Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000324/LER-1990-012-02, :on 900830,Unit 2 Reactor Scram Occurred During Reactor Startup.Investigation Continuing.Level Recovered W/O Need for Safety Sys Injection & Unit Designed for Level Transient from Full Power + (22:48:20, 20 December 2024)
- 1CAN099007, Application for Amend to License DPR-51,reducing Heat Rate at Axial Locations Between 4 Ft & 8 Ft + (22:48:24, 20 December 2024)
- ML20028H041 + (22:48:24, 20 December 2024)
- ML20028H038 + (22:48:30, 20 December 2024)
- ML20028H037 + (22:48:31, 20 December 2024)
- TAC:74907 + (22:48:31, 20 December 2024)
- ML20028H036 + (22:48:32, 20 December 2024)
- TAC:74906 + (22:48:33, 20 December 2024)
- ML20028H035 + (22:48:34, 20 December 2024)
- ML20028H034 + (22:48:34, 20 December 2024)
- 05000327/LER-1990-019, :on 900828,failure to Update P-250 Plant Computer Constants Resulted in Axial Flux Difference.Caused by Inadequate Procedures & Inappropriate Personnel Actions. Procedure 0-PI-NXX-092-001.0 Revised + (22:48:36, 20 December 2024)
- 05000266/LER-1990-011, :on 900829,low Net Positive Suction Head to Containment Spray Pumps W/Eccs in Recirculation Mode Occurred.Caused by Procedural Deficiency.Temporary Procedure Changes Initiated + (22:48:38, 20 December 2024)
- PNO-V-90-039, on 900925,reactor Shut Down Due to Inability to Maintain Digital Electrohydraulic Control Sys.Plant Manager Directed Level I Root Cause Analysis.Resident Inspector Will Follow Licensee Resolution of Issue + (22:48:40, 20 December 2024)
- ML20028H027 + (22:48:42, 20 December 2024)
- ML20028H025 + (22:48:43, 20 December 2024)
- 05000322/LER-1990-007, :on 900907,unplanned Actuation of ESF Sys Occurred During I&C Surveillance Test.Caused by Inadequate procedure.SP44.650.16 Revised to Require That Leads Lifted & Individually Separated + (22:48:44, 20 December 2024)
- ML20028H022 + (22:48:46, 20 December 2024)
- ML20028H020 + (22:48:47, 20 December 2024)
- ML20028H018 + (22:48:48, 20 December 2024)
- ML20028H017 + (22:48:49, 20 December 2024)
- 05000341/LER-1990-007, :on 900829,control Ctr Ventilation Shifted to Recirculation Due to Blown Fuse.Caused by Design Deficiency in Div 1 & 2 Radiation Monitor Trip Circuitry.Design Change Implemented to Eliminate Trip Relay Logic + (22:48:51, 20 December 2024)
- ML20028H014 + (22:49:01, 20 December 2024)
- ML20028H012 + (22:49:02, 20 December 2024)
- ML20028H011 + (22:49:02, 20 December 2024)
- ML20028H007 + (22:49:04, 20 December 2024)
- ML20028H005 + (22:49:05, 20 December 2024)
- ML20028H004 + (22:49:06, 20 December 2024)
- ML20028H002 + (22:49:07, 20 December 2024)
- ML20028H000 + (22:49:08, 20 December 2024)
- ML20028H001 + (22:49:08, 20 December 2024)
- ML20028G999 + (22:49:09, 20 December 2024)
- ML20028G996 + (22:49:14, 20 December 2024)
- TAC:76424 + (22:49:14, 20 December 2024)
- ML20028G994 + (22:49:15, 20 December 2024)
- ML20028G993 + (22:49:16, 20 December 2024)
- ML20028G990 + (22:49:17, 20 December 2024)
- ML20028G992 + (22:49:17, 20 December 2024)
- ML20028G989 + (22:49:18, 20 December 2024)
- ML20028G987 + (22:49:19, 20 December 2024)
- ML20028G985 + (22:49:20, 20 December 2024)
- ML20028G982 + (22:49:21, 20 December 2024)
- ML20028G984 + (22:49:21, 20 December 2024)
- ML20028G979 + (22:49:23, 20 December 2024)
- ML20028G980 + (22:49:23, 20 December 2024)
- ML20028G976 + (22:49:24, 20 December 2024)
- 05000293/LER-1989-036, :on 891122,determined That HPCI Sys Inoperable Due to Inoperable Gland Seal Condenser Blower Motor.Caused by age-related Wear of Motor.Blower Motor Replaced & Blower Tested W/Satisfactory Results + (22:49:25, 20 December 2024)
- ML20028G972 + (22:49:26, 20 December 2024)
- ML20028G971 + (22:49:27, 20 December 2024)
- ML20028G970 + (22:49:28, 20 December 2024)
- ML20028G966 + (22:49:32, 20 December 2024)
- ML20028G964 + (22:49:33, 20 December 2024)