Text
.
~ [p* K8%q#e
'
UNITED STATES
E'
-
NUCLEAR REGULATORY COMMISSION
- -
.y
asclON IV
l
S, fg
g
611 RYAN PLAZA DRIVE, SulTE 1000
\\ . . . + ,d
December 30, 1981
I
In Reply Refer To:
Dockets: 50-498/81-36
50-499/31-36
l
l
l
Houston Lighting and Power Company
ATTN: Mr. G. W. Oprea , Jr.
Executive Vice President
i
P. O. Box 1700
l
Houston, Texas 77001
-~
!
l
Gentlemen:
l
This refers to the inspection conducted by our Resident Reactor Inspector,
l
Mr. H. S. Phillips, during November and December 1981, of activities authorized
-
!
by NRC Construction Permits No. CPPR-128 and 129 for the South Texas Project,
Units 1 and 2, and to the discussions of our findings with Mr. J. E. Geiger
and other members of your staff at the conclusion of the inspection.
I
Areas examined during this inspection and our. findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews
,
with personnel, and observation by the inspector.
l
l
Within the scope of the inspection, no violations or deviations were identified.
W5 have also examined actions you have take' W regard to previously identi-
--
fied inspection findings.
The status of E ue itens is identified in paragraphs
2, 3, and 4 of the enclosed report.
Two new unresolved items are identified in parageaph 2 of the enclosed report.
'
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
-
=-
will be placed in the NRC Public Document Room unless you, notify this office,
by telephone, within 10 days of the date of this letter and submit written
application to withhold information contained therein within 30 days of the
date of this letter. Such application must be consistent with the require-
ments of 2.790(b)(1).
.
,
EXHIBIT 131
hk
O
T
<-
!
t
Houston Lighting and Power Company
2
December 30, 1981
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
/G. L. Madsen, Chief
Reactor Projects Branch
_
Enclosure:
Appendix-NRC Inspection Report 50-498/81-36
. . . . .
50-499/81-36
t
.
l