Forwards IE Insp Repts 50-424/82-04 & 50-425/82-04 on 820110-0210.No Noncompliance Noted
ML20041F955
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 02/23/1982
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML20041F956 List:
References
NUDOCS 8203170589
Download: ML20041F955 (2)


See also: IR 05000424/1982004

Text

y

~

~

'

-

_

J'Lef

^'

-

-

.

FEB 2 31982

gx

-

'

t

%

s

m

Ceorgia Power Company

V

ATlN: Mr. J. H. Itiller, Jr.

p

g

Executive Vice President

'

P. 0." Box 4545

d. -

CSCph/$g

7

Atlanta , Gh -30302

.

.

Gentiemen:

8f

'fj

b

Subject:

Report tios.6424/82-h 50-425/82-04

/

_

' ' M IP.F N

4l.

ders of

This r'eiers to the routine safety inspection conducted by

this office on January 10 - February 10, 1982, of activities.autiorized by flRC

Construction Permit tios. CPPR-108 and CPPR-109 for the Vogtle facility and to the

discussion of our findings held with Itr. H. H. Gregory, III, Construction Project

!!anager, at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

'

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the f4RC's Public Document Room unless you notify this office,

by telephone, within ten days of +.he date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter.

Such application must be consistent with the requirements

of 2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

F. J. Long, Acting Chief

Reactor Project Branch 2,

Division of Project and

Resident Programs

Enclosure:

Inspection Report flos. 50-424/82-04

and 50-425/82-04

cc w/ encl:

H. H. Gregory,111, Construction

Projectfianager

8203170589 8'20223'

PDR ADOCK 05000424

T fois)

e

.

.

Georgia Power Company

2

FEB 2 31982

E. D. Groover, QA Site Supervisor

D. O. Foster, Project General llanager