Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000346/LER-1980-009, Forwards LER 80-009/03L-0 + (12:23:57, 2 January 2025)
- ML19296C571 + (12:23:58, 2 January 2025)
- ML19296C570 + (12:23:59, 2 January 2025)
- ML19296C569 + (12:24:00, 2 January 2025)
- ML19296C567 + (12:24:01, 2 January 2025)
- ML19296C568 + (12:24:01, 2 January 2025)
- ML19296C564 + (12:24:02, 2 January 2025)
- ML19296C565 + (12:24:02, 2 January 2025)
- 05000259/LER-1980-009-03, /03L-0:on 800125,SI 4.2.A-10,reactor Bldg Monitoring Was Performed Three Weeks Late.Caused by Oversight by Cognizant Section.Personnel Instructed to Be More Aware of Due Dates + (12:24:04, 2 January 2025)
- ML19296C560 + (12:24:07, 2 January 2025)
- ML19296C559 + (12:24:08, 2 January 2025)
- 05000259/LER-1980-007-03, /03L-0:on 800125,while Performing SI 4.2.A-16, Calibr Reactor Bldg Isolation &/Or Logic Timers,B Logic Channel Did Not Isolate.Caused by Intermittent Sticking of Relay R1B Resulting in Time Delay Contacts Being Closed + (12:24:09, 2 January 2025)
- ML19296C557 + (12:24:11, 2 January 2025)
- 05000259/LER-1980-007, Forwards LER 80-007/03L-0 + (12:24:12, 2 January 2025)
- ML19296C554 + (12:24:14, 2 January 2025)
- 05000259/LER-1980-006-03, /03L-0:on 800122,during Refueling Operations, Control Rod Driveline Accumulator Level Switch LS-1-305-129 on Unit 38-11 Was Found Inoperable.Caused by Broken Reed Switch.Switch Replaced + (12:24:15, 2 January 2025)
- ML19296C551 + (12:24:17, 2 January 2025)
- ML19296C549 + (12:24:18, 2 January 2025)
- ML19296C550 + (12:24:18, 2 January 2025)
- ML19296C547 + (12:24:19, 2 January 2025)
- 05000259/LER-1980-006, Forwards LER 80-006/03L-0 + (12:24:21, 2 January 2025)
- ML19296C544 + (12:24:23, 2 January 2025)
- 05000259/LER-1980-013-03, /03L-0:on 800124,during Refueling Operations,Time Delay Relay 2E-K 34 of Automatic Depressurization Sys Timed Out at 93-s.Caused by Random Mechanical Failure.Relay, Agastat Model 7012SE Replaced & Set within Tolerance + (12:24:27, 2 January 2025)
- ML19296C541 + (12:24:29, 2 January 2025)
- 05000259/LER-1980-013, Forwards LER 80-013/03L-0 + (12:24:31, 2 January 2025)
- CNL-19-097, Non-Voluntary License Amendment Request to Correct Unbalanced Voltage Relay Instrumentation Values (TS-19-22) + (12:24:32, 2 January 2025)
- ML19296C537 + (12:24:33, 2 January 2025)
- ML19296C535 + (12:24:34, 2 January 2025)
- ML19296C534 + (12:24:35, 2 January 2025)
- ML19296C532 + (12:24:36, 2 January 2025)
- 05000366/LER-1980-011-03, /03L-0:on 800202,while Performing Reactor Core Isolation Cooling Shutdown Flow Test,Power Inverter for Remote Flow Control Loop Found to Be Tripped.Caused by Defective Input Filter Capacitors + (12:24:38, 2 January 2025)
- ML19296C528 + (12:24:39, 2 January 2025)
- ML19296C526 + (12:24:40, 2 January 2025)
- ML19296C525 + (12:24:41, 2 January 2025)
- ML19296C524 + (12:24:41, 2 January 2025)
- ML19296C523 + (12:24:42, 2 January 2025)
- ML19296C521 + (12:24:43, 2 January 2025)
- ML19296C522 + (12:24:43, 2 January 2025)
- ML19296C519 + (12:24:44, 2 January 2025)
- ML19296C517 + (12:24:45, 2 January 2025)
- ML19296C518 + (12:24:45, 2 January 2025)
- ML19296C515 + (12:24:46, 2 January 2025)
- ML19296C514 + (12:24:47, 2 January 2025)
- ML19296C511 + (12:24:48, 2 January 2025)
- ML19296C510 + (12:24:49, 2 January 2025)
- ML19296C504 + (12:24:50, 2 January 2025)
- ML19296C503 + (12:24:51, 2 January 2025)
- ML19296C502 + (12:24:51, 2 January 2025)
- IR 05000546/1979029 + (12:24:53, 2 January 2025)
- ML19296C499 + (12:24:54, 2 January 2025)
- ML19296C496 + (12:24:55, 2 January 2025)