Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20031E722 + (18:32:02, 20 December 2024)
- ML20031E724 + (18:32:02, 20 December 2024)
- ML20031E720 + (18:32:05, 20 December 2024)
- 05000312/LER-1981-046, Forwards LER 81-046/03L-0.Detailed Event Analysis Submitted + (18:32:07, 20 December 2024)
- ML20031E716 + (18:32:08, 20 December 2024)
- ML20031E715 + (18:32:10, 20 December 2024)
- ML20031E714 + (18:32:11, 20 December 2024)
- ML20031E712 + (18:32:12, 20 December 2024)
- ML20031E710 + (18:32:13, 20 December 2024)
- ML20031E709 + (18:32:14, 20 December 2024)
- ML20031E708 + (18:32:15, 20 December 2024)
- IR 05000406/1981001 + (18:32:16, 20 December 2024)
- ML20031E705 + (18:32:18, 20 December 2024)
- ML20031E704 + (18:32:19, 20 December 2024)
- ML20031E703 + (18:32:20, 20 December 2024)
- ML20031E702 + (18:32:21, 20 December 2024)
- ML20031E701 + (18:32:22, 20 December 2024)
- ML20031E700 + (18:32:24, 20 December 2024)
- RS-20-011, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors + (18:32:25, 20 December 2024)
- ML20031E698 + (18:32:27, 20 December 2024)
- IR 05000483/2019004 + (18:32:32, 20 December 2024)
- 05000296/LER-1981-049-03, /03L-0:on 810913,while Performing Redundant Start Test,Diesel Generator 3C Redundant Start Relay PFD1 Time Delay Exceeded 3.2-s.Caused by Relay Drifting Out of Tolerance.Pneumatic Time Delay Relay Successfully Tested + (18:32:33, 20 December 2024)
- ML20031E692 + (18:32:35, 20 December 2024)
- ML20031E689 + (18:32:36, 20 December 2024)
- ML20031E687 + (18:32:37, 20 December 2024)
- 05000296/LER-1981-049, Forwards LER 81-049/03L-0 + (18:32:39, 20 December 2024)
- ML20031E681 + (18:32:40, 20 December 2024)
- ML20031E679 + (18:32:41, 20 December 2024)
- ML20031E674 + (18:32:42, 20 December 2024)
- 05000261/LER-1981-021-01, /01T-0:on 810925,w/unit at 50% Power,Group 2 Control Bank D Control Rods Were Inoperable & Reactor Shutdown Commenced.Caused by Faulty Input/Output Amplifier Printed Circuit Card in Control Rod Logic Cabinet + (18:32:44, 20 December 2024)
- ML20031E670 + (18:32:46, 20 December 2024)
- ML20031E671 + (18:32:46, 20 December 2024)
- ND-20-0092, Revision to Request for License Amendment: Removal of the Preoperational Passive Residual Heat Removal Heat Exchanger Natural Circulation Test (LAR-19-017R1) + (18:32:47, 20 December 2024)
- 05000261/LER-1981-021, Forwards LER 81-021/01T-0 + (18:32:49, 20 December 2024)
- ML20031E660 + (18:32:51, 20 December 2024)
- ML20031E658 + (18:32:53, 20 December 2024)
- ML20031E657 + (18:32:54, 20 December 2024)
- ML20031E655 + (18:32:55, 20 December 2024)
- ML20031E654 + (18:32:56, 20 December 2024)
- ML20031E653 + (18:32:57, 20 December 2024)
- ML20031E651 + (18:32:58, 20 December 2024)
- ML20031E649 + (18:32:59, 20 December 2024)
- ML20031E648 + (18:33:00, 20 December 2024)
- ML20031E647 + (18:33:01, 20 December 2024)
- L-81-443, Final Deficiency Rept Re Linear Indication Observed in Reactor Coolant 3/4-inch Schedule 160,304 SS Pipe,Initially Reported on 810909.Linear Indication Determined to Be Hot Mill Seam.Pipe Replaced.Incident Determined Not Reportable + (18:33:03, 20 December 2024)
- ML20031E640 + (18:33:06, 20 December 2024)
- ML20031E639 + (18:33:07, 20 December 2024)
- ML20031E638 + (18:33:08, 20 December 2024)
- ML20031E635 + (18:33:10, 20 December 2024)
- ML20031E633 + (18:33:11, 20 December 2024)
- ML20031E629 + (18:33:12, 20 December 2024)