Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19310A399 + (07:00:37, 2 January 2025)
- 05000309/LER-1980-013-03, /03L-0:on 800507,during Routine Power Operation, Auxiliary Operator Noticed S-charging Pump Was Not Lined Up W/Required Degree of Separation.Caused by Personnel Error. Surveillance Test Procedure Revised + (07:00:39, 2 January 2025)
- 05000325/LER-1980-048-03, /03L-0:on 800508,during Normal Surveillance,Calibr Adjustment Screw Cap on Reactor Level Instrument Was Leaking Water.Caused by Inoperable Switch 2.Calibr Adjustment Screw Cap Gasket Was Replaced & Switch 2 Contacts Cleaned + (07:00:41, 2 January 2025)
- ML19310A396 + (07:00:42, 2 January 2025)
- 05000327/LER-1980-056-03, /03L-0:on 800508,common Circuit Breaker Feeding Radiation Monitors Found Opened,Causing Loss of Electrical Power.Caused by Personnel Overloading Circuit.Breaker Was Closed.Personnel Instructed on Proper Procedures + (07:00:43, 2 January 2025)
- ML19310A393 + (07:00:44, 2 January 2025)
- 05000309/LER-1980-013, Forwards LER 80-013/03L-0 + (07:00:45, 2 January 2025)
- ML19310A390 + (07:00:46, 2 January 2025)
- ML19310A389 + (07:00:47, 2 January 2025)
- 05000325/LER-1980-048, Forwards LER 80-048/03L-0 + (07:00:48, 2 January 2025)
- ML19310A386 + (07:00:49, 2 January 2025)
- ML19310A384 + (07:00:50, 2 January 2025)
- ML19310A383 + (07:00:53, 2 January 2025)
- 05000327/LER-1980-056, Forwards LER 80-056/03L-0 + (07:00:55, 2 January 2025)
- ML19310A380 + (07:00:56, 2 January 2025)
- ML19310A379 + (07:00:57, 2 January 2025)
- ML19310A378 + (07:00:57, 2 January 2025)
- ML19310A377 + (07:00:58, 2 January 2025)
- ML19310A376 + (07:00:58, 2 January 2025)
- A00986, Forwards Addl Info on SEP Topic III-6, Seismic Review, Consisting of Engineering Data or Drawings of Feedwater Line Inside Containment,Diesel Oil & Air Lines,Isolation Condenser Condensate Line & Shutdown Cooling Line + (07:00:59, 2 January 2025)
- ML19310A374 + (07:01:02, 2 January 2025)
- 05000266/LER-1980-005-03, /03L-0:on 800417,during Normal Operation,Review of Security Logs Revealed That Designated Fire Brigade Was Below Min Supervision Requirements on Three Occasions.Caused by Operations Personnel Designation Error + (07:01:03, 2 January 2025)
- ML19310A372 + (07:01:04, 2 January 2025)
- 05000254/LER-1980-012-03, /03L-0:on 800429,reactor Recirculation Motor Generator Set 1A Tripped Due to Low Oil Pressure from Lube Oil Pump 1A1 Trip.Possibly Caused by Contractor Personnel Dropping Matl on Generator Set Control Cabinet + (07:01:06, 2 January 2025)
- AECM-80-116, Forwards Final Deficiency Rept for PRD-80/24 Re Comsip,Inc Containment Gas Analysis Sys & to NRC + (07:01:06, 2 January 2025)
- 05000266/LER-1980-005, Forwards LER 80-005/03L-0 + (07:01:09, 2 January 2025)
- 05000254/LER-1980-012, Forwards LER 80-012/03L-0 + (07:01:11, 2 January 2025)
- 05000302/LER-1980-022-04, /04L-0:on 800528,samples Not Obtained for Apr from Test Wells 1 & 4 & Ph Results Not Reported for Waste Water Ponds,Test Well 5 & Discharge Canal.Caused by Elimination of Test Well Sites Due to Canal Mod & Loss of Ph Data + (07:01:12, 2 January 2025)
- ML19310A363 + (07:01:13, 2 January 2025)
- ML19310A361 + (07:01:14, 2 January 2025)
- ML19310A362 + (07:01:14, 2 January 2025)
- ML19310A360 + (07:01:15, 2 January 2025)
- ML19310A359 + (07:01:16, 2 January 2025)
- 05000302/LER-1980-022, Forwards LER 80-022/04L-0 + (07:01:17, 2 January 2025)
- ML19310A356 + (07:01:18, 2 January 2025)
- 05000334/LER-1980-031-01, /01T-0:on 800521,upon Finding Leaking RHR Sys Vent Valve Weld,Evaluation Commenced to re-energize RHR Isolation Valve in Case of Gross Failure.Caused by de-energized Process Control Signal & Vent Weld Leak + (07:01:19, 2 January 2025)
- 05000304/LER-1980-020-03, /03L-0:on 800507,maint Personnel Found Steam Generator 2A Pressure Channel 2P-516 Low by 2.6%,exceeding Channel Accuracy.Caused by Instrument Drift of Transmitter. Transmitter Recalibr + (07:01:21, 2 January 2025)
- ML19310A352 + (07:01:22, 2 January 2025)
- ML19310A351 + (07:01:23, 2 January 2025)
- 05000334/LER-1980-031, Forwards LER 80-031/01T-0 + (07:01:24, 2 January 2025)
- 05000304/LER-1980-020, Forwards LER 80-020/03L-0 + (07:01:26, 2 January 2025)
- ML19310A345 + (07:01:28, 2 January 2025)
- ML19310A346 + (07:01:28, 2 January 2025)
- ML19310A343 + (07:01:29, 2 January 2025)
- ML19310A344 + (07:01:29, 2 January 2025)
- 05000304/LER-1980-019-03, /03L-0:on 800429,during Safeguards Actuation Test, 2A Containment Spray Pump Stop Valve 2MOV-CS0002 Failed to Open.Caused by Malfunction of Torque Switch.New Torque Switch Installed + (07:01:31, 2 January 2025)
- ML19310A341 + (07:01:32, 2 January 2025)
- 05000334/LER-1980-040-01, /01T-0:on 800603,questions on Quality of Radiographs at Facility Led to Radiograph Reinsp.Caused by Personnel Error in Interpretation of Radiograph Prints. Defects Repaired & re-radiographed + (07:01:34, 2 January 2025)
- 05000304/LER-1980-019, Forwards LER 80-019/03L-0 + (07:01:35, 2 January 2025)
- ML19310A336 + (07:01:36, 2 January 2025)
- AECM-80-118, Interim Deficiency Rept Re Carbon Filters,Type NPP-2, Supplied by Farr Co. Vendor Reported That Test Equipment Used for Qualifying Filters Was Unreliable.Filters Returned for Verification of Quality & Reliabilty + (07:01:37, 2 January 2025)