IR 05000312/1981035
| ML20039E938 | |
| Person / Time | |
|---|---|
| Site: | Rancho Seco |
| Issue date: | 12/30/1981 |
| From: | Ivey L, Mcqueen A, Schuster M NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | |
| Shared Package | |
| ML20039E934 | List: |
| References | |
| 50-312-81-35, NUDOCS 8201110634 | |
| Download: ML20039E938 (1) | |
Text
The information on this page is considered to be appropriate
-
-
for public disclosure pursuant to 10 CFR 2.790.
U.S. fMCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT
' Region V Report flo. 50-312/81-35 (IE-V-475)
.
Docket No. 50-312 License No.
DPR-54 Safeguards Group
!
Licensee:
Sacramento Municipal Utility District P. O. Box 15830
__
Sacramento, California 95813 Facility Name:
Rancho Seco Nuclear Generating Station Inspection at:
Clay Station, California Inspection Conducted: December 14-18, 1981 Date of Last Physical Security Inspection Visit: September 14-18, 1981 Type of Inspection:
Unannoun ed Physisa. Securitv Inspectors:
< >.
m 42, c3O[,9/
-
-
E &spector
/a/so///
L.
.SKPhys' cal / Pro tion In
'Date Signed
.
A. D. McQueen, Physical ProtecCion Inspector Date Si0ned Date Signed Approvedby:/
(M
/ho///
m-p V M. 'D. Setiuster, Chief, Physical Security Sectior, Date Signed Inspect Str mary:
Areas Inspected:
Included a review of the Security Plan and Impleinenting
.
Procedures; Site Orientation; Security Organization-Management; Security Organizatiow Personnel; Security Organization-Response; Security Program Audit; Recoras and Reports; Testing and Maintenance; Locks, Keys, ar;d Combinations; Physical 3arriers-PA; Physical Barriers-VA; Security System Power Supply; Lighting; Assessment Aids; Access Control-Personnel; Access Control-Packages; Access Control-Vehicles; Detection Aids-PA; Detection Aids-VA; Alara Stations; Communications; Appendix B, 10 CFR 73 and Appendix C,10 CFR 73.
-
The inspection involved 74 inspector hours onsite by two NRC inspectors.
The inspection was begun during regular work hours, and six of the total inspection hours were accomplished during off-shift periods.
-
R_esults: The licensee was found to be in compliance with NRC requirements e
within the areas inspected.
8201110E34 820104 f-DR ADOCK 05000312