Discusses NRC Approach to Initiation of Timely Review of Fire Protection Plan,In Response to Util .Meeting W/Util,Scheduled for 810807 in Bethesda,Md,Will Include Discussion of Open Items Resulting from Evaluation
ML20031E714
Person / Time
Site: Midland
Issue date: 09/24/1981
From: Adensam E
Office of Nuclear Reactor Regulation
To: Jackie Cook
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
References
NUDOCS 8110160342
Download: ML20031E714 (3)


Text

}

s

,,ir j

c r

SEP 2 41531

,g%m f(OEMM& gdC Docket Nos.:

50-329/330 1*r. J. W. Cook Vice President 84 12 C

Consumers Power Conpany gJ 1945 West Parnall Road

\\,

~

f Jackson, Michigan 4920!

4 to

(*

Dear f'r. Cook:

Subj ect:

Midland Project - Fire Protection Plan Review This letter responds in part to your letter to H. R. Denton dated August 6,1931 on the sa"le subject and docuaents agree 1ents reached nutually witn your staff during the past week in regards to the general approach to reviewing the Midland Fire Protection Plan. The NRC staff agrees with the importance of initiating timel.7 review of your Fire Protection Plan. Revision 35 to the tiidland FSAR was received in July 1981 anc, /omptly disseninated to the cognizant technical reviewers. The review of this document, as well as FSAR Appendix 9A and Section 9.5.1, is under way with a target date of Novenber 6,1981 for prep-aration of a draft Safety Evaluation Report (SER) and Open Items List. A meeting with your staff has been scheduled for October 7,1981 at our Bethesda office to discuss the open items resulting from our evaluation. We will attempt at this time to resolve any misunderstandings relative to the applica-bility to your plant of 10 CFR 50-Appendix R, control room / control cabinet fire definitions and positions and timing of the overall site walkdown of the fire protection system relative to construction progress.

As the result of discussions with your staff, we do not feel that there exists any major disagrement insofar as the need for an e'fective fire protection plan and the process by which that plan will be anproved by the NRC. Our Cheaical Engineering Branch has the lead technical responsibility for this review and has indicated a willingness to expend tk effort necessary to conduct the review in a timely manner and work together with Consu1ers Power Co:npany to finalize the requirements. Ibwever, as stated in our letter dated June 29, 1981, exceptions and alternative positions to Appendix R and BTP ASB 9.5.1 will become conditions of the operating license. Our technical reviewers also maintain the position that the final site walkdawn of the fire protection system cannot be aopropriately conducted until at least 90% of the total required wire and cable is in place.

Prelininary site visits will be scheduled, if appropriate, to aid the technical reviewers in their review and in the resolution of open iteas.

kf)f0 42 8109p4 F

K 05000329 PDR DATEf N""o" 3'8 "so' nam o2a OFFICIAL RECORD COPY WSW M-329 eh

e P

/*

..d 4-A J. W. Cook The staff considers that, with the necessary cooperation fron: Consumers Poser Company, tne approacli discussed above will support your projected construction completion date for the liidland Plant.

Sincerely, Elinor G. Adensai.;, Acting Branch Chief Licensing Branch f/4 Division of Licensing cc: See next page DISTRIBUTION Docket File LB#4 r/f DEisenhut EAdensam MDuncan DHood SHanauer RTedesco RVollmer TMurley RMattson RHartfield, MPA 0 ELD OIE (3)

VBenaroya PCheck RFerguson RAnand bcc: L/PDR NSIC TIC TERA ACRS (16)

% k u d 9{ 2'lEl n

omccpl LB#4 DL:LB 4 dLfL AD:

E,

^

,EAde,nsam rte'det,co

,droy,a, cu:mut)

DHo M7 can

..../..;). 3../.819/ 7..,)../81

.. /.L/../81

....$.... 81.

. /.5.../81 our) 9 9

9 9

' * ' '98c-32n24 NRC FORM 318 810< UOt t4RCM O2 4 0 OFFICIAL RECORD COPY

MIDLAND Mr. J. W. Cook Vice President Consumers Power Company 1945 West Parnall Road Jackson, Michigan 49201 cc: Michael I. Miller, Esq.

Mr. Don van Farrowe, Chief Ronald G. Zamarin, Esq.

Division of Radiological Health Alan S. Farnell, Esq.

Department of Public Health Isham, Lincoln & Beale P.O. Box 33035 Suite 4200 Lansing, Michigan 48909 1 First National Plaza Chicago, Illinois 60603 William J. Scanlon, Esq.

2034 Pauline Boulevard James E. Brunner, Esq.

Ann Arbor, Michigan 48103 Consumers Power Company 212 West Michigan Aver.ue U.S. Nuclear Regulatcry Commission Jackson, Michigan 49201 Resident Inspectors Office Route 7 Myron M. Cherry, Esq.

Midland, Michigan 48640 1 IBM Plaza Chicago, Illinois 60611 Ms. Barbara Stamiris 5795 N. River Ms. Mary Sinclair Freeland, Michigan 48623

~

5711 Summarset Drive Midland, Michigan 48640 Mr. Paul A. Perry, Secretary Consumers Power Company Stewart H. Freeman 212 W. Michigan Avenue Assistant Attorney General Jackson, Michigan 49201 State of Michigan Environmental Protection Division Mr. Walt Apley l

720 Law Building c/o Mr. Max Clausen l

Lansing, Michigan 48913 Battelle Pacific North West Labs (PNWL) l Battelle Blvd.

Mr. Wendell Marshall SIGMA IV Building Route 10 Richland, Washington 99352 Midland, Michigan 48640 Mr. Steve Gadler 2120 Carter Avenue St. Paul, Minnesota 55108 l

l

~..

.. _ _ _.