List of results
- AECM-81-232, First Status Rept on Potentially Reportable Deficiency Re Failure of Test Connection Pipe Off HPCS Injection Line on Containment Side of Injection Valve,Initially Reported on 810527.Investigation Ongoing.Final Rept Expected by 811029 + (13:10:33, 21 December 2024)
- 05000369/LER-1981-080, Forwards LER 81-080/03L-0.Detailed Event Analysis Encl + (13:10:35, 21 December 2024)
- ML20009G066 + (13:10:36, 21 December 2024)
- IR 05000412/1981005 + (13:10:38, 21 December 2024)
- BSEP-81-0945, Ro:On 810506,investigation on RHR Heat Exchangers Determined That B Heat Exchanger Baffle Was Deformed at Bottom Allowing Bypass Flow.Cause Being Evaluated.Repairs on 2B RHR Heat Exchanger in Progress + (13:10:39, 21 December 2024)
- ML20009G064 + (13:10:39, 21 December 2024)
- BSEP-81-1271, Confirms 810625 Conversation Between CS Bohanan & R Butcher Re United Engineers & Constructors,Inc Notification That 38 Control Rod Driveline Gang Pipe Supports Would Fail in as-built Condition During Design Seismic Event + (13:10:41, 21 December 2024)
- ML20009G061 + (13:10:43, 21 December 2024)
- ML20009G058 + (13:10:44, 21 December 2024)
- ML20009G057 + (13:10:44, 21 December 2024)
- ML20009G054 + (13:10:47, 21 December 2024)
- ML20009G053 + (13:10:48, 21 December 2024)
- ML20009G052 + (13:10:48, 21 December 2024)
- 05000259/LER-1981-031-03, /03L-0:on 810610,discovered That Eight Level Switches Would Not Operate During Maint on Scram Accumulator.Caused by Excessive Amounts of Substance on Switch Float & Guide Stem,Causing Float to Stick + (13:10:51, 21 December 2024)
- ML20009G046 + (13:10:53, 21 December 2024)
- 05000259/LER-1981-031, Forwards LER 81-031/03L-0 + (13:10:54, 21 December 2024)
- ML20009G043 + (13:10:55, 21 December 2024)
- 05000369/LER-1981-091-03, /03L-0:on 810530,peak Shock Annuciator Amber Light Observed On.Caused by Light Reed Switch from Triaxial response-spectrum Recorder Making Contact.Reed Switch Adjusted,Tested & Delared Operable + (13:10:56, 21 December 2024)
- L-81-316, Final Deficiency Rept Re Protuberance on Local Control Station Switches Supplied by Gould Rundel,Initially Reported 810625.Purchase Spec Revised to Specify Contact Maint During Position Change + (13:10:57, 21 December 2024)
- ML20009G040 + (13:10:59, 21 December 2024)
- 05000338/LER-1981-034-03, /03L-0:on 810627,quadrant Power Tilt Ratio Indicated Tilt in Excess of 1.02 During Power Escalation. Caused by Control Rods Being Inserted Lower in Core than Desired While Increasing Reactor Power to 100% + (13:11:00, 21 December 2024)
- 05000369/LER-1981-091, Forwards LER 81-091/03L-0.Detailed Event Analysis Encl + (13:11:02, 21 December 2024)
- 05000369/LER-1981-097-03, /03L-0:on 810612,in Mode 5,routine Surveillance Discovered That Quantity of Fire Detection Equipment Installed in Five Fire Zones Did Not Comply W/Tech Specs. Caused by Typographical Error & Incorrect Blueprints + (13:11:04, 21 December 2024)
- 05000338/LER-1981-034, Forwards LER 81-034/03L-0 + (13:11:05, 21 December 2024)
- 05000327/LER-1981-067-01, /01T-0:on 810626,while in Mode 4,site Evaluation Identified That Steam Generator Level Transmitters 1-LT-3-148,156,164,172,174 & 175 Would Fail During Loca. Caused by Incorrect Insulating Sleeving + (13:11:07, 21 December 2024)
- 05000369/LER-1981-097, Forwards LER 81-097/03L-0.Detailed Event Analysis Encl + (13:11:09, 21 December 2024)
- 05000369/LER-1981-096-01, /01T-0:on 810624,Type C Leak Test Not Performed as Required for Bypass Leakage Paths on Penetration Used for Ice Loading.Caused by Not Being Listed in FSAR as Requiring Leak Test.Test Performed Satisfactorily + (13:11:11, 21 December 2024)
- 05000369/LER-1981-096, Forwards LER 81-096/01T-0.Detailed Event Analysis Encl + (13:11:14, 21 December 2024)
