Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19308B563 + (09:52:57, 2 January 2025)
- ML19308B562 + (09:52:57, 2 January 2025)
- ML19308B561 + (09:52:58, 2 January 2025)
- ML19308B559 + (09:53:00, 2 January 2025)
- ML19308B557 + (09:53:00, 2 January 2025)
- ML19308B556 + (09:53:01, 2 January 2025)
- ML19308B555 + (09:53:01, 2 January 2025)
- ML19308B554 + (09:53:02, 2 January 2025)
- ML19308B552 + (09:53:04, 2 January 2025)
- ML19308B551 + (09:53:04, 2 January 2025)
- ML19308B550 + (09:53:05, 2 January 2025)
- 05000269/LER-1978-029, Forwards LER 78-029/03L-0 + (09:53:07, 2 January 2025)
- ML19308B547 + (09:53:08, 2 January 2025)
- ML19308B546 + (09:53:09, 2 January 2025)
- 05000287/LER-1978-008-03, /03L-0:on 780305,power Range Detector Found Spiking.Reactor Protection Sys Channel a Bypassed,Preventing Spurious Trips.Cause Not Determined.Investigation to Resume Next Refueling or Next Spiking + (09:53:11, 2 January 2025)
- ML19308B544 + (09:53:12, 2 January 2025)
- ML19308B541 + (09:53:13, 2 January 2025)
- 05000287/LER-1978-004-03, /03L-0:on 780203,valve BS-3 Failed to Open During Operability Test.Caused by Torque Switch Electrical Failure. Switch Replaced & Valve Operability Verified + (09:53:15, 2 January 2025)
- 05000287/LER-1978-008, Forwards LER 78-008/03L-0 + (09:53:16, 2 January 2025)
- ML19308B535 + (09:53:18, 2 January 2025)
- ML19308B533 + (09:53:19, 2 January 2025)
- 05000287/LER-1978-006-03, /03L-0:on 780210,Control Rod 3,Group 4,dropped Into Core During Breaker Test,Causing Power Runback to 55%. Caused by Stator Short Due to Excessive Moisture Entering Through Nonleakproof O-ring Seal.Stator Replaced + (09:53:20, 2 January 2025)
- ML19308B530 + (09:53:21, 2 January 2025)
- ML19308B529 + (09:53:22, 2 January 2025)
- 05000287/LER-1978-004, Forwards LER 78-004/03L-0 + (09:53:23, 2 January 2025)
- 05000287/LER-1978-006, Forwards LER 78-006/03L-0 + (09:53:25, 2 January 2025)
- ML19308B522 + (09:53:26, 2 January 2025)
- 05000287/LER-1978-005-03, /03L-0:on 780207,valve BS-2 Failed in Intermediate Position During Operability Test.Caused by Valve Stem Failure & Partly by Faulty Torgue Switch.Stem & Switch Replaced.Stems Made by Walworth + (09:53:30, 2 January 2025)
- 05000287/LER-1978-007-03, /03L-0:on 780208,suction Valve 3LPSW-123 Observed Closed During 3B Pump Startup.Valve Closure Cause Unknown. Probably Caused by Erroneous Closing During Repairs on on Pervious Day.Valve Opened & Pump Checked for Damages + (09:53:32, 2 January 2025)
- ML19308B518 + (09:53:34, 2 January 2025)
- ML19308B519 + (09:53:34, 2 January 2025)
- 05000287/LER-1978-007, Forwards LER 78-007/03L-0 + (09:53:36, 2 January 2025)
- 05000287/LER-1978-005, Forwards LER 78-005/03L-0 + (09:53:38, 2 January 2025)
- ML19308B506 + (09:53:38, 2 January 2025)
- IR 05000289/1979012 + (09:53:40, 2 January 2025)
- ML19308B503 + (09:53:41, 2 January 2025)
- ML19308B502 + (09:53:42, 2 January 2025)
- ML19308B501 + (09:53:43, 2 January 2025)
- ML19308B500 + (09:53:44, 2 January 2025)
- ML19308B499 + (09:53:45, 2 January 2025)
- ML19308B498 + (09:53:46, 2 January 2025)
- ML19308B497 + (09:53:47, 2 January 2025)
- ML19308B495 + (09:53:49, 2 January 2025)
- ML19308B494 + (09:53:51, 2 January 2025)
- IR 05000289/1979016 + (09:54:10, 2 January 2025)
- ML19308B491 + (09:54:12, 2 January 2025)
- ML19308B490 + (09:54:13, 2 January 2025)
- ML19308B488 + (09:54:14, 2 January 2025)
- ML19308B485 + (09:54:15, 2 January 2025)
- IR 05000320/1979021 + (09:54:17, 2 January 2025)
- ML19308B481 + (09:54:18, 2 January 2025)