ML20034F998

From kanterella
Jump to navigation Jump to search
Notification of Significant Licensee Meeting on 930304 in Region IV Ofc to Discuss Violations Re Inadequate Corrective Actions for Temporary Strainers & Inaccurate & Incomplete Info Supplied to Nrc,Per Insp Rept 50-298/93-06
ML20034F998
Person / Time
Site: Cooper 
Issue date: 03/01/1993
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
NUDOCS 9303080049
Download: ML20034F998 (3)


See also: IR 05000298/1993006

Text

/pa afCg

UNIT ED STAVES

-

fg

NUCLEAR REGULATORY COMMISSION

'

l)

S

REGloN IV

I

o

611 RYAN PLAZA DRIVE, SulT E 400

[

AR LINGToN. T E XAS 76011-8064

Y.

-s

l@

l\\@

NOTICE OF SIGNIFICANT LICENSEE MEETING

,

'

Name of Licensee:

Nebraska Public Power District

Name of Facility:

Cooper Nuclear Station (CNS)

Docket No.:

50-298

Date and Time

March 4, 1993

of Meeting:

10 a.m. (CST)

,

location of Meeting: NRC Region IV Office, 4th Floor Training Conference Room

Purpose of Meeting:

Enforcement conference to discuss apparent violations

associated with inadequate corrective actions for

temporary strainers and inaccurate and incomplete

information supplied to the NRC (Inspection

Report 50-298/93-06, February 26, 1993),

NRC Attendees:

A. Beach, Director, Division of Reactor Projects (DRP)

J. Gagliardo, Chief, Project Section C, DRP

L. Constable, Chief, Plant Support Section, Division of

Reactor Safety

G. Hubbard, Acting Project Director, Project

Directorate IV, Office of Nuclear Reactor

,

Regulation (NRR)

R. Kopriva, Senior Resident Inspector, DRP

W. Walker, Resident Inspector, DRP

H. Rood, Project Manager, NRR

G. Sanborn, Enforcement Officer, Region IV

W. Brown, General Counsel, Region IV

E. Collins, Project Engineer, DRP

Licensee Attendees:

G. Horn, Nuclear Power Group Manager

J. Meacham, CNS Site Manager

,

R. Gardner, CNS Plant Manger

J. Flaherty, CNS Engineering Manager

,

NOTE:

(1) Attendance by NRC personnel at the NRC/ licensee meeting should be made

,

known by COB on March 3 via telephone call to E. Collins (817/860-8291).

,

,

PDR

ADOCK 05000298

,[ y g ;

9303080049 930301

PDR

O

j

,

.

!

Nebraska Public Power District

-2-

,

f

(2) Due to the nature of the subject matter, this meeting is not open to

!

attendance by members of the general public.

n( 1

!

Approved By:

x0

-

-.

'7A. Bill Beach, Director

Division of Reactor Projects

i

e

i

!

l

)

i

I

,

9

i

.

.

-.

!

-

'

.

3

Nebrasks Public Power District

-3_

!

Distribution:

DMB (IE.45) :

J. H. Sniezek, DEDR (MS 17G21)

.

H. L. Thompson, DEDS (MS 17G21)

'

T. E. Murley, D/NRR (MS 12D1)

W. T. Russell, ADT/NRR (MS 12G18)

J. G. Partlow, ADP/NRR (MS 12D9)

,

J. Lieberman, D/0E (MS 7H5)

L. J. Chandler, OGC (MS 15B18)

,

OEDO RIV Coordinator (MS 17G21)

i

L. R. Plisco, LPEB/NRR (MS 10A19)

t

J. L. Milhoan, RA

i

J. M. Montgomery, DRA

'

C. A. Hackney, RSLO

i

J. Gilliland, PAO, RIV

NRC Attendees

RA Secretary

Ann Mattila

-

Division Secretary (DRP)

<

RIV File

'

F

i

-I

l

t

h

i

i

'

4

>

i

!

v