Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000271/LER-1981-035, Forwards LER 81-035/03L-0 + (04:13:59, 20 December 2024)
- ML20039F002 + (04:14:00, 20 December 2024)
- 05000237/LER-1981-072-03, /03L-0:on 811203,standby Gas Treatment Sys Train B Tripped Following Group II & III Isolation Signal & Declared Inoperable.Caused by Plugged Orifice on Air Flow Controller, Stopping Air Flow & Falsely Indicating Fan Flow + (04:14:01, 20 December 2024)
- 05000312/LER-1981-056, Forwards LER 81-056/01T-0.Detailed Event Analysis Submitted + (04:14:04, 20 December 2024)
- ML20039E998 + (04:14:05, 20 December 2024)
- 05000237/LER-1981-072, Forwards LER 81-072/03L-0 + (04:14:06, 20 December 2024)
- ML20039E995 + (04:14:09, 20 December 2024)
- ML20039E994 + (04:14:10, 20 December 2024)
- LD-82-001, Forwards Proprietary & Nonproprietary Versions of Cesec Digital Sumulation of C-E Nsss. Proprietary Version Available in Central Files Only + (04:14:14, 20 December 2024)
- ML20039E988 + (04:14:19, 20 December 2024)
- ML20039E987 + (04:14:20, 20 December 2024)
- ML20039E986 + (04:14:22, 20 December 2024)
- ML20039E985 + (04:14:23, 20 December 2024)
- IR 05000460/1981010 + (04:15:06, 20 December 2024)
- IR 05000498/1981036 + (04:15:10, 20 December 2024)
- ML20039E982 + (04:15:12, 20 December 2024)
- ML20039E981 + (04:15:13, 20 December 2024)
- ML20039E979 + (04:15:14, 20 December 2024)
- ML20039E977 + (04:15:15, 20 December 2024)
- ML20039E975 + (04:15:16, 20 December 2024)
- ML20039E974 + (04:15:16, 20 December 2024)
- ML20039E972 + (04:15:17, 20 December 2024)
- ML20039E971 + (04:15:18, 20 December 2024)
- ML20039E970 + (04:15:20, 20 December 2024)
- ML20039E969 + (04:15:20, 20 December 2024)
- 05000346/LER-1981-075-03, /03L-0:on 811129,TE-RC3A2 Failed Causing Input to Reactor Protection Sys Channel 4 to Fail High & Trip on High Temp & Temp/Pressure.Caused by TE-RC3A2 Failing in Open Position.Alignment & String Check Performed + (04:15:22, 20 December 2024)
- ML20039E967 + (04:15:23, 20 December 2024)
- IR 05000498/1981035 + (04:15:27, 20 December 2024)
- ML20039E965 + (04:15:29, 20 December 2024)
- 05000346/LER-1981-075, Forwards LER 81-075/03L-0 + (04:15:30, 20 December 2024)
- ML20039E962 + (04:15:31, 20 December 2024)
- ML20039E961 + (04:15:32, 20 December 2024)
- ML20039E960 + (04:15:33, 20 December 2024)
- ML20039E959 + (04:15:35, 20 December 2024)
- ML20039E956 + (04:15:36, 20 December 2024)
- ML20039E957 + (04:15:36, 20 December 2024)
- ML20039E955 + (04:15:37, 20 December 2024)
- ML20039E953 + (04:15:37, 20 December 2024)
- ML20039E950 + (04:15:38, 20 December 2024)
- ML20039E949 + (04:15:39, 20 December 2024)
- ML20039E947 + (04:15:41, 20 December 2024)
- 05000346/LER-1981-074-03, /03L-1:on 811116,B&W Confirmed New Analysis Showed General Increase in Reactor Protection Sys (RPS) Instrument String Errors.Actual RPS Trip Setpoints Adjusted.New Setpoints Will Be Determined for Cycle 3 Tech Specs + (04:15:42, 20 December 2024)
- ML20039E945 + (04:15:43, 20 December 2024)
- ML20039E944 + (04:15:44, 20 December 2024)
- 05000346/LER-1981-074, Forwards LER 81-074/03L-1 + (04:15:46, 20 December 2024)
- ML20039E941 + (04:15:47, 20 December 2024)
- ML20039E940 + (04:15:48, 20 December 2024)
- ML20039E939 + (04:15:48, 20 December 2024)
- IR 05000312/1981035 + (04:15:50, 20 December 2024)
- ML20039E937 + (04:15:51, 20 December 2024)
- ML20039E936 + (04:15:52, 20 December 2024)