Text
F
.
.
e
j? $p Tt2g[o* *
UNITED STATES
NUCLEAR REGULATORY COMMISSION
- g
{
3e(
g
REGION 1
- 's M
r: C
631 PARK AVENUE
[
KING OP PRUSSIA, PENNSYLVANIA 19406
A
.....
'
JUL 16198t'
Docket No. 50-29
Yankee Atomic Electric Company
ATTN: Mr. James A. Kay
Senior Engineer Licensing
1671 Worcester Road
Framingham, Massachusetts 01701
Gentlemen:
Subject:
Inspection 50-29/81-11
This refers to the routine safety inspection conducted by Mr. T. Foley of this
office on June 1 - June 30,1981, at Yankee Rowe Power Station, (Yankee Rowe),
Rowe, Massachusetts, of activities authorized by NRC License No. DPR-3 and to
the discussions of our findings held by Mr. Foley with Mr. N. St. Laurent of
your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
i
and representative records, interviews with personnel, and observations by the
inspector.
Gur inspector also verified the steps you have taken to correct the items of
noncompliance brought to your attention in letters dated March 23 and April 13,
1981. We have no further questions regarding your ntion at this time.
Within the scope of this inspection, no items of noncompliance were observed.
.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed inspection report will be placed in the NRC's Public
l
Document Room.
If this report contains any information that you (or your contractors)
believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary
l
that you (a) notify this office by telephone within ten (10) days from the date
l
of this letter of your intention to file a request for withholding; and (b)
'
submit within 25 days from the date of this letter a written application to this
office to withhold such information. Consistent with section 2.790(b)(1), any
i
such application must be accompanied by an affidavit executed by the owner of
the information which identifies the document or part sought to be withheld, and
which contains a full statement of the reasons on the basis which it is claimed
that the information should be withheld from public disclosure.
This section
further requires the statement to address with specificity the considerations
listed in 10 CFR 2.790(b)(4). The information sought to be withheld shall be
3f01
s
/f
.
f
8108030225 810716
PDR ADOCK 05000029
G
.-
F
.
,
.
Yankee Atomic Electric Company
2
JUL 1 6 E01
incorporated as far as possible into a separate part cf the affidavit.
If we do
not hear from you in this regard within the specified periods noted above, the
report will be placed in the Public Document Room.
The telephone notification
of your intent to request withholding, or any request for an extension of the 10
day period which you believe necessary, should be made to the Supervisor, Files,
Mail and Records, USNRC Region I, at (215) 337-5223.
No reply to this letter is required; however, if you have any questions concerning
this inspection, we will be pleased to discuss them with you.
Sincerely,
m
_
- _ '
_ - _ ,
_
.d
. Brunner, Chief, Projects
Br nch #1, Division of Resident
nd Project Inspection
Enclosure: Office of Inspection and Enforcement Inspection
Report Number 50-29/81-11
cc w/ encl:
H. Autio, Plant Superintendent
J. E. Tribble, President