Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20034G011 + (11:59:28, 20 December 2024)
- IR 05000413/1993003 + (11:59:32, 20 December 2024)
- PY-CEI-NRR-1577, Forwards Request for Two Exemptions from 10CFR50.12 Type a Containment Integrated Leakage Testing Re Removal of Restriction That ILRT Be Stopped If Potentially Excessive Leakage Determined & Revising LCO to Specify La + (11:59:34, 20 December 2024)
- ML20034G007 + (11:59:36, 20 December 2024)
- ML20034G005 + (11:59:37, 20 December 2024)
- ML20034G001 + (11:59:38, 20 December 2024)
- ML20034F999 + (11:59:39, 20 December 2024)
- ML20034F998 + (11:59:41, 20 December 2024)
- ML20034F996 + (11:59:42, 20 December 2024)
- 05000259/LER-1993-001-02, :on 930110,RB Crane SI Could Not Be Verified to Have Been Performed,Due to Ambiguous or Missing Instruction. Operations Personnel Will Be Instructed to Verify Latest SI Performance Through Work Control + (11:59:43, 20 December 2024)
- ML20034F993 + (11:59:45, 20 December 2024)
- ML20034F991 + (11:59:46, 20 December 2024)
- ML20034F987 + (11:59:47, 20 December 2024)
- 05000263/LER-1993-001-02, :on 930129,potential Single Failure Identified That Could Affect Both Trains of Sbgts.Caused by Desing Error.Mod Will Be Completed to Eliminate Potential Single Failure of Electric Room Heater + (11:59:49, 20 December 2024)
- RC-93-0055, Interim Part 21 Rept Re Anchor Bolts of Three Storage Tanks Found Corroded by Water & Debris Entering Anchor Bolt Sleeves.Initially Reported on 921016 & 1103.Reportability Evaluation Will Be Completed by 930716 + (11:59:52, 20 December 2024)
- ML20034F975 + (11:59:54, 20 December 2024)
- ML20034F974 + (11:59:56, 20 December 2024)
- ML20034F970 + (11:59:57, 20 December 2024)
- ML20034F968 + (11:59:59, 20 December 2024)
- ML20034F967 + (12:00:00, 20 December 2024)
- ML20034F963 + (12:00:01, 20 December 2024)
- PY-CEI-NRR-1576, Application for Amend to License NPR-58,changing TS 3.6.1.2, Primary Containment Leakage & Revising as-found Value of Overall Integrated Primary Containment Leakage Rate.Request for Exemption Re Primary Containment Leakage Rate Also + (12:00:03, 20 December 2024)
- ML20034F956 + (12:00:05, 20 December 2024)
- ML20034F955 + (12:00:06, 20 December 2024)
- ML20034F954 + (12:00:07, 20 December 2024)
- ML20034F953 + (12:00:09, 20 December 2024)
- ML20034F952 + (12:00:13, 20 December 2024)
- ML20034F950 + (12:00:15, 20 December 2024)
- ML20034F949 + (12:00:16, 20 December 2024)
- ML20034F948 + (12:00:17, 20 December 2024)
- ML20034F944 + (12:00:18, 20 December 2024)
- ML20034F941 + (12:00:19, 20 December 2024)
- ML20034F939 + (12:00:20, 20 December 2024)
- ML20034F938 + (12:00:21, 20 December 2024)
- BECO-LTR-93-026, Responds to NRC Ltr Re Violations Noted in Insp Rept 50-293/92-28 on 921124-1231.Corrective Actions:Maint Supervisor Training Will Be Strengthened by Including Key Elements of Training Provided to I&C Supervisors on 930201 + (12:00:22, 20 December 2024)
- ML20034F935 + (12:00:25, 20 December 2024)
- ML20034F933 + (12:00:26, 20 December 2024)
- ML20034F929 + (12:00:27, 20 December 2024)
- ML20034F927 + (12:00:28, 20 December 2024)
- ST-HL-AE-4350, Requests Extension of 72 Hours to Waiver of Compliance from Requirements of TS 3.7.1.2 Action B as It Applies to Turbine Driven AFW Pump,Which Was Granted by NRC on 930225 + (12:00:30, 20 December 2024)
- ML20034F925 + (12:00:32, 20 December 2024)
- ML20034F924 + (12:00:33, 20 December 2024)
- ML20034F923 + (12:00:35, 20 December 2024)
- ML20034F922 + (12:00:36, 20 December 2024)
- ML20034F921 + (12:00:37, 20 December 2024)
- ML20034F920 + (12:00:38, 20 December 2024)
- ML20034F918 + (12:00:39, 20 December 2024)
- ML20034F917 + (12:00:42, 20 December 2024)
- ML20034F916 + (12:00:43, 20 December 2024)
- ML20034F914 + (12:00:44, 20 December 2024)
- ML20034F913 + (12:00:45, 20 December 2024)