IR 05000312/1981035

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-312/81-35 on 811214-18.No Noncompliance Noted.Major Areas Inspected:Security Organization Re Mgt Personnel,Response,Audit & Testing & Maint.Details Withheld (Ref 10CFR2.790)
ML20039E938
Person / Time
Site: Rancho Seco
Issue date: 12/30/1981
From: Ivey L, Mcqueen A, Schuster M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20039E934 List:
References
50-312-81-35, NUDOCS 8201110634
Download: ML20039E938 (1)


Text

The information on this page is considered to be appropriate

-

-

for public disclosure pursuant to 10 CFR 2.790.

U.S. fMCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

' Region V Report flo. 50-312/81-35 (IE-V-475)

.

Docket No. 50-312 License No.

DPR-54 Safeguards Group

!

Licensee:

Sacramento Municipal Utility District P. O. Box 15830

__

Sacramento, California 95813 Facility Name:

Rancho Seco Nuclear Generating Station Inspection at:

Clay Station, California Inspection Conducted: December 14-18, 1981 Date of Last Physical Security Inspection Visit: September 14-18, 1981 Type of Inspection:

Unannoun ed Physisa. Securitv Inspectors:

< >.

m 42, c3O[,9/

-

-

E &spector

/a/so///

L.

.SKPhys' cal / Pro tion In

'Date Signed

.

A. D. McQueen, Physical ProtecCion Inspector Date Si0ned Date Signed Approvedby:/

(M

/ho///

m-p V M. 'D. Setiuster, Chief, Physical Security Sectior, Date Signed Inspect Str mary:

Areas Inspected:

Included a review of the Security Plan and Impleinenting

.

Procedures; Site Orientation; Security Organization-Management; Security Organizatiow Personnel; Security Organization-Response; Security Program Audit; Recoras and Reports; Testing and Maintenance; Locks, Keys, ar;d Combinations; Physical 3arriers-PA; Physical Barriers-VA; Security System Power Supply; Lighting; Assessment Aids; Access Control-Personnel; Access Control-Packages; Access Control-Vehicles; Detection Aids-PA; Detection Aids-VA; Alara Stations; Communications; Appendix B, 10 CFR 73 and Appendix C,10 CFR 73.

-

The inspection involved 74 inspector hours onsite by two NRC inspectors.

The inspection was begun during regular work hours, and six of the total inspection hours were accomplished during off-shift periods.

-

R_esults: The licensee was found to be in compliance with NRC requirements e

within the areas inspected.

8201110E34 820104 f-DR ADOCK 05000312

"o

__.

t