Text

.

I'

.g 7

c r

APPENDIX A NOTICE OF VIOLATION Northeast Nuclear Energy Company Docket No.

50-245 Millstone Nuclear Power Station Unit 1 License No. DPR-21 During a routine resident inspection from September 6 through October 20, 1989, the following violation was identified.

In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions", 10 CFR Part 2, Appendix C, (Enforcement Policy), the violation is listed below.

Plant. surveillance technical specification 3.2, Protective Instrumenta-tion, Table 4.2.1, requires that a monthly coannel instrument functional test be performed for the " Isolation Condenser Isolation System Steam Line l

High Flow" and " Isolation Condenser Isolation System Condensate Line High l

Flow" systems.

Surveillance procedure SP-412L, Isolation Condenser Isolation Instrument Functional and Calibration Test, Revision 9, l

Change 1, provides the specific functional test procedure.

l Contrary to the above, on October ', 1989, the licensee determined that the above tests had not been performed at the required monthly interval by i

September 25, 1989 pursuant to technical specification 3.2 and procedure SP-412L.

Corrective actions taken for a recent licensee-identified violation, that

-also involved a technical specification surveillance not performed within 1

the prescribed time interval, were ineffective to prevent recurrence.

j

-This is a Severity Level IV Violation (Supplement I).

j Pursuant to the provisions of 10 CFR 2.201, Northeast Nuclear Energy Company is 4

hereby required to submit to this office, within thirty days of the date of the i

letter which transmitted this Notice, a written statement or explanation in reply, including:

(1) the corrective steps which have been taken and the results achieved; (2) corrective steps which will be taken to avoid further violations; and (3) the date when full compliance will be achieved. Where good cause is shown, consideration will be given to extending this response time.

7f L

l 1

9001180293 900103 PDR ADOCK 05000245 Q

PDC OFFICIAL RECORD COPY CIR MILL 89-23/22 - 0004.0.0 11/21/89