Notifies NRC of Defective Comsip,Inc Containment Gas Analysis Sys.During Testing,Pump K Deadheaded for Approx 20-s & Pressure at Pump Outlet Exceeded 150 Psig.Pump Discharge Bypass Line to Be Fitted
ML19310A377
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 04/03/1980
From: Varinois C
COMSIP, INC.
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML19310A370 List:
References
NUDOCS 8006110166
Download: ML19310A377 (4)


Text

.-

-;__~

ONE*E'*[h a,W"

.o Attachment #1 to AECM-80/116 (Page 1 of 4)

  • *g %

RO Bes 132 Lwwfen. N J 07036 E

"5B -

85 -

C C

~

f 10650 E Rush Street ' '

[2$7E'2 Es*i"^

35!.?UT!Y.". P.T COG!TC !.9.7.19~~.".

,,- h./

Tetu s?41sa 3 April 1980 1

Mr. Robert H. Engelken Director, Region V Office.of Inspection and Enforcement U. S. Nuclear Regulatory Cormission 1990 N. California Boulevard, Suite 202 4

Q Walnut Creek, California 94596,

Subject:

10CRT21 Requirements /

I As required by the subject regulation, the following report Existence of a Defect Gentlemen:

is made in triplicate.

.].

Firm Identification:

Comsip, Inc.

I.

Delphi Systems Division 10650 E. Rush Street So. El Monte, California 91733 (213)442-0882 1,3 Responsible Officer making Report:

Claude Varinois, President Type of Business Activity:

Manufacturers; Containment Gas Monitoring Systems Notification of Defect as follows:

I was notified yesterday, 2 April 1980, that while in-house testing was being conducted, the following failure occured.

The contents of the report made to me by one of our Test Technicians follows:

Subject:

80-637 "K" Pump Malfunction During the testing of 80-637, one of the panel outlet valves was closed while the panel was shut-down.

The pump was then started with the valve still closed.

The following occurred;

(

1) The pump deadheaded' for no longer than 20
seconds,

,j 80 06110/ffi

e..

.e Attachm:nt #1 to AECM-80/116 (Page 2 of 4) 2i'The pressure at the pump outlet exceeded 150 psig,

3) The pressure buildup caused the connecting 9

rods to separate from the crank shaf t causing a tremendous strain on the diaphragas.

It is conceivable that these diaphrages could have ruptured, thereby breaching the integrity of the The panel valves are one cause for such system.

an event, but also the "N" stamp containment g

isolation valves, which are sometimes automatically closed, could cause the same malfunction.

I To remedy the problem, we could install a ~ check valve across the inlet and outlet of the pump.

In the event of any valves being closed in the system, the check valve would prevent any damaging build-up of pressure."

g J ~

The above report makes clear that either of the following two safety hazards exist:

up to one litre of containment gas could be released 1) into the outside atmosphere, should the failure as O_'

defined above occur; and/or if the input / outlet valve is closed while the pump

'1 2)

I is in operation or if the containment isolation valve 4

inside the containment is closed, there is a risk in damaging the system, thereby rendering the system inoperable.

Location of Tacilities where the component exists:

- Pennsylvania Power and Light Susquehanna/ Units 1 & 2

.- Mississippi P'ower and Light Grand Gulf / Units 1 8 2

- Detroit Idison Enrico Termi/ Unit 2

[ Alabama Power Company Jos. M. Earley/ Units 1 8 2

- Houston Lighting and Power Company South Texas Project / Units 1 8 2 f( )

Ni

.~

Attcchmint #1 to AECM-80/116 (Page 3 of 4)

- Tennessee Valley Authority h

Sequoyah/ Units 1 & 2

- Tennessee Valley Authority Watts Bar/ Units 1 & 2

[ - Arizona Nuclear Project Palo, Verde / Units 1, 2 5 3

- Georgia Power Company

?

Hatch / Unit 2 To the best of our knowledge, none of the plants to which this component has been supplied is currently in operation with the exception of Georgia Power Coopany, which is currently shut down fo'r maintenance.

Corrective Action to be Taken:

I

. We are in the process of puttizig a by-pass on the discharge of the pump to prevent deadheading, thereby preventing any 1

damage.

O This corrective action will be introduced on the Cleveland Nuclear Plant and will be added on all future jobs.

/

Notification of Tacilities/ Purchasers:

Notification will be made to the above facilities immediately of the defect and the corrective actions being taken and that a kit will provided them as soon as possible which will totally correct any possibility of failure / damage.

3

[

For further information, the work necessary to complete this corrective action is very minor in nature and can be easily

.h accomplished on site by a qualified pipefitter.

3..

Should your organization require any further information, I suggast you contact directly our Technical Director, Mr. Al Robinson.

h Sincerely, t>.q a

1 h..

COMSIP, Inc.

i Delphi Systems Division

(~b J Claude_Varinoi

=-

O O

~

~

iI Un I

s.

  • o 23f LL OF M ATC-f 41 A LS _-

'\\.

[

o (l')-NUPRo $5-4CA -90, coustP MoDIMeO (2)- eWAAGt or: cmPRIESSlots! F1TTIMq UNI 04 TEtt. - $5 GOO-3 j

- ss. 4oo. 3 gi TUBE EMD REQUCER - SS - 400 - R-G g

i

}(

X

'n 7g TUBING a

NOM :

g.

N- '[.

Att couPONENT9 REQUIRED To MAKtz

<lF a

Tne uoDIFIC AT'ON *tt t-SC P840VIDED ISY y[p.jling.

~~

COMSiP. sNc. INCt.UUlHQ THE At*,%)PRI ATE.

m"

!],

'd A ceR. p FIC ATIOtsj s.

TilG

(,. A tSOR. 6 HALL.

jy;f.,[

SistEu puup BG PROVIDEC) BY Tl8 G C.UCTOM CK -

9_A_fli- !L/t t%

I t IMITI A t_

issVE 2 i

,- y-SID, Inc. - OcIphi Systems Division 1[ TURill(>

/

V

. noinc. r: anel a.iraciois

~

~

- - ~

~"~

m,,e rut...r u, e.sig _

,_M o l>l F1 C A TL O N

~h23,~*

,.,,, s,,,,,.

4 > ee a G 4 44it iC17 Ai' *)[sj ggAqg

- -.