Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- B10284, Forwards SAR for SEP Topic IX-3, Station Svc & Cooling Water Sys. Pending Resolution of Single Failure Considerations in Section 3,sys Meet Intent of Current Regulatory Criteria + (05:22:17, 20 December 2024)
- 05000305/LER-1981-038-03, /03L-0:on 811113,during Surveillance Testing on Shield Bldg Vent Sys,Check Damper SBV-10A Failed Shut.Caused by Ruptured Diaphragm Which Separates Motor from Oil Reservoir.Motor Replaced + (05:22:20, 20 December 2024)
- B10270, Forwards SAR for SEP Topic II-3.B.1, Capability of Operating Plant to Cope W/Design Basis Flooding Conditions. Pending Resolution of Topic,Requirements Procedures Re Selected safety-related Sys May Emerge + (05:22:22, 20 December 2024)
- PNO-III-81-115, on 811214,containment Integrity Violated When Vent Path Established Via Open Inner Personnel Airlock Door & Open Manual valve,P5A-VAS.Caused by Personnel Error During Heatup + (05:22:25, 20 December 2024)
- 05000305/LER-1981-038, Forwards LER 81-038/03L-0 + (05:22:26, 20 December 2024)
- 05000295/LER-1981-048-03, /03L-0:on 811111,containment Particulate & Gas Rad Monitors (1RE-0011 & 12) Failed Due to Tripped Blower. Caused by Mechanical Failure of Conde P/N 6SFCWSB Blower.New Blower Will Be Installed + (05:22:31, 20 December 2024)
- AECM-81-472, Forwards Info on Seismic & LOCA Loadings,In Response to NRC Request for Addl Info Re Facility SER (NUREG-0831). Encl Info Represents Proposed Change to FSAR & Will Be Incorporated Into Next FSAR Amend + (05:22:34, 20 December 2024)
- ML20039B177 + (05:22:34, 20 December 2024)
- 05000295/LER-1981-048, Forwards LER 81-048/03L-0 + (05:22:37, 20 December 2024)
- ML20039B173 + (05:22:39, 20 December 2024)
- ML20039B172 + (05:22:39, 20 December 2024)
- B10271, Forwards Safety Assessment Rept for SEP Topic II-3.C,safety -related Water Supply (UHS) Per 810729 Commitment + (05:22:41, 20 December 2024)
- ML20039B169 + (05:22:42, 20 December 2024)
- IR 05000312/1981031 + (05:22:44, 20 December 2024)
- ML20039B166 + (05:22:46, 20 December 2024)
- B10268, Forwards Safety Assessment Rept for SEP Topic II-3.A, Hydrologic Description,Per 810729 Commitment + (05:22:47, 20 December 2024)
- ML20039B164 + (05:22:49, 20 December 2024)
- ML20039B162 + (05:22:50, 20 December 2024)
- ML20039B161 + (05:22:51, 20 December 2024)
- AECM-81-504, Provides Info Re Analysis to Be Performed by GE for Fuel Assembly Liftoff,In Responses to NRC Request for Addl Info in Support of Facility SER (NUREG-0831).Analysis of Impact Loads Will Be Performed Independently + (05:22:52, 20 December 2024)
- ML20039B160 + (05:22:52, 20 December 2024)
- 05000286/LER-1981-009-03, /03L-0:on 811110,battery Charger 31 Tripped.Cause Not specified.Delta-P Air Flow Sensing Switch Replaced + (05:22:55, 20 December 2024)
- ML20039B155 + (05:22:57, 20 December 2024)
- ML20039B154 + (05:22:57, 20 December 2024)
- 05000286/LER-1981-009, Forwards LER 81-009/03L-0 + (05:22:59, 20 December 2024)
- ML20039B151 + (05:23:00, 20 December 2024)
- ML20039B149 + (05:23:01, 20 December 2024)
- 05000318/LER-1981-051-03, /03L-0:on 811109,RCS Net Leakage Found to Be 2.1 Gpm.Caused by Crack Due to Vibrations in Weld on Adapter to Tubing on Reactor Coolant Pump Middle Seal Pressure Sensing Line.Engineering Evaluation Continuing + (05:23:02, 20 December 2024)
- ML20039B147 + (05:23:03, 20 December 2024)
- IR 05000285/1981019 + (05:23:05, 20 December 2024)
- ML20039B144 + (05:23:09, 20 December 2024)
- ML20039B142 + (05:23:10, 20 December 2024)
- ML20039B141 + (05:23:11, 20 December 2024)
- IR 05000133/1981004 + (05:23:13, 20 December 2024)
- 05000318/LER-1981-051, Forwards LER 81-051/03L-0 + (05:23:15, 20 December 2024)
- ML20039B137 + (05:23:16, 20 December 2024)
- ML20039B135 + (05:23:17, 20 December 2024)
- ML20039B133 + (05:23:18, 20 December 2024)
- ML20039B132 + (05:23:19, 20 December 2024)
- ML20039B131 + (05:23:20, 20 December 2024)
- AECM-81-481, Forwards Revised Process Control Program, in Response to Discussions W/Nrc & 811208 Telcon Re Proposed Program Changes.Revision Includes Instructions for Solidification of Radwaste Slurry & Evaporator Botton Concentrates + (05:23:21, 20 December 2024)
- 05000271/LER-1981-033-01, /01T-0:on 811125,reactor Bldg Roof Hatch Opened by Work Crew W/O Notice to Supervisor Until Fire Permit for Welding Requested.Caused by Personnel Error.Personnel Reinstructed Re Procedural Requirement + (05:23:23, 20 December 2024)
- ML20039B127 + (05:23:25, 20 December 2024)
- 05000271/LER-1981-033, Forwards LER 81-033/01T-0 + (05:23:26, 20 December 2024)
- ML20039B124 + (05:23:28, 20 December 2024)
- 05000245/LER-1981-036-03, /03L-0:on 811112,pressure Switch 2206-1621D Tripped Outside Allowable Band.Caused by Setpoint Drift. Switch Readjusted + (05:23:29, 20 December 2024)
- ML20039B121 + (05:23:31, 20 December 2024)
- ML20039B120 + (05:23:32, 20 December 2024)
- ML20039B119 + (05:23:33, 20 December 2024)
- 05000245/LER-1981-036, Forwards LER 81-036/03L-0.Detailed Event Analysis Encl + (05:23:34, 20 December 2024)
- ML20039B116 + (05:23:35, 20 December 2024)