML20005G220 + (12:53:35, 23 December 2024)
- IR 05000245/1989023 + (12:54:48, 23 December 2024)
- ML20005G218 + (12:54:50, 23 December 2024)
- ML20005G217 + (12:54:51, 23 December 2024)
- ML20005G214 + (12:54:53, 23 December 2024)
- ML20005G213 + (12:54:53, 23 December 2024)
- IR 05000458/1989041 + (12:55:40, 23 December 2024)
- ML20005G208 + (12:55:42, 23 December 2024)
- 05000416/LER-1989-018, :on 891215,design Basis Review of Instrumentation Determined That 71 Devices,Classified as nonsafety-related,contained in Class 1E Circuits.Caused by Level of Control on Instrument Index + (12:55:43, 23 December 2024)
- IR 05000423/1989021 + (12:55:54, 23 December 2024)
- ML20005G204 + (12:55:56, 23 December 2024)
- ML20005G202 + (12:55:57, 23 December 2024)
- ML20005G201 + (12:55:58, 23 December 2024)
- ML20005G199 + (12:55:59, 23 December 2024)
- ML20005G197 + (12:56:00, 23 December 2024)
- ML20005G196 + (12:56:01, 23 December 2024)
- ML20005G194 + (12:56:02, 23 December 2024)
- ML20005G192 + (12:56:03, 23 December 2024)
- 05000278/LER-1989-009-03, :on 891207,HPCI Sys Declared Inoperable When Sys Failed to Start During Pump,Valve & Flow Surveillance Test.Caused by Loose Lock Nut on HPCI Oil Sys Relief Valve. Lead Seal Wire to Be Placed on Valve Caps + (12:56:09, 23 December 2024)
- IR 05000348/1989031 + (12:56:13, 23 December 2024)
- ML20005G187 + (12:56:15, 23 December 2024)
- ML20005G186 + (12:56:15, 23 December 2024)
- IR 05000062/1989004 + (12:56:18, 23 December 2024)
- IR 05000416/1989029 + (12:56:21, 23 December 2024)
- ML20005G183 + (12:56:23, 23 December 2024)
- ML20005G182 + (12:56:24, 23 December 2024)
- ML20005G180 + (12:56:25, 23 December 2024)
- ML20005G178 + (12:56:26, 23 December 2024)
- ML20005G176 + (12:56:27, 23 December 2024)
- ML20005G177 + (12:56:27, 23 December 2024)
- ML20005G175 + (12:56:28, 23 December 2024)
- ML20005G173 + (12:56:29, 23 December 2024)
- ML20005G172 + (12:56:30, 23 December 2024)
- ML20005G171 + (12:56:31, 23 December 2024)
- ML20005G170 + (12:56:32, 23 December 2024)
- ML20005G169 + (12:56:34, 23 December 2024)