ML20034F925
| ML20034F925 | |
| Person / Time | |
|---|---|
| Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
| Issue date: | 12/31/1992 |
| From: | Tremblay L VERMONT YANKEE NUCLEAR POWER CORP. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES) |
| References | |
| BVY-93-23, NUDOCS 9303050195 | |
| Download: ML20034F925 (2) | |
Text
....,
s i
.V8RMONT YANKEE NUCLEAR POWER CORPORATION l
l Ferry Road, Brattleboro, VT 05301-7002 l
)g ENGINEERING OFFICE 5SD MAIN STREET
{
BOLTON. MA 01740 I
($D8) 779-6711 February 26,1993 BVY 93 - 23 United States Nuclear Regulatory Commission j
Document Control Desk Washington, DC 20555 l
l Attention:
Director, Office of Nuclear Regulatory Research Refennees:
a.
License No. DPR-28 (Docket No. 50-271)
Subject 1992 Personnel Monitoring Repon
Dear Sir:
Enclosed please find one copy of the Vermont Yankee " Summary of Personnel Monitoring Report - Final End of the. Year Report for 1992", as required by 10CFR20.407. This repon covers the period beginning January 1,1992 and ending December 31,1992.
We trust this repon is acceptable; however, should you have any questions, please contact this office.
Very truly yours, VERMONT YANKEE NUCLEAR POWER CORPORATION dDND
.4
^
l.conard A. Tremblay, Jr.
(
SeniorLicensing Engineer cc:
USNRC Region I Administrator USNRC ResidentInspector-VYNPS USNRC Project Manager-VYNPS 1 050042 9303050195 930226 PDR ADDCK 05000271 f1 R
/-
PDR i
I d
i
8:22 AM Wednesday February 3, 1993 Page 1
i 1
SUMMARY
GF PERSONNEL MONITORING REPORT FINAL END OF THE YEAR REPORT FOR 1992 L
Estimated whole body exposure range (Rem)
Numoer of l
individuals in i
each range L
No measurable exposure.................................. 999 Measurable exposure less than 0.1....................... 276 0.1 to 0.25............................................. 181 t
0.25 to 0.5............................................. 197 O.5 to 0.75............................................. 121 r
0.75 to 1.0.............................................. 62 1.0 to 2.0............................................... 78 2.0 to 3.0............................................... 6 3.0 to 4.0.................................................O 4.0 to 5.0
.................................................O 5.0 to 6.0
.................................................O 6.0 to 7.0
...............................................,..O l
7.0 to 8.0
.................................................O
[
8.0 to 9.0
.................................................O 9.0 to 10.0................................................O 10.0 to 11.0
...............................................O 11.0 to 12.0
...............................................O 12.0 +
.....................................................O Total number of personnel monitored 1920 END OF PERSONNEL MONITORING REPORT
.,