ML20039E979
| ML20039E979 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 01/05/1982 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20039E980 | List: |
| References | |
| NUDOCS 8201110684 | |
| Download: ML20039E979 (2) | |
See also: IR 05000456/1981014
Text
>
.
/
i
'
h
/ ,.
Q2
'
Docket No. 50-456
j y.
p
i
Docket No. 50-457
[t
g
-
J,0y"
P
n,.D
7
Comironwealth Edison Company
A
*'
ATTN: Mr. Cordell Reed
..
'
\\
(/
Vice President
Post Office Box 767
/
Chicago, IL 60690
. ,7
,s
Gentlemen:
This refers to the routine safety inspection conducted by Messrs.
R. N. Gardner, R. B. Landsman, and R. N. Sutphin of this office on
November 18-20, 1981, of activities at Braidwood Station, Units I and 2,
authorized by NRC Construction Permits No. CPPR-132 and No. CPPR-133 and
to the discussion of our findings with Mr. R. Cosaro and others of your
staff at the conclusion of the inspection.
,
i
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
,
terviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as specified in the enclosed Appendix.
A written response, submitted under oath or af firmation, is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
'
this letter, the enclosures, and your response to this letter will be placed
in the NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office to
withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
,
lished. Consistent with Section 2.790(b)(1), any such application must
be accompanied by an affidavit executed by the owner of the information
8201110684 820105
[~
PDR ADOCK 05000456
,
6_.
G
fel
--
_
if,
-
-
.
1
Conunonwealth Edison Company
-2-
JAN 5
1982
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
claim that the infermation should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter, the enclosures,
and your response to this letter will be placed in the Public Document
Room.
We will gladly discuss any questions you have concerning this inspection.
!
Sincerely,
If0rigirhISISU$).Y_C_k$k'0II
~
d
i
C. E. Norelius, Director
Division of Engineering and
Technical Inspection
j
Enclosures:
1.
Appendix, Notice
of Violation
2.
Inspection Reports
No. 50-456/81-14 and
No. 50-457/81-14
cc w/encls:
Louis 0. De1 George, Director
of Nuclear Licensing
V. I. Schlosser, Project
Manager
R. Cosaro, Project
Superintendent
J. F. Gudac, Station
Superintecdent
DMB/ Document Control Desk (RIDS)
Mary Jo Murray, Office of
Assistant Attorney General
RIII
RIII
RIII
II -
R1II
RIII
RII
REI b
ff
ffd
wh
W
ftL
.
h1
Hawkir.s
tI11ams Teig er
Day lsmgny
sk
Sutphin/so
Gardner
12/10/81
pW4
n pjl