Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000443/FIN-2017008-02 + (04:25:26, 22 February 2018)
- 05000373/FIN-2017009-01 + (04:25:28, 22 February 2018)
- 05000397/FIN-2017010-01 + (04:25:29, 22 February 2018)
- 05000397/FIN-2017010-02 + (04:25:30, 22 February 2018)
- 05000416/FIN-2017012-01 + (04:25:31, 22 February 2018)
- 05000416/FIN-2017012-02 + (04:25:31, 22 February 2018)
- ML18016A679 + (04:32:59, 22 February 2018)
- IR 05000335/1996012 + (04:52:54, 22 February 2018)
- IR 05000249/1978012 + (05:02:00, 22 February 2018)
- IR 05000331/1996004 + (05:05:31, 22 February 2018)
- IR 05000389/1995021 + (05:22:48, 22 February 2018)
- IR 05000389/1995005 + (05:23:32, 22 February 2018)
- IR 05000389/1994015 + (05:24:13, 22 February 2018)
- IR 05000335/1994011 + (05:24:23, 22 February 2018)
- IR 05000389/1992007 + (05:31:23, 22 February 2018)
- IR 05000335/1991018 + (05:34:04, 22 February 2018)
- IR 05000335/1990023 + (05:37:08, 22 February 2018)
- IR 05000389/1989010 + (05:41:15, 22 February 2018)
- IR 05000335/1987008 + (05:50:20, 22 February 2018)
- IR 05000335/1987004 + (05:50:33, 22 February 2018)
- IR 05000335/1980007 + (06:24:41, 22 February 2018)
- ML12083A132 + (11:46:57, 22 February 2018)
- ENS 53207 + (12:30:07, 22 February 2018)
- DNMS + (14:00:38, 22 February 2018)
- Internal Flooding + (21:30:53, 22 February 2018)
- Temporary Modification + (21:39:12, 22 February 2018)
- IR 05000389/1998011 + (02:19:27, 23 February 2018)
- Property:Followed by + (04:33:46, 23 February 2018)
- IR 05000389/1994010 + (04:38:23, 23 February 2018)
- IR 05000389/1993008 + (04:38:34, 23 February 2018)
- IR 05000389/1993005 + (04:38:41, 23 February 2018)
- IR 05000389/1992011 + (04:38:53, 23 February 2018)
- IR 05000389/1991011 + (04:39:35, 23 February 2018)
- RIS 2015-10, Applicability of ASME Code Case N-770-1 As Conditioned in 10 CFR 50.55A, Codes and Standards, to Branch Connection Butt Welds + (06:28:36, 23 February 2018)
- RIS 2015-01, Qualification Requirements for Bolt and Stud Non-Destructive Examinations (TAC Mf4148) + (06:58:54, 23 February 2018)
- RIS 2013-04, Content Specification And Shielding Evaluations For Type B Transportation Packages + (08:09:01, 23 February 2018)
- RIS 2005-01, Rev 1, Changes To Notice Of Enforcement Discretion Process And Staff Guidance + (08:46:52, 23 February 2018)
- RIS 2012-03, Reintegration of Security Into The Reactor Oversight Process Assessment Program + (09:12:36, 23 February 2018)
- RIS 2012-02, Insights Into Recent License Renewal Application Consistency With The Generic Aging Lessons Learned Report + (09:22:37, 23 February 2018)
- RIS 2012-11, NRC Staff Position on Applying Boiling Water Reactor Technical Specification Requirements During Operations With a Potential For Draining the Reactor Vessel + (09:24:35, 23 February 2018)
- RIS 2012-09, Endorsement of Nuclear Energy Institute Guidance Using An Alternative Method to Manage Cumulative Fatigue At Nuclear Power Reactor Sites + (09:27:36, 23 February 2018)
- RIS 2002-12I, Transportation of Spent Nuclear Fuel Greater Than 100 Grams + (09:40:20, 23 February 2018)
- RIS 2011-09, Available Resources Associated With Extended Storage Of Low-Level Radioactive Waste + (09:45:13, 23 February 2018)
- RIS 2011-14, Metal Fatigue Analysis Performed By Computer Software + (09:45:45, 23 February 2018)
- RIS 2011-10, Request For Licensees To Consider The Nrc'S Public Website For Significant Enforcement Actions When Evaluating Individuals For Employment + (09:52:37, 23 February 2018)
- RIS 2011-01, NRC Policy on Release of Iodine-131 Therapy Patients Under 10 CFR 35.75 to Locations Other Than Private Residences. + (10:11:29, 23 February 2018)
- RIS 2010-10, Withdrawn NRC Regulatory Issue Summary 2010-10 Process For Scheduling Acceptance Reviews Of New Reactor Licensing Applications And Process For Determining Budget Needs For Fiscal Year 2013 + (10:15:17, 23 February 2018)
- RIS 2010-07, Regulatory Requirements For Application of Weld Overlays and Other Mitigation Techniques in Piping Systems Approved for Leak-Before-Break + (10:22:27, 23 February 2018)
- RIS 2010-06, Inservice Inspection And Testing Requirements Of Dynamic Restraints (SNUBBERS) + (10:22:48, 23 February 2018)
- RIS 2009-12, U.S. Nuclear Regulatory Commission Regulatory Issue Summary 2009-Uranium Recovery Policy Regarding Pre-Licensing Construction Activities At Proposed, Unlicensed Uranium Recovery Facilities + (10:26:53, 23 February 2018)
- RIS 2009-05, Uranium Recovery Policy Regarding: (1) The Process for Scheduling Licensing Reviews of Application for New Uranium Recovery Facilities and (2) the Restoration of Groundwater at Licensed Uranium In Situ Recovery ... + (10:34:01, 23 February 2018)