Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19318D114 + (01:15:51, 2 January 2025)
- 05000339/LER-1980-016-03, /03L-0:on 800607,during Hot Standby,Steam Supply to Steam Driven Auxiliary Feedwater Pump Was Isolated. Caused by Attempt to Repair Cap to Body Leak on Mainsteam Check Valve.Valve Repaired & Steam Supply to Pump Restored + (01:15:52, 2 January 2025)
- 05000336/LER-1980-022, Forwards LER 80-022/03L-0 + (01:15:54, 2 January 2025)
- 05000339/LER-1980-016, Forwards LER 80-016/03L-0 + (01:15:55, 2 January 2025)
- 05000293/LER-1980-023, Forwards LER 80-023/03L-0 + (01:15:57, 2 January 2025)
- ML19318D106 + (01:16:01, 2 January 2025)
- 05000278/LER-1980-013-03, /03L-0:on 800605,during Surveillance Test,Pressure Switch Ps 3 5 12C Found 0.3 Psig Above Tech Spec Limit. Caused by Setpoint Drift.Switch Recalibr,Tested & Returned to Svc + (01:16:03, 2 January 2025)
- ML19318D102 + (01:16:04, 2 January 2025)
- ML19318D104 + (01:16:04, 2 January 2025)
- ML19318D101 + (01:16:05, 2 January 2025)
- ML19318D100 + (01:16:07, 2 January 2025)
- ML19318D098 + (01:16:09, 2 January 2025)
- ML19318D094 + (01:16:09, 2 January 2025)
- ML19318D093 + (01:16:10, 2 January 2025)
- 05000336/LER-1980-018-01, During Ongoing Hanger base-plate Analysis,Both Svc Water Headers Declared Inoperable.Caused by Supports Not Providing Factor of Safety Greater than Two.Redesign & Mods Completed 800621 + (01:16:11, 2 January 2025)
- ML19318D089 + (01:16:14, 2 January 2025)
- ML19318D087 + (01:16:15, 2 January 2025)
- 05000336/LER-1980-018, Forwards Revised LER 80-018/01X-1 + (01:16:17, 2 January 2025)
- ML19318D084 + (01:16:18, 2 January 2025)
- 05000289/LER-1980-008-99, /99X-0:on 800430,during Annual Insp of a Emergency Diesel Generator,Bearing Insulation Determined Deteriorated. Caused by Normal Aging or Heating Bearing Lube Oil. Insulation Replaced & Lower Viscosity Oil Used + (01:16:20, 2 January 2025)
- ML19318D081 + (01:16:25, 2 January 2025)
- ML19318D080 + (01:16:27, 2 January 2025)
- ML19318D079 + (01:16:28, 2 January 2025)
- 05000289/LER-1980-008, Forwards LER 80-008/99X-0 + (01:16:29, 2 January 2025)
- ML19318D075 + (01:16:32, 2 January 2025)
- AECM-80-143, Status Deficiency Rept 3 Re Inadequate QA Program for Nonpressure Retaining Parts & Components.Detail of Ae Investigation Under Evaluation.Final Rept Will Be Forwarded by 800728 + (01:16:35, 2 January 2025)
- ML19318D073 + (01:16:37, 2 January 2025)
- ML19318D071 + (01:16:39, 2 January 2025)
- ML19318D072 + (01:16:39, 2 January 2025)
- ML19318D069 + (01:16:40, 2 January 2025)
- ML19318D068 + (01:16:41, 2 January 2025)
- ML19318D067 + (01:16:42, 2 January 2025)
- ML19318D066 + (01:16:43, 2 January 2025)
- ML19318D065 + (01:16:43, 2 January 2025)
- ML19318D063 + (01:16:47, 2 January 2025)
- ML19318D064 + (01:16:47, 2 January 2025)
- ML19318D062 + (01:16:49, 2 January 2025)
- ML19318D061 + (01:16:51, 2 January 2025)
- ML19318D060 + (01:16:53, 2 January 2025)
- ML19318D059 + (01:16:53, 2 January 2025)
- ML19318D057 + (01:16:54, 2 January 2025)
- ML19318D056 + (01:16:54, 2 January 2025)
- ML19318D055 + (01:16:55, 2 January 2025)
- ML19318D054 + (01:16:55, 2 January 2025)
- 05000219/LER-1980-017, /03L-0:on 800520,during Investigation of LER 80-17/1T, One Rod Free Travel Interlock Surveillance Requirements Not Performed as Required.Causec by Failure to Perform Procedure & Schedule Surveillance + (01:16:57, 2 January 2025)
- ML19318D051 + (01:17:00, 2 January 2025)
- ML19318D050 + (01:17:01, 2 January 2025)
- ML19318D048 + (01:17:01, 2 January 2025)
- 05000219/LER-1980-024, Forwards LER 80-024/03L-0 + (01:17:02, 2 January 2025)
- ML19318D045 + (01:17:03, 2 January 2025)
- 05000289/LER-1980-010-01, /01T-0:on 800606,licensee Received Ltr Stating FSAR Does Not Assume That Radioactive Release Paths Exist Via Main Safety Valves or Emergency Feed Pump Turbine Exhaust.Caused by Implementation of Small Break Guidelines + (01:17:05, 2 January 2025)