ML20041F994

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-259/82-02,50-260/82-02 & 50-296/82-02 on 820125-29.No Noncompliance Noted
ML20041F994
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 02/19/1982
From: Cantrell F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20041F995 List:
References
NUDOCS 8203170635
Download: ML20041F994 (2)


See also: IR 05000259/1982002

Text

-

ydkw

.

FEB 191982

_

ui

c

-

Tennessee Valley Authority

E

k..

ATTN: Mr. H. G. Parris

4

%

p % ;q M.! p IP '

(T

~

'% '

Manager of Power

7

C.(fg$

500A Chestnut Street Tower II

EA

);

-

Chattanooga, TN 37401

%

g.

C

g

e ~,

,

,

,

Gentlemen:

X' '

d fg W

Subject: Report Nos.

'02, 50-260/82-02 and 50-296/82-02

This refers to the routine safety inspection conducted by Mr. T. R. Collins of

this office on January 25-29, 1982, of activities authorized by NRC Operating

License Nos. DPR-33, DPR-52 and DPR-68 for the Browns Ferry Nuclear Plant facil-

ity and to the discussion of our findings held with Mr. G. T. Jones, Plant Super-

intendent, at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC's Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter. Such application must be consistent with the requirements

of 2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

F. S. Cantrell, Acting Chief

Reactor Projects Branch 1

Division of Resident and

Reactor Project Inspection

Enclosure:

Inspection Report Nos. 50-259/82-02,

50-260/82-02 and 50-296/62-02

l

cc w/ encl:

See Page 2

8203170635 820219

PDR ADOCK 05000259

Y {Of5

_

_

_ ,

.

FE B 191982

Tennessee Valley Authority

2

.

cc w/ encl:

H. J. Green, Director of Nuclear Power

G. T. Jones, Plant Superintendent

R. E. Rogers, Project Engineer

H. N. Culver, Chief, Nuclear Safety

Review Staff

bec w/ encl:

NRC Resident Inspector

Document Management Branch

State of Alabama

_

l -

I

RII

RII

RI

RII

ECollins:ht

barr

AFGib on

RButcher

FSCantrell

2/li/82

2/g /82

2Q/82

2/IS/82

2/ff/82