Requests Extension of Time Until 820430 to Complete Util 810903 Commitments Re Environ Qualification of safety- Related Electrical Equipment.Rept Will Reflect Replaced & New Equipment Installed Per TMI Action Plan
ML20039B207
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 12/17/1981
From: Bordine T
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Crutchfield D
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8112220420
Download: ML20039B207 (2)


Text

.

O Consumels Power Company Generet offices: 212 West Mich6 gen Avenue, Jackson, MI 49201 *(517) 788-oS50 December 17, 1981 n

4 i ~%$

d' ti,#cQI887g f

Dennis M Crutchfield, Chi-f j d if Operating Reactors Branch No 5 L-

' $,. ' c,.

s Nuclear Reactor Regulation

%/4.:

US Nuclear Regulatory Commission f'D..

Washington, DC 20555

]F' DOCKET 50-155 - LICENSE DPR BIG ROCK POINT PLANT - ENVIRONMENTAL QUALIFICATION OF SAFETY-RELATED ELECTRICAL EQUIPMENT Consumers Power Company, by letter dated September 3, 1981, responded to a 90-day NRC Safety Evaluation Report request concerning our Environmental Qualifi-cation of Safety-Related Electrical Equipment Report.

The September 3, 1981' letter included the following two commitments as follow-up to the submittal:

1.

By approximately January 5, 1981, submittal pages will be revised to reply to all questions contained in Section 4 of the TER except for questions relating to aging and to equipment that is being replaced. The Qualifica-tion Report will also be revised to reflect equipment that has been replaced and new equipment being installed because of the TMI Action Plan.

Further details will be supplied on our Preventive Maintenance and Inspection Programs to add-ess aging.

2.

By approximately April 5, 1982, an additional submittal will address the aging problem in detail. Equipment will be further analyzed to identify critical materials susceptible to aging and the resultant Preventive Maintenance and Inspection Programs will be described.

A schedule of further actions on equipment qualification will be presented including expected dates for installation of equipment and for carrying out the Preventive and Maintenance and Inspection Programs.

Additional time is requested to complete these commitments. Details concern-ing the status of replacement commitments, surveillance program status, IE equipment additions and modifications in the 1982 refueling outage and incor-0%

J poration of our qualification program with results from the Probabilistic Risk Assessment necessitate considerable coordination with refueling outage sched-j uling.

Final package assimilation can be performed within a couple of weeks

/

P oc1281-0021bl42 8112220420 811217 PDR ADOCK 05000155 P

P_D.R l

b Dennis M Crutchfield, Chief 2

Big Rock Point Plant December 17, 1981 following completion of the refueling outage.

Therefore, it is estimated that the commitments identified as Items 1 and 2 above, can be submitted via one report by approximately April 30, 1982.

Thomas C Bordine (Signed)

N m

<M Thomas C Bordine Staff Licensing Engineer CC Administrator Region III, OSNRC NRC Resident Inspector-Sig Rock Point l