Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20029B204 + (22:20:33, 20 December 2024)
- ML20029B202 + (22:20:34, 20 December 2024)
- ML20029B201 + (22:20:35, 20 December 2024)
- TAC:67014 + (22:20:36, 20 December 2024)
- ML20029B199 + (22:20:38, 20 December 2024)
- ML20029B198 + (22:20:39, 20 December 2024)
- ML20029B197 + (22:20:39, 20 December 2024)
- ML20029B193 + (22:20:40, 20 December 2024)
- ML20029B195 + (22:20:40, 20 December 2024)
- U-601798, Rev to RO Re Valid Failure of Div II Diesel Generator During Surveillance Testing on 910106.Caused by Failure of A-3 Relay Tachometer Due to Broken Wire.Caution Added to Vendor Manual Re Bench Testing Relay + (22:20:41, 20 December 2024)
- ML20029B192 + (22:20:41, 20 December 2024)
- ML20029B189 + (22:20:44, 20 December 2024)
- JAFP-91-0137, Effluent & Waste Disposal Semiannual Rept Jul-Dec 1990 + (22:20:46, 20 December 2024)
- PY-CEI-NRR-1301, 1990 Annual Rept + (22:20:48, 20 December 2024)
- ELV-02579, Responds to Violations Noted in Insp Repts 50-424/90-32 & 50-425/90-32 on 901222-910118.Corrective Actions:Standing Order Issued to Implement Administrative Controls for Proteus Computer Operations + (22:20:50, 20 December 2024)
- ML20029B185 + (22:20:52, 20 December 2024)
- 05000295/LER-1991-001-08, :on 910129,TS Limiting Condition of Operation 3.0.3 Entered Due to Untested Containment Penetrations P-76 & P-80.Caused by Misinterpretation of Tss. Piping,Flanges & Relief Valves Visually Inspected + (22:20:54, 20 December 2024)
- ML20029B182 + (22:20:58, 20 December 2024)
- ML20029B180 + (22:20:59, 20 December 2024)
- ML20029B179 + (22:21:00, 20 December 2024)
- ML20029B178 + (22:21:01, 20 December 2024)
- ML20029B177 + (22:21:02, 20 December 2024)
- ML20029B175 + (22:21:02, 20 December 2024)
- ML20029B173 + (22:21:04, 20 December 2024)
- ML20029B174 + (22:21:04, 20 December 2024)
- ML20029B171 + (22:21:05, 20 December 2024)
- ML20029B169 + (22:21:06, 20 December 2024)
- ML20029B168 + (22:21:06, 20 December 2024)
- BECO-91-023, Suppls 901114 Response to NRC Bulletin 90-001, Loss of Fill Oil in Transmitters Mfg by Rosemount. Confirms That Low Condenser Vacuum Scram Transmitters Not Credited in Any Safety Analyses,Per 910117 Telcon W/Nrc + (22:21:07, 20 December 2024)
- ML20029B166 + (22:21:08, 20 December 2024)
- 3F0291-05, Application for Amend to License DPR-72,consisting of Proposed Tech Spec Change Request 184 Re One Time Extension to 24 Month Surveillance Interval for Performing Eddy Current Testing & Evaluation Based on Previous Test Results + (22:21:09, 20 December 2024)
- ML20029B163 + (22:21:11, 20 December 2024)
- ML20029B162 + (22:21:13, 20 December 2024)
- ML20029B161 + (22:21:14, 20 December 2024)
- ML20029B160 + (22:21:16, 20 December 2024)
- ML20029B159 + (22:21:17, 20 December 2024)
- 3F0291-06, Annual Rept of Personnel Exposure,Reactor Vessel Surveillance Capsules,Challenges to Pressurizer Relief & Safety Valves & Facility Changes,Tests & Experiments + (22:21:18, 20 December 2024)
- PY-CEI-NRR-1320, Revised Emergency Public Info Organization Instructions Manual + (22:21:20, 20 December 2024)
- ML20029B155 + (22:21:22, 20 December 2024)
- ML20029B156 + (22:21:22, 20 December 2024)
- ML20029B154 + (22:21:23, 20 December 2024)
- ML20029B153 + (22:21:23, 20 December 2024)
- ML20029B150 + (22:21:24, 20 December 2024)
- ML20029B152 + (22:21:24, 20 December 2024)
- ML20029B145 + (22:21:26, 20 December 2024)
- ML20029B144 + (22:21:26, 20 December 2024)
- ML20029B142 + (22:21:30, 20 December 2024)
- ML20029B141 + (22:21:31, 20 December 2024)
- ML20029B139 + (22:21:32, 20 December 2024)
- TAC:79812 + (22:21:32, 20 December 2024)
- ML20029B138 + (22:21:34, 20 December 2024)
- ML20029B135 + (22:21:34, 20 December 2024)