IE Insp Repts 50-289/79-12 & 50-320/79-14 on 790522-25 & 0529-0601.No Noncompliance Noted.Major Areas Inspected: Review of Licensee Physical Security Program.Details Withheld (Ref 10CFR2.790)
ML19308B505
Person / Time
Site: Crane  Constellation icon.png
Issue date: 10/22/1979
From: Devlin J, Ladun R, Madden W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML19308B504 List:
References
50-289-79-12, 50-320-79-14, NUDOCS 8001090059
Download: ML19308B505 (1)


Text

.

.

.

/  %

U.S. NUCLEAR REGULATORY COMMISSION

"/

0FFICE OF INSPECTION AND ENFORCEMENT A

50-289/79-12 Report No.

50-320/79-I4 50-289 Decket No.

50-320 DPR-50 License No.

CPR-73 Priority

Category C

Licensee:

Petropolitan Edison Company P. O. Box 542 Reading, Pennsylvania 19640 Facility Name:

Three Mile island Nuclear <tation, Units 1 and 2

,

k Inspection at:

Middletown, Pennsylvania Inspection conducted: May 22 - May 25 and Ma 29 - June 1, 1979 Cate of Last P sical Secu ity Inspection Vis t.

March 23, 1979 Inspectors:

[ 1-\\u c

/c7 ' LE ' '2 /

W. Madcen, Physical Security Inspector date signed

[ :/

tr g f

~7 9 R. Lacun, Physical Security Inspector cate signec cate signed 8I-n- /12 7h

Approved by:

Ju'W. Devlin, Chief, Security and date signed Investigation Section, Safeguards Branch Insoection Summary:

Insoection on May 22 - May 25 and May 29 - June 1. 1979 (Report Nos. 50-289/ 79-12 and 50-320/79-14 Areas Insoected:

This special inspection was accomplished to review the licensee's Physical Security Program in light of the Three Mile Island Unit #2 Accident which occurred on March 28, 1979.

Areas reviewed included:

Security Plan, Security Organization, Physical Barriers (Protected Area), Physical Barriers (Vital Areas), Lighting, Access Control (Identification, Authorization, and Badging), Access Control (Escorting)

Access Control (Vital Areas), Alarm Stations, Detection Aids, Assessment Aids, Co.-:unications, Testing and "sintenance, Compensatory Measures, Power Supply, Response, Locks, Keys and Combinations, and Records and Reports. The inspection involved 118 hours0.00137 days <br />0.0328 hours <br />1.951058e-4 weeks <br />4.4899e-5 months <br /> onsite by two NRC inspectors.

The inspection was begun during regular hours.

A total of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> were accomplished during off-shift

,

periods.

Results:

There were no apparent items of noncompliance identified during this i

inspection which encompassed a review of 19 areas.