Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20041G003 + (00:06:48, 20 December 2024)
- ML20041G004 + (00:06:48, 20 December 2024)
- ML20041G002 + (00:06:49, 20 December 2024)
- ML20041G001 + (00:06:50, 20 December 2024)
- PNO-II-82-024C, on 820304,ultrasonic Test Insp Revealed Indications of Thermal Stress Cracks on Internal Diameter of Both High Pressure Injection Lines Used for Normal Makeup of Reactor Coolant.Dye Penetrant Testing Will Be Performed + (00:06:52, 20 December 2024)
- ML20041F999 + (00:06:53, 20 December 2024)
- IR 05000259/1982002 + (00:06:54, 20 December 2024)
- ML20041F996 + (00:06:56, 20 December 2024)
- ML20041F993 + (00:06:57, 20 December 2024)
- ML20041F994 + (00:06:57, 20 December 2024)
- IR 05000416/1982009 + (00:06:59, 20 December 2024)
- ML20041F990 + (00:07:00, 20 December 2024)
- ML20041F989 + (00:07:02, 20 December 2024)
- ML20041F988 + (00:07:02, 20 December 2024)
- IR 05000395/1982004 + (00:07:04, 20 December 2024)
- ML20041F986 + (00:07:05, 20 December 2024)
- ML20041F985 + (00:07:06, 20 December 2024)
- ML20041F983 + (00:07:07, 20 December 2024)
- ML20041F982 + (00:07:08, 20 December 2024)
- ML20041F981 + (00:07:09, 20 December 2024)
- ML20041F979 + (00:07:10, 20 December 2024)
- ML20041F978 + (00:07:12, 20 December 2024)
- ML20041F977 + (00:07:13, 20 December 2024)
- ML20041F976 + (00:07:13, 20 December 2024)
- ML20041F975 + (00:07:14, 20 December 2024)
- ML20041F974 + (00:07:15, 20 December 2024)
- ML20041F973 + (00:07:16, 20 December 2024)
- ML20041F972 + (00:07:16, 20 December 2024)
- ML20041F970 + (00:07:17, 20 December 2024)
- ML20041F968 + (00:07:18, 20 December 2024)
- ML20041F967 + (00:07:18, 20 December 2024)
- ML20041F966 + (00:07:19, 20 December 2024)
- IR 05000424/1982004 + (00:07:21, 20 December 2024)
- 05000320/LER-1982-007-03, /03L-0:on 820120,auxiliary Bldg Ventilation Sys Declared Inoperable Due to Low Flow Conditions.Caused by Supply Fan Trip in Fuel Handling Bldg Ventilation Sys on 820120 & 26.Supply Air Flowrate Restored to Operable Status + (00:07:23, 20 December 2024)
- ML20041F963 + (00:07:24, 20 December 2024)
- ML20041F962 + (00:07:25, 20 December 2024)
- ML20041F959 + (00:07:26, 20 December 2024)
- ML20041F960 + (00:07:26, 20 December 2024)
- ML20041F957 + (00:07:28, 20 December 2024)
- ML20041F955 + (00:07:29, 20 December 2024)
- 05000320/LER-1982-007, Forwards LER 82-007/03L-0 + (00:07:30, 20 December 2024)
- ML20041F951 + (00:07:31, 20 December 2024)
- PNO-II-81-074, on 810911,approx 4,000 Gallons Sulfuric Acid Spilled Into Water Treatment Facility.Caused by Failure of Transmitter Isolation Valve Diaphragm on Acid Storage Tank. Spill Contained Except for Approx 300 Gallons + (00:07:33, 20 December 2024)
- ML20041F949 + (00:07:34, 20 December 2024)
- ML20041F947 + (00:07:38, 20 December 2024)
- ML20041F946 + (00:07:38, 20 December 2024)
- PNO-II-81-058, on 810717,worker Received Whole Body Dose of 4212 Millirem When Working on Backwash Receiver Tank Resin Transfer Line.Caused by Resin Movement in Line. Investigation Continuing + (00:07:40, 20 December 2024)
- IR 05000302/1981015 + (00:07:41, 20 December 2024)
- ML20041F943 + (00:07:42, 20 December 2024)
- ML20041F940 + (00:07:46, 20 December 2024)
- 05000333/LER-1982-002-03, /03L-0:on 820203,core Thermal Power Calculation Found to Have Exceeded Rated Limit on Approx 46 Days of Cycle 4 Operation.Caused by Instrument Drift.Differential Pressure Gauge Installation Being Investigated + (00:07:47, 20 December 2024)
- 05000335/LER-1982-005-03, /03L-0:on 820204 & 14,during Full Power Operation, Two Out of Three Control Room Air Conditioning Units Out of Svc Simultaneously.Caused by Stuck Dampers & Faulty Linkage & Valves.Units Repaired & Returned to Svc + (00:07:48, 20 December 2024)