- 05000327/LER-1981-067, Forwards LER 81-067/01T-0 + (13:11:16, 21 December 2024)
- 05000369/LER-1981-078-03, /03L-0:on 810507,reset Pushbutton on Pressurizer Safety Injection Train B Pressed Instead of Safety Injection Reset Train 1B Button.Caused by Personnel Error.Different Method to Be Used to Reset Valve Timing Computer Program + (13:11:18, 21 December 2024)
- 05000369/LER-1981-078, Forwards LER 81-078/03L-0.Detailed Event Analysis Encl + (13:11:20, 21 December 2024)
- 05000261/LER-1981-014-03, /03L-0:on 810523,discovered That Hagan Summator PM-446B Had Shifted Nonconservatively Approx 3%.Caused by Failure of Filter Capacitor Due to Normal Wear.Faulty Capacitor Replaced + (13:11:22, 21 December 2024)
- 05000369/LER-1981-092-03, /03L-0:on 810530,auxiliary Feedwater Flow Rate Instrumentation Pegged High.Caused by Failed Transmitters. Transmitters Replaced & Calibr.Power Supply Removed & Will Be Replaced + (13:11:24, 21 December 2024)
- 05000369/LER-1981-092, Forwards LER 81-092/03L-0.Detailed Event Analysis Encl + (13:11:25, 21 December 2024)
- 05000261/LER-1981-014, Forwards LER 81-014/03L-0 + (13:11:27, 21 December 2024)
- 05000369/LER-1981-033-01, /01T-0:on 810403,discovered Ductwork Inside of Inside Isolation Valves for Containment Purge Sys Not Constructed of 10-gauge Stainless Steel Per Fsar.Caused by Design Drawing Details Not Specifying Matl + (13:11:29, 21 December 2024)
- 05000260/LER-1981-027-03, /03L-0:on 810604,during Mod Outage,Switch 2-PdIS-75-56 Was Found Outside Tech Spec Limits.Caused by Setpoint Drift of Barton Model 288 D/P Switch.Switch Recalibr + (13:11:30, 21 December 2024)
- 05000348/LER-1981-040-03, /03L-0:on 810529,diesel Generator 1-2A Could Not auto-start Due to Mode Selector Switch Being Placed in Mode 3.Caused by Generator Being Shut Down for Cleaning. Switch Returned to Mode 1 + (13:11:32, 21 December 2024)
- 05000369/LER-1981-033, Forwards LER 81-033/01T-0 + (13:11:33, 21 December 2024)
- ML20009G005 + (13:11:34, 21 December 2024)
- 05000311/LER-1981-040-03, /03L-0:on 810609,investigation Revealed Leak in RCS Chemical & Vol Control Sys at Weld for Vent Valve 2CV396.Caused by Excess Vibration & Pressure Transient.Valve Removed & Vent Line Capped + (13:11:36, 21 December 2024)
- IR 05000029/1981011 + (13:11:42, 21 December 2024)
- 05000311/LER-1981-040, Forwards LER 81-040/03L-0.Detailed Event Analysis Encl + (13:11:44, 21 December 2024)
- 05000260/LER-1981-027, Forwards LER 81-027/03L-0 + (13:11:46, 21 December 2024)
- ML20009F997 + (13:11:48, 21 December 2024)
- 05000327/LER-1981-064-03, /03L-0:on 810603,lower Containment Radiation Monitor 1-RM-90-106 Was Removed from Svc.Caused by Monitor Sample Pump Circuit Breaker Tripping on Overcurrent.Breaker Reset + (13:11:49, 21 December 2024)
- 05000250/LER-1981-013-01, /01T-0:on 810710,void Discovered in Concrete Immediately Below Equipment Hatch Barrel.Caused by Concrete Pour.Engineering Review Underway to Determine Method of Repair + (13:11:51, 21 December 2024)
- 05000327/LER-1981-064, Forwards LER 81-064/03L-0 + (13:11:53, 21 December 2024)
- 05000369/LER-1981-104-03, /03L-0:on 810626,operability of EMF-36 Low & High Range Detectors Not Checked During Required Surveillance Following Entry from Mode 4 to Mode 5.Caused by Inadvertent Deletion of Requirement in 810616 Procedure Revision + (13:11:57, 21 December 2024)
- 05000348/LER-1981-040, Forwards LER 81-040/03L-0 + (13:11:59, 21 December 2024)
- 05000338/LER-1981-060-03, /03L-0:on 810623,removed 15 Fire Hose Stations from Svc Auxiliary Bldg.Caused by Draining of Hose Stations to Allow tie-in to Be Made for New Piping Sys.After Mod Completion,Stations Returned to Svc + (13:12:01, 21 December 2024)