Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000409/LER-1981-013, Forwards LER 81-013/03L-0.Detailed Event Analysis Submitted + (05:21:29, 20 December 2024)
- 05000263/LER-1981-021, /03L-0:on 811110,during Cold shutdown,4 Channel a Main Steam Line High Flow Switches Found Inoperable.Caused by Heating of Switching Element Due to Relay Coil Failure, Initially Reported in LER 81-021.Elements Replaced + (05:21:31, 20 December 2024)
- ML20039B227 + (05:21:32, 20 December 2024)
- ML20039B226 + (05:21:33, 20 December 2024)
- 05000263/LER-1981-023, Forwards LER 81-023/03L-0 + (05:21:34, 20 December 2024)
- ML20039B222 + (05:21:35, 20 December 2024)
- ML20039B220 + (05:21:37, 20 December 2024)
- IR 05000508/1981018 + (05:21:38, 20 December 2024)
- ML20039B218 + (05:21:42, 20 December 2024)
- ML20039B214 + (05:21:43, 20 December 2024)
- ML20039B216 + (05:21:43, 20 December 2024)
- ML20039B213 + (05:21:45, 20 December 2024)
- IR 05000344/1981030 + (05:21:46, 20 December 2024)
- RBG-11-502, Responds to IE Bulletin 81-02,Suppl 1, Failure of Gate Type Valves to Close Against Differential Pressure. Westinghouse Electro-Mechanical Div Motor Operated Valves Not Employed in Plant Design.Response Concluded + (05:21:47, 20 December 2024)
- ML20039B210 + (05:21:49, 20 December 2024)
- ML20039B209 + (05:21:50, 20 December 2024)
- ML20039B207 + (05:21:51, 20 December 2024)
- ML20039B205 + (05:21:52, 20 December 2024)
- ML20039B204 + (05:21:53, 20 December 2024)
- ML20039B201 + (05:21:55, 20 December 2024)
- PNO-III-81-111, on 811210,electrican Fell Approx 20 Ft from Scaffolding Platform to Turbine Bldg Floor.Electrician Taken to Hosp & Pronounced Dead + (05:21:57, 20 December 2024)
- ML20039B199 + (05:21:58, 20 December 2024)
- ML20039B197 + (05:21:59, 20 December 2024)
- ML20039B195 + (05:22:00, 20 December 2024)
- PNO-III-81-117, insp Revealed Discrepancies Between as-built Installation & as-built Structural Drawings.Independent Verification Program Initiated + (05:22:02, 20 December 2024)
- AECM-81-410, Forwards Addl Info Re Natural Circulation Control Rates,In Response to Question 281.9 of NRC 811023 & 1124 Ltrs. Portions of Encl Info Represent Proposed Charges to FSAR & Will Be Incorporated Into Next FSAR Amend + (05:22:03, 20 December 2024)
- ML20039B192 + (05:22:05, 20 December 2024)
- TXX-3436, Responds to IE Bulletin 81-02,Suppl 1,re Westinghouse Electro-Mechanical Div Valves.Valves Used Extensively in safety-related Applications.Subj Valve Will Have Increased Torque Setting &/Or Changed Gear Setting + (05:22:06, 20 December 2024)
- ML20039B190 + (05:22:08, 20 December 2024)
- IR 05000243/1981001 + (05:22:09, 20 December 2024)
- PNO-III-81-116, on 811216,top Nozzle of Spent Westinghouse Fuel Assembly Broke Off While Being Lifted Out of Storage Rack.Westinghouse Has Been Contacted for Recommendations.No Release or Fuel Pin Damage Occurred + (05:22:12, 20 December 2024)
- ML20039B185 + (05:22:16, 20 December 2024)
- B10284, Forwards SAR for SEP Topic IX-3, Station Svc & Cooling Water Sys. Pending Resolution of Single Failure Considerations in Section 3,sys Meet Intent of Current Regulatory Criteria + (05:22:17, 20 December 2024)
- 05000305/LER-1981-038-03, /03L-0:on 811113,during Surveillance Testing on Shield Bldg Vent Sys,Check Damper SBV-10A Failed Shut.Caused by Ruptured Diaphragm Which Separates Motor from Oil Reservoir.Motor Replaced + (05:22:20, 20 December 2024)
- B10270, Forwards SAR for SEP Topic II-3.B.1, Capability of Operating Plant to Cope W/Design Basis Flooding Conditions. Pending Resolution of Topic,Requirements Procedures Re Selected safety-related Sys May Emerge + (05:22:22, 20 December 2024)
- PNO-III-81-115, on 811214,containment Integrity Violated When Vent Path Established Via Open Inner Personnel Airlock Door & Open Manual valve,P5A-VAS.Caused by Personnel Error During Heatup + (05:22:25, 20 December 2024)
- 05000305/LER-1981-038, Forwards LER 81-038/03L-0 + (05:22:26, 20 December 2024)
- 05000295/LER-1981-048-03, /03L-0:on 811111,containment Particulate & Gas Rad Monitors (1RE-0011 & 12) Failed Due to Tripped Blower. Caused by Mechanical Failure of Conde P/N 6SFCWSB Blower.New Blower Will Be Installed + (05:22:31, 20 December 2024)
- AECM-81-472, Forwards Info on Seismic & LOCA Loadings,In Response to NRC Request for Addl Info Re Facility SER (NUREG-0831). Encl Info Represents Proposed Change to FSAR & Will Be Incorporated Into Next FSAR Amend + (05:22:34, 20 December 2024)
- ML20039B177 + (05:22:34, 20 December 2024)
- 05000295/LER-1981-048, Forwards LER 81-048/03L-0 + (05:22:37, 20 December 2024)
- ML20039B173 + (05:22:39, 20 December 2024)
- ML20039B172 + (05:22:39, 20 December 2024)
- B10271, Forwards Safety Assessment Rept for SEP Topic II-3.C,safety -related Water Supply (UHS) Per 810729 Commitment + (05:22:41, 20 December 2024)
- ML20039B169 + (05:22:42, 20 December 2024)
- IR 05000312/1981031 + (05:22:44, 20 December 2024)
- ML20039B166 + (05:22:46, 20 December 2024)
- B10268, Forwards Safety Assessment Rept for SEP Topic II-3.A, Hydrologic Description,Per 810729 Commitment + (05:22:47, 20 December 2024)
- ML20039B164 + (05:22:49, 20 December 2024)
- ML20039B162 + (05:22:50, 20 December 2024)
- ML20039B161 + (05:22:51, 20 December 2024)