    • At'TIVITY CCiimiOL SYSTBLS

(

POSITION INDICATION SYSTEM SETIT4WW tiMITING CONDITION FOR OPERATION 3.1.3.4 All shutdown rods shall be FULLY WITHDRAWN.

(

ir APPLICABILIW: MODES 1*, and 2*#$

r l

ACTION:

l' With a maximum of one shutdown rod not FULLY WITHDRAWN, sacept for eurveillance testing pursuant to Specification 4.1.3 1.2, within one hour either:

FULLY WITHDRAW the rod, or, a.

b.

Declare the rod to be inoperable and apply Specification 3.1.3.1.

4

$L*RVEILLANCE REQUIREMENTS 4.1.3.4 Each shutdown rod shall be determined to be FULLY WITHDRAWN by use of the group demand counters, and verified by the analog rod position l

indicators ***

l Within 15 minutes prior to withdrawal of any rods in control banks a.

A, B, C, or D during an approach to reactor criticality, and l

b.

At_least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter.

  • See Special Test Exceptions 3.10.2 and 3.10.3
    • For power levels below 50% one hour thermal "so-A time" is permitted.

During this soak time, the a bolute value of ros action is limited to six steps.

@ Surveillance 4.1.3.4.a is applicable prior to withdrawing any control banks in preparation for startup (Mode 2).

  1. With Keff greater than or equal to 1.0 Note:

This page effective prior to startup from fifth refueling outage scheduled to begin March 1990. Letter dated Jan. 11, 1990.

SALEM - UNIT 2 3/4 1-19 Amendment No. 66 9001180276 900111 PDR ADOCK 05000311 p