Text
-
's e,
e Constimers Power James W Cook Vice President
- Projects, hyneering and Construction 81-03 #10 c.n.r.: cetic : 1945 w e e.rn.ii no.d. J.ek.on, vi 492ot. cst 7 788 o4s3 December 11, 1981 Mr J G Keppler, Regional Director Office of Inspection & Enforcement US Iluelear Regulatory Connission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 g
~
MIDLAIID PROJECT -
A 4
\\
BORATED WATER STORAGE TAliK FOU!IDATICII OL DESIGII CALCULATICIIS 3
FILE: 0485.16, 9.h.9.h9 SERIAL: 1h6h5
?
l ts.,,Ys'y g
~'-'
ll 3,, kCg' IS8k
References:
J W Cook letters to J G Eeppler:
L._
Pi
('\\K "41k~..'p %
(
(1) Serial 11201, dated February 2r J.981 DEOd*
(2) Serial 11528, dated April 3,1981 y
~
( 3) Serial 12015, dated June 12, 1981 Q
jg (h) Serial 12799, dated June 26, 1981
/ gigsp (5) Serial 13352, dated July 21, 1981 (6) Serial 13653, dated August 28, 1981 (7) Serial lh591, dated October 26, 1981 (8) Serial 1h339, dated Iiovember 13, 1981 (9) Serial lh902, dated Itovember 2h,1981 This letter, as were the referenced letters, is an interim 50 55(e) report concerning the existence of cracks in the borated water storage tank foundation.
Reference (7) comitted to another report on or before December 11, 1981.
Subsequently two reports, References (8) and (9), vere subnitted. These reports forwarded the initial design report and Addendu: IIo 1, respectively.
Each of these reports continued to concit to another report on or before December 11, 1981. The review of the BWST finite element analysis results are still under review and no substantive additional information is available at this time.
The results of EWST finite element analysis will be submitted as a 50 55(e) report which will be subnitted on or before January 15, 1982.
4 JLW/1r El>k#$$oShoj$$
BEc, y h,A S
IS91
/{
f 4
2 Serial lh645 81-03 #10 CC: Atonic Safety & Licensing Appeal Board Director, Office of Inspection & Enforcement, Att Mr Victor Stello, NRC (15)
Director, Office of Management, Information & Program Control, NRC (1)
CBechhoefer, ASLB JHarbour, ASLB MMCherry, Esq RJCook, Midland Resident Inspector FFCowan, ASLB BSDecker, ASLB HRDenton, NRC SGadler DSHood, NRC JDKane, NRC
'dEMarshall, Esq
'40tto, Arny Corps of Engineers FRinaldi, URC HSingh, Army Corps of Engineers BStamiris i
i 1
1 l
l l
l