ML20041F988

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Equipment Determined to Be Unqualified During NUREG-0588 Review,Initially Reported 811015.Review & Evaluation Continuing.Next Rept Expected by 820601
ML20041F988
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 03/01/1982
From: Mcgaughy J
MISSISSIPPI POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
RTR-NUREG-0588, RTR-NUREG-588 10CFR-050.55E, 10CFR-50.55E, AECM-82-77, NUDOCS 8203170625
Download: ML20041F988 (2)


Text

r

'. UT C p e n. ;

MISSISSIPPI POWER & LIGHT COMPANY Helping Build Mississippi EdMEMiddB P. O. B O X 164 0, J AC K S O N, MIS SIS SIP PI 3 9 2 0 5

- 'l' ? 3 P 2. j t

  1. %,si$rTi@MsN'/r March 1, 1982 g D Office of Inspection & Enforcement Fo U. S. Nuclear Regulatory Commission E knO y Region II 101 Marietta Street, N.W.

Afg )

L g_

Suite 3100 jA 4's;z,,@2 4.

nf 7 q88g /7 7

Atlanta, Georgia 30303 hi[% S js 3

Attention: Mr. J. P. O'Reilly, Regional Administrator . I

Dear Mr. O'Reilly:

SUBJECT:

Grand Gulf Nuclear Station Unit. I and 2 Docke t Nos. 50-416/417 File 0260/15525/15526 PRD-81/42, Interim Report No. 2, NUREG-0588 AECM-82/77

Reference:

AECM-81/473, 12/1/81 On October 15, 1981, Mississippi Power & Light Company totified Mr. P. A.

Taylor, of your office, of a Potentially Reportable Deficiency (PRD) at the Grand Gulf Nuclear Station (GCNS) construction site. The deficiency concerns equipment determined to be unqualified during the investigation of the NUREG-0588 Requirements.

j Our investigation since the submission of the referenced report has not revealed any additional items which can be reported as of this date. Our review and evaluation is continuing. We expect to submit our next interim report by June 1, 1982.

Yours truly, P

J. P. McGaughy, Jr.

ATR:dr See Page 2 M,5 l 8203170625 820301 1

PDR ADOCK 05000416 ,, /",7 S PDR J

Member Middle South Utilities System I' I

. o

. 4 Mr. J. P. O'Reilly AECM-82/77 NRC Page 2 cc: Mr. N. L. Stampley Mr. R. B. McGehee

, Mr. T. B. Conner Mr. Richard'C. DeYoung, Director Office of Inspection & Enforcement U. S. - Nuclear Regulatory Commission Washington, D.C. 20555 Mr. C. B. Taylor South Miss. Electric Power Association P. O. Box 1589 Hattiesburg, MS 39401 1

. .